Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18153B626 + (00:09:32, 6 January 2025)
- ML18153B625 + (00:09:33, 6 January 2025)
- ML18153B623 + (00:09:33, 6 January 2025)
- ML18153B622 + (00:09:34, 6 January 2025)
- 05000280/LER-1989-003-01, :on 890120,during Installation of Inside Recirculation Spray Pump B Motor,Damage to Insulation of One of Motor Power Feeder Cables Observed.Probably Caused by Handling of Flex Conduit + (00:09:35, 6 January 2025)
- ML18153B620 + (00:09:36, 6 January 2025)
- ML18153B619 + (00:09:37, 6 January 2025)
- ML18153B618 + (00:09:38, 6 January 2025)
- ML18153B617 + (00:09:39, 6 January 2025)
- ML18153B612 + (00:09:40, 6 January 2025)
- ML18153B610 + (00:09:41, 6 January 2025)
- 05000280/LER-1989-002-01, :on 890108 & 27,leak Tests Performed on Unit 1 & Unit 2 Excore Flux Monitoring Sys Cables Respectively. Evaluation of Both Units Cables Concluded Replacement Necessary.Cables for Unit 1 Flux Monitor Were Replaced + (00:09:42, 6 January 2025)
- ML18153B608 + (00:09:43, 6 January 2025)
- ML18153B607 + (00:09:44, 6 January 2025)
- ML18153B606 + (00:09:45, 6 January 2025)
- ML18153B605 + (00:09:45, 6 January 2025)
- 05000280/LER-1989-001-03, :on 890106,unplanned Actuation of ESFs Component Occurred.Caused by Failed Diode in Engine Control Circuit.Failed Diode Replaced + (00:09:53, 6 January 2025)
- 05000281/LER-1989-001-02, :on 890105,loss of Containment Integrity Occurred During Refueling Operations.Caused by Loss of Administrative Controls Due to Procedural Deficiencies. Refueling Integrity Procedures Modified + (00:09:56, 6 January 2025)
- ML18153B601 + (00:09:57, 6 January 2025)
- IR 05000280/1988049 + (00:09:59, 6 January 2025)
- ML18153B599 + (00:10:00, 6 January 2025)
- 05000280/LER-1988-046, :on 881231,alarm Received in Control Room Indicating That Valve 1-SW-263 Had Closed.Caused by Personnel Error.Operators Verified That No Fire Existed in Room 3.Valve Opened & Chiller C Restarted + (00:10:01, 6 January 2025)
- IR 05000280/1988042 + (00:10:04, 6 January 2025)
- ML18153B596 + (00:10:05, 6 January 2025)
- ML18153B595 + (00:10:06, 6 January 2025)
- ML18153B594 + (00:10:07, 6 January 2025)
- ML18153B593 + (00:10:08, 6 January 2025)
- IR 05000280/1988035 + (00:10:09, 6 January 2025)
- IR 05000280/1988045 + (00:10:13, 6 January 2025)
- ML18153B588 + (00:10:15, 6 January 2025)
- ML18153B589 + (00:10:15, 6 January 2025)
- ML18153B586 + (00:10:16, 6 January 2025)
- ML18153B583 + (00:10:19, 6 January 2025)
- ML18153B580 + (00:10:20, 6 January 2025)
- ML18153B578 + (00:10:21, 6 January 2025)
- ML18153B579 + (00:10:21, 6 January 2025)
- ML18153B577 + (00:10:22, 6 January 2025)
- ML18153B575 + (00:10:23, 6 January 2025)
- ML18153B572 + (00:10:24, 6 January 2025)
- ML18153B574 + (00:10:24, 6 January 2025)
- ML18153B571 + (00:10:25, 6 January 2025)
- ML18153B569 + (00:10:26, 6 January 2025)
- ML18153B570 + (00:10:26, 6 January 2025)
- 05000281/LER-1988-025-02, :on 881208,determined That Power Supplies for Two Safety Injection Valve Operators Reversed.Caused by Error During Initial Plant Const.Engineering Work Request Issued to Correct as-found Conditions + (00:10:28, 6 January 2025)
- ML18153B567 + (00:10:29, 6 January 2025)
- ML18153B566 + (00:10:30, 6 January 2025)
- ML18153B565 + (00:10:31, 6 January 2025)
- 05000280/LER-1988-034, :on 881203 & 14,main Control Room C & Emergency Switchgear Room Chiller Tripped.Caused by Insufficient Water Flow to Chiller C & Lack of Calibr on Chiller Condenser Pressure Control Valves.Valves Adjusted + (00:10:33, 6 January 2025)
- IR 05000280/1988047 + (00:10:35, 6 January 2025)
- ML18153B560 + (00:10:37, 6 January 2025)
- ML18153B561 + (00:10:37, 6 January 2025)