p OPERATING DATA REPORT BOCKET NO. 50-266 DATE september 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1

. NOTES

2. REPORTING PERIOD:

AUGUST 1986

3. LICENSED THERMAL POWER (MWT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MUE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATlNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE jg
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE

-nlo THIS MONTH YR TO EATE CUMULATIVE SS ano

11. HOURS IN REPORTING PERIOD 744 5,831 138,671
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 4,980.3 112,453.3 p3 g PlO
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 11.0 645.4 oO
14. HOURS GENERATOR ON LINE 744.0 4,865.5 109,772.3 f,4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 28.0 832.0 gg
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,074,052 7,136,70?

150,304,653 ac o

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 359,560 2,434,630 50,586,310 03 '"
18. NET ELECTRICAL ENERGY GENERATED (MWH) 343,253 2,326,209 48,145,141
19. UNIT SERVICE FACTOR 100.0 83.4 79.2
20. UNIT AVAILABILITY FACTOR 100.0 83.9 79.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 95.1 82.3 71.1
22. UNIT CAPACITY FACTOR (USING DER NET) 92.8 80.3 69.9
23. UNIT FORCE 3 OUTAGE RATE 0.0 0.5 2.2
24. SHUTDOWNS SCHEDULED GVED NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ' NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

t DOCKET NO.

50-266 UNIT NAME Point Beach, Unit 1 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

497 11 '

493 21 488 2

495 12 489 22 479 3

492 13 493 23 470 4

492 14 497 24 441 5

495 15 500 25 436 6

496 16 499 26 437 7

498 17 499 27 389 8

496 18 496 28 378 9

497 19 496 29 367 10 479 20 491 30 250 31 277 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-266 UNIT NAME Point Berch Unit 1 DATE September 4, 1986 -

REPORT MONTH August, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 c

5 a

82 "c

a "a

5 1

Y$

0 t $O 0'e

$*e eo e

oao Licensee Event ut o.c Cause & Corrective Action No.

Date g

{}d$

Report No.

$,0

@0 To Prevent Recurrence g

m U

yyM a

m 7

860829 S

49.0 B

N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological fouling from condenser tubes 4 Exhibit G-Instructions 3 Method:

1 F:

Forced 2 Reason:

S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown SExhibit I-Same Source Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

e NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-266 Unit Name Point Beach Unit 1 Date September 4' 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 1 operated at 496 MWe net throughout the period with one scheduled load reduction.

On August 29, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from the inside of the condenser tubes.

No safety-related maintenance was performed on the unit during the period.

9 e

e

e OPERATING DATA REPORT DOCKET NO. 50-301 DATE September 4, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2

. NOTES

2. REPORTING PERIOD AUGUST 1986
3. LICENSED THERMAL POWER (MUT): 1518.
4. NAMEPLATE RATING (GROSS MWE):

523.8

5. DESIGN ELECTRICAL RATING (NET MWE): 497.
6. MAXIhUM DEPENDABLE CAPACITY (GROSS MWE): 509.
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

l NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 5,831 123,456
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5,827.2 109,375.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.4
14. HOURS GENERATOR ON LINE 744.0 5,781.6 107,582.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.9 244.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,083,054 8,543,168 151,423,038
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 362,170 2,885,840 51,301,690
18. NET ELECTRICAL ENERGY GENERATED (MWH) 345,189 2,755,755 48,870,241
19. UNIT SERVICE FACTOR 100.0 99.2 87.1
20. UNIT AVAILABILITY FACTOR 100.0 99.3 87,3
21. UNIT CAPACITY FACTOR (USING MDC NET) 95.7 97.4 80.7
22. UNIT CAPACITY FACTOR (USING DER NET) 93.4 95.1 79.6
23. UNIT FORCED OUTAGE RATE 0.0 0.4 1.2
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Annual refueling / maintenance outage, 09/26/86 - 11/16/86

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

DOCKET NO.

50-301 UNIT NAME Point Beach, Unit 2 DATE September 4, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH August 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

493 11 '

488 21 480 2

491 12 483 22 456 3

465 13 487 23 411 4

487 14 491 24 271 5

490 15 492 25 192 6

492 16 493 26 396 7

492 17 493 27 482 8

492 18 489 28 468 9

493 19 487 29 481 10 492 20 482 30 485 31 487 EQR-28a (04-86)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-301 UNIT NAME Point Berch Unit 2 DATE September 4, 1986 ~

REPORT MONTH August 1986 COMPLETED BY C.

W.

Krause TELEPHONE 414/277-2001 o

4J ca a

    • 4 Q o c

o (a c

o M

W r4 44 o

tb o li e c an No.

Date N5 E

ENU Licensee Event 0$

SS Cause & Corrective Action jj 3

$d@

Report No.

$8

@O To Prevent Recurrence m

U g] a:

Q m

e 7

860823 S

49.0 B

N/A N/A ZZ ZZZZZZ Reduced power for cleaning biological' fouling from condenser tubes.

~

i e

1F:

Forced 2 Reason:

aMethod:

4 Exhibit G-Instructions S:

Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other (explain)

G - