ML18153B593
| ML18153B593 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 01/11/1989 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cartwright W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18151A204 | List: |
| References | |
| NUDOCS 8901300250 | |
| Download: ML18153B593 (2) | |
Text
January 11, 1989 Virginia Electric and Power Company ATTN~
Mr. W. R. -Cartwright, Vice President, Nuclear Operations 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:
SUBJECT:
SURRY EXAMINATION REPORT - 50~280 and 50-281/0L-88-02 The NRC administered examinations on*october 24-27, 1988, to employees of your company who had applied for licenses to operate tne Surry Nuclear Plant.
At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
Copies of the written examination questions and answer key are included in this report as Enclosure 2.
- Facility comments regarding the written examination are included in this report as Enclosure 3. summarizes simulator*
performance deficiencies observed during conduct of the simulator portion of the operating examinations.
In accordance with 10 CFR 2.790(a), *a copy of this letter and its enclosures will be placed in NRC 1 s Public Document Room.
Should you have any questions concerning this letter, please contact us.
Enclosures:
- 1.
Exam Report 50-280/0L-88-02
- 2.
RO/SRO Exam Questions & Answer Key
- 3.
Facility Comments 4.. Simulation Facility Fidelity Report cc w/encls 1 & 3:
B. Shriver, Corporate Training Dir.
M. R. Kansler, Plant Manager cc w/encls 1, 2, 3 & 4:
A. Friedman, Site Training Director Sincerely, (ORIGINAL SIGNED BY M. SHYMLOCK FOR)
Caudle A. Julian, Chief Operations Branch Division of Reactor Safety bee:
(S~e Page 2) 8901300250 89011.1 PDR ADDCK 05000280 V
PNU
I*
Virginia Electric and Power Company bee w/encl 1:
- B. Buckley, Projeci Manager, NRR F. Cantrell, Section Chief, DRP D. C. Payne, OL Examiner, DRS Commonwealth of Virginia bee w/encls 1, 2, 3, & 4:
Senior Resident Inspector Operator Licensing Branch, DLPQ:NRR L-Bt:rc'ument Control Desk PNL, Contractor
.~analyst, Contractor 3
RI I/JI)
RI I.i./
~ t'
,:Jtt)
DCP~y/le:tm
~Munro RII d01JV
/1/.t..P'J 01/ 'f /89
, 01/ I lil/89 FCantre1 l 01//~ /89 vJ':!kµ//
Ril
'1'(('1()t,_..
CAj61 i Ml 01/1) /89 January 11, 1989