ML18101B249
| ML18101B249 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 12/31/1995 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18101B248 | List: |
| References | |
| NUDOCS 9603040293 | |
| Download: ML18101B249 (10) | |
Text
PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOCK'S BRIDGE, NJ 08038 PAGE: 1 OF 2 DATE: 02/12196 SALEM 1 REGULATORY GUIDE 1.16 STANDARD FOF'MAT FOR REPORTING NUMBER OF PERSON-JEL AND MAN-REM REPORT PERIOD WORK AND JOB FUNCTION (PERSONNEL GROUPING)
REACTOR OPERATION I SURVEILLANCE MAINTENANCE OPERATING HEAL TH PHYSICS CHEMISTRY SUPERVISORY ENGINEEERING l&C SECURITY ROUTINE MAINTENANCE MAINTENANCE OPERATING HEAL TH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING l&C SECURITY INSERVICE INSPECTION MAINTENANCE OPERATING HEAL TH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING l&C SECURITY SPECIAL MAINTENANCE MAINTENANCE OPERATING HEAL TH PHYSICS CHEMISTRY SUPERVISORY ENGINEERING l&C SECURITY 9603040293 960223 PDR ADOCK 05000272 R
PDR BY WORK AND JOB FUNCTION 01/01195-12131195 NUMBER OF PERSONNEL TOTAL MAN-MREM
(> 100 MREM)
STATION UTILITY CONTRACT STATION
.UTILITY CONTRACT EMPLOYEES EMPLOYEES WORKERS EMPLOYEES EMPLOYEES WORKERS
& OTHERS
&OTHERS 3
1 0
980 159 8
2 0
0 600 112 0
4 0
0 1220 0
4 0
0 0
0 0
0 0
0 0
10 4
0 0
0 0
12 32 0
0 0
0 32 0
0 0
0 0
0 0
8 15 1
6 6272 1263 3n5 11 1
0 4246 620 792 14 0
0 3512 164 418 0
0 0
86 90 14 0
0 0
112 37 124 1
0 0
406 558 214 0
0 1
415 16 303 0
0 0
2 0
0
- *J*
0 1
3 56 1052 1443 0
1 1
113 543 537 0
0 0
9 22 106 0
0 0
0 6
0 0
0 0
4 0
43 0
0 0
4 264 33 0
0 0
23 0
6 0
0 0
0 0
0 5
1 22 2045 538 6504 0
0 1
239 44 222 0
0 0
2n 0
40 0
0 0
0 0
0 0
0 0
32 8
1 0
0 0
28 3
0 0
0 0
4 30 0
0 0
0 0
0 0
-~
PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOCK'S BRIDGE, NJ 08038 PAGE: 2 OF 2 DATE: 02/12196 SALEM 1 REGULA TORY GUIDE 1.16 STANDARD FO:!MAT FOR REPORTING NUMBER OF PERSOl~*~El AND MAN-REM REPORT PERIOD BY WORK AND JOB FUNCTION 01/01195-12/31195 NUMBER OF PERSONNEL TOTAL MAN-MREM WORK AND JOB FUNCTION
(> 100 MREM)
(PERSONNEL GROUPING)
STATION UTILITY CONTRACT STATION UTILITY CONTRACT EMPLOYEES EMPLOYEES WORKERS EMPLOYEES EMPLOYEES WORKERS
&OTHERS
& OTHERS WASTE PROCESSING MAINTENANCE 1
0 1
165 53 124 OPERATING 0
0 0
18 4
104 HEAL TH PHYSICS 0
0 0
483 75 541 CHEMISTRY 0
0 0
0 0
0 SUPERVISORY 0
0 0
0 0
0 ENGINEEERING 0
0 0
29 15 0
l&C 0
0 0
0 0
0 SECURITY 0
0 0
0 0
0 REFUELING MAINTENANCE 24 7
135 7707 3302 62454 OPERATING 4
0 38 3083 520 16660 HEAL TH PHYSICS 22 0
44 7885 165 15036 CHEMISTRY 0
0 0
50 29 10 SUPERVISORY 0
0 3
55 1
2486 ENGINEERING 0
0 0
83 279 146 l&C 0
0 3
122 2
1125 SECURITY 0
0 0
6 2
0 TOTAL MAINTENANCE 48 11 167 17225 6367 74308 OPERATING 17 2
40 8299 1843 18315 HEAL TH PHYSICS 40 0
44 13366 426 16145 CHEMISTRY 0
0 0
136 125 24 SUPERVISORY 0
0 3
213 50 2654 ENGINEERING 1
0 0
562 1151 393 l&C 0
0 4
596 48 1434 SECURITY 0
0 0
8 2
8 GRAND TOTAL 106 13 258 40405 10012 113281 PERSONNEL EXPOSURE AND MONITORING REPORT FOR NRC DOCKET EXPOSURE YEAR: 1995 NUMBER: 50-272 LICENSEE: PUBLIC SERVICE ELECTRIC & GAS COMPANY DATE: 02/12196
ENCLOSURE 2
i i!,.
I PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOCK'S BRIDGE, NJ 08038 SALEM2 PAGE: 1 OF2 DATE: 02112196 REGULATORY GUIDE 1.16 STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION REPORT PERIOD 01/01/95-12131195 NUMBER OF PERSONNEL TOTAL MAN-MREM WORK AND JOB FUNCTION
(> 100 MREM)
(PERSONNEL GROUPING)
STATION UTILITY CONTRACT STATION UTILITY CONTRACT EMPLOYEES EMPLOYEES WORKERS EMPLOYEES EMPLOYEES WORKERS
&OTHERS
& OTHERS REACTOR OPERATION I SURVEILLANCE MAINTENANCE 0
0 0
228 22 5
OPERATING 0
0 0
156 38 17 HEAL TH PHYSICS 0
0 0
109 0
0 CHEMISTRY 0
0 0
0 0
0 SUPERVISORY 0
0 0
2 0
0 ENGINEEERING 0
0 0
6 0
0 l&C 0
0 0
0 4
0 SECURITY 0
0 0
0 0
8 ROUTINE MAINTENANCE MAINTENANCE 0
0 0
1455 753 1188 OPERATING 0
0 0
1796 246 391 HEAL TH PHYSICS 3
0 0
1401 160 502 CHEMISTRY 0
0 0
39 2
0 SUPERVISORY.
0 0
0 53 0
5 ENGINEERING 0
0 0
99 146 36 l&C 0
0 0
79 2
39 SECURITY 0
0 0
2 0
0 INSERVICE INSPECTION MAINTENANCE 0
0 0
27 23 405 OPERATING 0
0 0
26 20 55 HEAL TH PHYSICS 0
0 0
9 0
80 CHE~ISTRY 0
0 0
0 0
0 SUPERVISORY 0
0 0
4 0
8 ENGINEERING 0
0 0
4 21 4
l&C 0
0 0
23 0
6 SECURITY 0
0 0
0 0
0
- .PECIAL MAINTENANCE MAINTENANCE 1
0 1
1670 124 555 OPERATING 0
0 1
258 87 486 HEAL TH PHYSICS 0
0 0
73 0
1 CHEMISTRY 0
0 0
1 0
0 SUPERVISORY 0
0 0
73 0
0 ENGINEERING 0
0 0
39 2
7 l&C 0
0 0
9 0
4 SECURITY 0
0 0
0 0
0
- -***.....,._........ --*------~
I PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOC~S BRIDGE, NJ 08038 PAGE: 2 OF 2 DATE: 02/12196 SALEM 2 REGULATORY GUIDE 1.16 STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REM REPORT P,ERIOD BY WORK AND JOB FUNCTION 01/01195-12131195 NUMBER OF PERSONNEL TOTAL MAN-MREM WORK AND JOB FUNCTION
(> 100 MREM)
(PERSONNEL GROUPING)
STATION UTILITY CONTRACT STATION UTILITY
- . CONTRACT EMPLOYEES EMPLOYEES WORKERS EMPLOYEES EMPLOYEES WORKERS
& OTHERS
& OTHERS WASTE PROCESSING MAINTENANCE 1
0 1
165 53 124 OPERATING 0
0 0
16 0
104 HEAL TH PHYSICS 0
0 0
461 75 541 CHEMISTRY 0
0 0
0 0
0 SUPERVISORY 0
0 0
0 0
0 ENGINEEERING 0
0 0
29 15 0
l&C 0
0 0
0 0
0 SECURITY 0
0 0
0 0
- .. 0 REFUELING MAINTENANCE 9
4 78 3726 1712 19052 OPERATING 2
0 20 2146 213 5181 HEAL TH PHYSICS 7
0 10 2050 14 2664 CHEMISTRY 0
0 0
27 o*
0 SUPERVISORY 0
0 0
116 30 7
ENGINEERING 0
1 0
