ML18101B250

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant
ML18101B250
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/26/1996
From: Dawn Powell
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101B251 List:
References
LCR-H95-06, LCR-H95-6, LCR-S95-13, LR-N96015, NUDOCS 9603050130
Download: ML18101B250 (2)


Text

e PS~G -

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit FEB 2 6 1996 LR-N96015 LCR S95-13 (Salem)

LCR-H95-06* (Hope Creek)

United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

-MARKED-UP PAGES FOR LICEN~E CHANGE REQUESTS S95-13 and H95-06 FOR SALEM GENERATING STATION UNITS 1 AND 2 AND HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NUMBERS DPR-70 1 DPR-75 1 AND NPF-57 DOCKET NOS. 50-272, 50-311, AND 50~354 Public Service Electric and Gas Company's (PSE&G) letter dated January 11, 1996 (LR-N95092)' requested an amendment to the Facility Operating Licenses DPR-70 and DPR-75 for Salem Generating station, Unit Nos. 1 and 2, and NPF-57 for Hope Creek Generating Station. The requested amendment revised Section 6.0 (Administrative Controls) of the Salem and Hope Creek Generating Stations' Technical Specifications.

The amendment request inadvertently omitted two sections, 6.2.1.d and 6.2.2.a, on page 6-1 of the Salem Unit 2 specifications. The omitted sections were not affected by the amendment request and are included on the attached marked-up page for Salem Unit 2.

The amendment relocates Section 6.5, Review and Audits, from each set of Technical Specifications. Section 6.5 contains the requirements associated with the Station Operations Review Committee (SORC) and the Offsite Safety Review Group (OSR).

Previously submitted page 6-16 of the Salem Units 1 & 2 and page 6-14 of the Hope Creek Technical Specifications utilized ~h~ _

initials of the two review gr-cups. For clarl. ty I - the group names I in their entirety, have been added to the attached marked-up pages.

Please replace the previously submitted marked-up pages with the four attached pages.

- - - - ..,,~,...---- -- -*- - - '\

, --- -~96o395oi 30 6~8~~~ 72 PDR ADOCK PDR p

The power is in your hands.

95-2168 REV. 6/94

.. FEB 2 6 1996 Document Control Desk 2 LR-N96015 Should you have any questions or comments on this submittal, please do not hesitate to contact us.

Sincerely, D. R. Powell Manager Nuclear Licensing & Regulation Attachments (4)

C Mr. T. T. Martin, Administrator - Region I

u. s. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. D. Jaffe, Licensing Project Manager - Hope Creek
u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail stop 14E21 Rockville, MD 20852 Mr. c. Marschall(X24)

USNRC Senior Resident Inspector Mr. R. Summers (X24)

USNRC Senior Resident Inspector Mr. Kent Tosch, Manager, IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625