p OPERATING DATA REPORT BOCKET NO. 50-266 DATE september 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
AUGUST 1986
- 3. LICENSED THERMAL POWER (MWT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MUE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATlNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE jg
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE
-nlo THIS MONTH YR TO EATE CUMULATIVE SS ano
- 11. HOURS IN REPORTING PERIOD 744 5,831 138,671
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 4,980.3 112,453.3 p3 g PlO
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.0 645.4 oO
- 14. HOURS GENERATOR ON LINE 744.0 4,865.5 109,772.3 f,4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 28.0 832.0 gg
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,074,052 7,136,70?
150,304,653 ac o
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 359,560 2,434,630 50,586,310 03 '"
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 343,253 2,326,209 48,145,141
- 19. UNIT SERVICE FACTOR 100.0 83.4 79.2
- 20. UNIT AVAILABILITY FACTOR 100.0 83.9 79.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.1 82.3 71.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 92.8 80.3 69.9
- 23. UNIT FORCE 3 OUTAGE RATE 0.0 0.5 2.2
- 24. SHUTDOWNS SCHEDULED GVED NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ' NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
t DOCKET NO.
50-266 UNIT NAME Point Beach, Unit 1 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
497 11 '
493 21 488 2
495 12 489 22 479 3
492 13 493 23 470 4
492 14 497 24 441 5
495 15 500 25 436 6
496 16 499 26 437 7
498 17 499 27 389 8
496 18 496 28 378 9
497 19 496 29 367 10 479 20 491 30 250 31 277 EQR-28a (04-86)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-266 UNIT NAME Point Berch Unit 1 DATE September 4, 1986 -
REPORT MONTH August, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 c
5 a
82 "c
a "a
5 1
Y$
0 t $O 0'e
$*e eo e
oao Licensee Event ut o.c Cause & Corrective Action No.
Date g
{}d$
Report No.
$,0
@0 To Prevent Recurrence g
m U
yyM a
m 7
860829 S
49.0 B
N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological fouling from condenser tubes 4 Exhibit G-Instructions 3 Method:
1 F:
Forced 2 Reason:
S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown SExhibit I-Same Source Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (06-86)
e NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-266 Unit Name Point Beach Unit 1 Date September 4' 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 1 operated at 496 MWe net throughout the period with one scheduled load reduction.
On August 29, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from the inside of the condenser tubes.
No safety-related maintenance was performed on the unit during the period.
9 e
e
e OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD AUGUST 1986
- 3. LICENSED THERMAL POWER (MUT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.
- 6. MAXIhUM DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
l NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,831 123,456
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,827.2 109,375.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.4
- 14. HOURS GENERATOR ON LINE 744.0 5,781.6 107,582.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.9 244.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,083,054 8,543,168 151,423,038
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 362,170 2,885,840 51,301,690
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 345,189 2,755,755 48,870,241
- 19. UNIT SERVICE FACTOR 100.0 99.2 87.1
- 20. UNIT AVAILABILITY FACTOR 100.0 99.3 87,3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.7 97.4 80.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.4 95.1 79.6
- 23. UNIT FORCED OUTAGE RATE 0.0 0.4 1.2
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Annual refueling / maintenance outage, 09/26/86 - 11/16/86
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
DOCKET NO.
50-301 UNIT NAME Point Beach, Unit 2 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
493 11 '
488 21 480 2
491 12 483 22 456 3
465 13 487 23 411 4
487 14 491 24 271 5
490 15 492 25 192 6
492 16 493 26 396 7
492 17 493 27 482 8
492 18 489 28 468 9
493 19 487 29 481 10 492 20 482 30 485 31 487 EQR-28a (04-86)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-301 UNIT NAME Point Berch Unit 2 DATE September 4, 1986 ~
REPORT MONTH August 1986 COMPLETED BY C.
W.
Krause TELEPHONE 414/277-2001 o
4J ca a
- 4 Q o c
o (a c
o M
W r4 44 o
tb o li e c an No.
Date N5 E
ENU Licensee Event 0$
SS Cause & Corrective Action jj 3
$d@
Report No.
$8
@O To Prevent Recurrence m
U g] a:
Q m
e 7
860823 S
49.0 B
N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological' fouling from condenser tubes.
~
i e
1F:
Forced 2 Reason:
aMethod:
4 Exhibit G-Instructions S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (06-86)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No.
50-301 Unit Name Point Beach Unit 2 Date September 4, 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 2 operated at 492 MWe net throughout the period with one scheduled load reduction.
On August 23, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from inside the condenser tubes.
Safety-related maintenance performed during the period includes repair of minor oil leaks on two snubbers on the high pressure safety injection piping.
i I
o I
O
n
% Sin Electnc eom couem 231 W. MICHIG AN. P.O. BOX 2046. MILWAUKEE.Wl 53201 (414)277-2345
.h VPNPD-86-407 NRC-86-90 September 9, 1986 Director of Nuclear Regulatory Operations U.
S'.
NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Gentlemen:
P MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1986.
Very truly yours,
.h
((d y C. W.
Fay Vice President Nuclear Power Attachments Copies to R.
S. Cullen, PSCW J.
G.
Keppler, NRC Region III NRC Resident Inspector rE2-4
. J/ /.