ML18101B258

From kanterella
Jump to navigation Jump to search
Forwards Combined Exam Repts 50-272/96-03OL & 50-311/96-03OL on 960122-26.Informs That All Three RO & Four SRO Candidates Passed Exam
ML18101B258
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/28/1996
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18101B259 List:
References
NUDOCS 9603120218
Download: ML18101B258 (3)


See also: IR 05000272/1996003

Text


February 28, 1996

Mr. Leon R. Eliason

Chief Nuclear Officer & President

Nuclear Business Unit

Public Service Electric and Gas Company

P. 0. Box 236

Hancocks Bridge, New Jersey 08038

SUBJECT:

COMBINED SALEM EXAMINATION REPORT NOS. 50-272/96-03 (OL) AND

50-311/96-03 (OL)

Dear Mr. Eliason:

From January 22-26, 1996, the NRC administered examinations to seven employe~s

of your company who had applied for licenses to operate the Salem Nuclear

Generating Station, Units 1 and 2.

The examination was conducted in

accordance with Revision 7 of NUREG-1021, ttOperator Licensing Examiner

Standards.tt

At the conclusion of the examination,

generic findings and

observations that evolved as a result of the examination were discussed with

Messrs. J. McMahon and C. Bakken and other members of your staff identified in

the enclosed report.

Based on the results of the examinations, all three of the reactor operator

(RO) candidates and all four of the senior reactor operator {SRO) candidates

passed the examination.

The licenses for five of the seven candidates were

not issued, however, since completion of five reactivity manipulations

required by 10 CFR 55.3l{a){5) had not yet been accomplished due to the Salem

units being in an extended shutdown condition.

Upon completion of the

reactivity manipulations, licenses will be issued to these five candidates.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

No reply to this letter is required, but should you have any questions

regarding this examination, please contact me at 610-337-5211.

9603120218 960228

PDR

ADOC~ 05000272

V

PDR

Docket Nos. 50-272; 50-311

Sincerely,

~~~~.*

Glenn W. Meyer, Chief

Operator Licensing and

- Human

~erforniance Branch

Division of Reactor Safety

Enclosure:

Examination Report Nos. 50-272/96-03 (OL)

and 50-311/96-03 {OL) w/Attachments 1-3.

_1., Dt>ikJ

Mr. Leon R. Eliason

2

cc w/encl; w/o Attachments 1-3:

L. Storz, Senior Vice President'- Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

C. Warren, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. Macfarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

cc w/encl and Attachments 1-3:

J. McMahon, Manager, Nuclear Training

G. Mecchi, Principal Training Supervisor

Distribution w/encl and Attachments 1-3:

DRS Master Exam File

PUBLIC

Nuclear Safety Information Center (NSIC)

Distribution w/encl; w/Attachments 1-3:

Region I Docket Room (with concurrences)

J. Wiggins, DRS

P. Bissett, Chief Examiner, DRS

K. Parkinson, Contractor (Sonalysts)

G. Weale, Contractor (Sonalysts)

NRC Resident Inspector

DRS OL Facility File

. -

Mr. Leon R. Eliason

3

Distribution w/encl; w/o Attachments 1-3 (Via E-Mail):

l. Olshan, NRR

W. Dean, DEDO

J. Stolz, PDI-2, NRR

S. Richards, OLB/NRR

J. Zimmerman, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (!PAS)

DOCUMENT NAME:

A:SA960303.INS

To r9C8ive a copy of this document, indicate in the box: *c* = Copy without attachment/enclosure "E" = c;:<>py ~ith attachment/enclosure -*111* = No

- copy

- -

NAME

DATE

02/

/96

02/

/96

02/

/96

- . / .. -

l

,'"i *"

ICIAL RECORD COPY