252 613 117 l&C 0
0 1
193
.14
. 564 SECURITY 0
0 0
0 1
0
- -.1*
TOTAL MAINTENANCE 11 4
80 7271 2687 21329 OPERATING 2
0 21 4398 604 6234 HEAL TH PHYSICS 10 0
10 4103 249 3788 CHEMISTRY 0
0 0
67 2
0 SUPERVISORY 0
0 0
248 30 20 ENGINEERING 0
1 0
429 797 164 l&C 0
0 1
304 20 613 SECURITY 0
0 0
2 1
8 GRAND TOTAL 23 5
112 16822 4390 32156 PERSONNEL EXPOSURE AND MONITORING REPORT FOR EXPOSURE YEAR: 1995 NRCDOCKET NUMBER: 50-311 LICENSEE: PUBLIC SERVICE ELECTRIC & GAS COMPANY DA TE: 02/12196
ENCLOSURE 3
~--
~
- -~
- ~
- J.,
. i.
,_,,j
,, **.. _) *,~:~;:;Li1 PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOCK'S BRIDGE, NJ 08038 PAGE: 1 OF 2 DATE: 02/12196 HOPE CREEK REGULA TORY GUIDE 1.16 STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND ~A<\\N-REM REPORT PERIOD BY WORK AND JOB FUNCTION 01/01195-12/31195 NU.MBER OF PERSONNEL TOTAL MAN-MREM WORK AND JOB FUNCTION
(> 100 MREM)
(PERSONNEL GROUPING)
STATION UTILITY CONTRACT STATION UTILITY CONTRACT EMPLOYEES EMPLOYEES WORKERS EMPLOYEES EMPLOYEES WORKERS
& OTHERS
- .&OTHERS REACTOR OPERATION I SURVEILLANCE MAINTENANCE 14 1
5 3224
'** 580 1919 OPERATING 36 0
0 11439 427 1493 HEAL TH PHYSICS 18 0
1 3604 17 593 CHEMISTRY 5
0 0
1285 15 1
SUPERVISORY 0
0 0
23 8
142 ENGINEEERING 0
0 0
117 88 3
l&C 3
0 0
2100 27 63 SEC::.!RITY 0
0 0
0 21 44 ROUTINE MAINTENANCE MAINTENANCE 11 0
1 3202 129 359 OPERATING 3
0 0
985 64 116 HEAL TH PHYSICS 0
0 0
494 0
28 CHEMISTRY 0
0 0
0 1
0 SUPERVISORY 0
0 0
1 2
0 ENGINEERING 0
0 0
102 220 1
l&C 0
0 0
268 0
0 SECURITY 0
0 0
1 3
0 INSERVICE INSPECTION MAINTENANCE 0
2 38 42 542 13987 OPERATING 0
1 21 103 432 10866 HEAL TH PHYSICS 0
0 0
125 0
66 CHEMISTRY 0
1 0
0 135 0
SUPERVISORY 0
0 2
0 0
296 ENGINEERING 0
1 0
40 355 116 l&C 0
0 0
13 2
0 SECURITY 0
0 0
0 1
- O SPECIAL MAINTENANCE MAINTENANCE 63 7
87 23610 2132 23074 OPERATING 19 3
33 7463 1257 9008 HEAL TH PHYSICS 27 0
4 5996 70 1370 CHEMISTRY 0
0 0
169 20 0
SUPERVISORY 0
0 1
46 17 235 ENGINEERING 2
2 1
388 667 183 l&C 23 0
0 6856 58 29 SECURITY 0
0 0
0 8
0
--~.... -* -*
- -- * ~-*:**
- *.* *--~-~*.,- **
-:,~.*.-. -'.:"-:J
PUBLIC SERVICE ELECTRIC & GAS COMPANY HANCOCK'.S BRIDGE, NJ 08038 HOPE CREEK
- .-~
