Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000237/LER-1986-019-04, :on 860811,while Reactor Operating at 91%,main Turbine Tripped on +55 Inches Reactor Water Level Which Resulted in Full Reactor Scram.Caused by Failure of Feedwater Regulating Valve a to Close + (22:30:31, 6 December 2024)
- ML20209J082 + (22:30:32, 6 December 2024)
- ST-HL-AE-1479, Final Deficiency & Part 21 Rept Re Westinghouse Circuit Breakers in 125-volt Dc Distribution Switchboards Supplied by Hatch,Inc.Initially Reported on 851002.Insert Will Be Secured to Termination Plate + (22:30:37, 6 December 2024)
- ML20209J080 + (22:30:37, 6 December 2024)
- ML20209J078 + (22:30:38, 6 December 2024)
- ML20209J077 + (22:30:38, 6 December 2024)
- ML20209J075 + (22:30:39, 6 December 2024)
- PNO-III-86-092, JC Haynes Pleaded Guilty to Charges of Making False Statement & Illegal Possession of Byproduct Matl Re Illegal Possession of Am-241.Haynes Will Make Restitution & No Longer Deal W/Nuclear Matls + (22:30:39, 6 December 2024)
- ML20209J073 + (22:30:40, 6 December 2024)
- ML20209J071 + (22:30:41, 6 December 2024)
- ML20209J068 + (22:30:41, 6 December 2024)
- ML20209J067 + (22:30:45, 6 December 2024)
- ML20209J066 + (22:30:45, 6 December 2024)
- AECM-86-0278, Monthly Operating Rept for Aug 1986 + (22:30:46, 6 December 2024)
- ML20209J065 + (22:30:46, 6 December 2024)
- ST-HL-AE-1506, Third Interim Deficiency Rept Re Magnetics QA Program. Initially Reported on 850320.Magnetics Completed Walkdown to Evaluate Accessible Welds of All Installed Panels.Next Rept Will Be Submitted by 851231 + (22:30:47, 6 December 2024)
- ML20209J057 + (22:30:48, 6 December 2024)
- ML20209J060 + (22:30:48, 6 December 2024)
- ML20209J056 + (22:30:49, 6 December 2024)
- ML20209J055 + (22:30:50, 6 December 2024)
- ML20209J054 + (22:30:51, 6 December 2024)
- ML20209J053 + (22:30:51, 6 December 2024)
- ML20209J052 + (22:30:52, 6 December 2024)
- B17824, Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 + (22:30:53, 6 December 2024)
- ML20209J049 + (22:30:53, 6 December 2024)
- ML20209J044 + (22:30:56, 6 December 2024)
- ML20209J040 + (22:30:57, 6 December 2024)
- ML20209J042 + (22:30:57, 6 December 2024)
- ML20209J039 + (22:30:58, 6 December 2024)
- ML20209J036 + (22:30:59, 6 December 2024)
- IR 05000483/1986010 + (22:31:00, 6 December 2024)
- PNO-I-87-038, on 870429,licensee Learned That Control Room Operator Tested Positive for Use of Controlled Substance. Employee Will Be Terminated.Individual Acceptance Into Rehabilitation Program Under Consideration + (22:31:00, 6 December 2024)
- IR 05000348/1985041 + (22:31:01, 6 December 2024)
- ML20209J031 + (22:31:02, 6 December 2024)
- 05000278/LER-1986-018-01, :on 860811,reactor Protection Sys Initiated Full Scram on Low Water Level Condition.Caused by Electrical Fault in Circuit Breaker Compartment Due to Abraded Insulation of Cable.Circuit Breaker Replaced + (22:31:03, 6 December 2024)
- ML20209J028 + (22:31:04, 6 December 2024)
- ML20209J026 + (22:31:05, 6 December 2024)
- ML20209J027 + (22:31:05, 6 December 2024)
- ML20209J024 + (22:31:06, 6 December 2024)
- ML20209J025 + (22:31:06, 6 December 2024)
- ML20209J022 + (22:31:07, 6 December 2024)
- B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start + (22:31:08, 6 December 2024)
- ML20209J021 + (22:31:08, 6 December 2024)
- ML20209J018 + (22:31:09, 6 December 2024)
- 05000285/LER-1987-007, :on 870326,incorrect Wiring of Containment post-accident Water Level Transmitter Failed to Give Correct Indication During Surveillance Test.Caused by Technician Error.Procedures Revised + (22:31:10, 6 December 2024)
- ML20209J014 + (22:31:11, 6 December 2024)
- ML20209J008 + (22:31:12, 6 December 2024)
- 05000285/LER-1987-006, :on 870327,unplanned Actuation of Channel B Containment Pressure High Signal (Cphs) Occurred.Caused When Instrument Tees Left Capped & Cphs Setpoints Exceeded by Technician.Technicians Instructed + (22:31:14, 6 December 2024)
- ML20209J004 + (22:31:15, 6 December 2024)
- ML20209J003 + (22:31:16, 6 December 2024)