e JAN l 9 1989

~irginia Electric and Power Company ATTN:

Mr. W. R. Cartwright, Vice President Nuclear Operations 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT:

CONFIRMATION OF ENFORCEMENT CONFERENCE ARRANGEMENTS DOCKET NOS. 50-280 AND 50-281 This confirms the conversation between D. A. Sommers of your staff and F. S. Cantrell of my staff, on December 23, 1988, concerning an Enforcement Conference to be conducted at the NRC Region II Office on January 26, 1989, at 9:00 a.m.

We requested this meeting to discuss safety system concerns and corrective action problems which have occurred at Surry.

Enclosed is a proposed meeting agenda.

Should you have any questions concerning this letter, please contact us..

Enclosure:

Proposed Meeting Agenda cs w/encl:

vfil. R. Kansler, Station Manager v-R": F. Saunders, Manager - Nuclear Programs and Licensing Commonwealth of Virginia bee w/encl:

~

Resident Inspector DRS Technical Assistant Document Control Desk 8901300343 890119 PDR ADOCK 05000280 G

PNU RII

-c ~,

    • -~/)

sshaeff er: sda Ol/ 07/89

~on 01/\\1 /89 Sincerely, Original si_gned by Malcolm L. Ernst Acting Regional Administrator RI!

dlJ1 c..

DCollins 01/ /!f/89 RI I ~

01/ /89 RII,~

~yes 01/

89

~

I ENCLOSURE PROPOSED MEETING AGENDA VIRGINIA ELECTRIC AND POWER COMPANY MEETING WITH NRC JANUARY 26, 1989

. I.

Opening Remarks II.

Issues of Concern A.

Inadequate Design/Design Configuration Control

i.

The Service Water System SSFI Findings.

as described in Inspection Report No. 50-280, 281/88-32.

ii.

Low Head Safety Injection Motor Operated Valves (MOV) as described in Inspection

  • Report No. 50-280, 281/88-45.

B.

Reactor Cavity Seal Leak Issues As Described in Inspection Reports No. 50-280, 281/88-34 and 88-23.

C.

Failure to Take Corrective Action Regarding:

i.

Control Room Envelope Ventilation System issues as discussed in Inspection Report No. 280, 281/88-41.

ii.

High Head Safety Injection Pump Gas Binding issue as discussed in Inspection Report No. 280, 281/88-41.

D.

Root Cause Corrective Actions - Common Issues (Those identified above and in Inspection Report Nos. 50-280, 281/88-45; AFW pump motor wetting and LER root cause determination).

III. Concluding Remarks.

IV.

Break V.

Discussion of MOV Non-Escalated and other Restart Issues VI.

Closing Remarks NRC VEPCO VEPCO/NRC VEPCO NRC

.