PAGE: 20F2 DATE: 02/12196 REGULATORY GUIDE 1.16 STANDARD FORMAT FOR REPORTING NUMBER OF PERSOlNEL ~ 'ID MAN-REM BY WORK AND JOB FUNCTION REPORT PERIOD 01/01195-12131195 NUMBER OF PERSONNEL WORK AND JOB FUNCTION (PERSONNEL GROUPING)
STATION EMPLOYEES WASTE PROCESSING MAINTENANCE 0
OPERATING 7
HEAL TH PHYSICS 9
CHEMISTRY 0
SUPERVISORY 0
ENGINEEERING 0
l&C 0
SECURITY 0
REFUELING MAINTENANCE 2
OPERATING 6
HEAL TH PHYSICS 13 CHEMISTRY 0
SUPERVISORY 0
ENGINEERING 0
l&C 0
SECURITY 0
TOTAL MAINTENANCE 90 OPERATING 71 HEAL TH PHYSICS 67 CHEMISTRY 5
SUPERVISORY 0
ENGINEERING 2
l&C 26 SECURITY 0
GRAND TOTAL 261 PERSONNEL EXPOSURE AND MONITORING REPORT FOR EXPOSURE YEAR: 1995 LICENSEE: PUBLIC SERVICE ELECTRIC & GAS COMPANY
(> 100 MREM)
UTILITY CONTRACT EMPLOYEES WORKERS
&OTHERS 0
0 0
1 1
1 0
0 0
0 0
0 0
0 0
0 4
62 1
51 0
9 0
0
- 0 0
0 1
0 0
0 0
14 193 5
106 1
15 1
0 0
3 3
2 0
0 0
0 24 319 TOTAL MAN-MREM STATION EMPLOYEES 203 1466 3045 37 0
0 86 0
979 2436 4451 2
31 91 229 0
31260 23892 17715 1493 101 738 9552 1
84752 UTILITY CONTRACT EMPLOYEES WORKERS
&OTHERS 144 0
36 392 252 233 0
0 0
0 139 0
0 0
0 0
1415 17870 505 14033 c.-0 3647 3
0 6
137 89 155 0
11 3
0 4942 57209 2n1 35908 339 5937 174 1
33 810 1558 458 87 103 36 44 9890 100470 NRC DOCKET NUMBER: ~54 DA TE: 02/12196 1
'1 I
ENCLOSURE 4
-.-. - -.... : --.. *- 1
There were no challenges to the Main Steam Safety Relief Valves at Hope Creek during the reporting period.
The following table contains the Refueling Outage 6 as found testing results:
Position Setpoint As Found Drift A
1130 1144
- 1. 24%
B 1130 1114
-1.42%
c 1130 1205 6.64%
D 1130 1159 2.56%
E 1130 1303 15.31%
F 1108 1169 5.51%
G 1120 1153 2.95%
H 1108 1119 0.99%
J 1120 1125 0.45%
K 1108 1074
-3.07%
L 1120 1123 0.27%
M 1108 1110 0.18%
p 1120 1141 1.88%
R 1120 1136
- 1. 43%
The requirements of Hope Creek Technical Specification Section 3/4.4.2 specify that valves are to be within+/- 1% of safety valve function settings.
The issue of setpoint drift was reported in LER 95-036-00, dated December 27, 1995.
As stated in the LER, PSE&G will continue to work with the BWR Owners Group SRV setpoint drift fix committee to reso~ve the setpoint drift issue associated with two stage Target Rock SRVs.
-***:-;***-~--- ___,.._.__
- --~- -* --~
---~ ~..... ***~---~---~-.**** --....-.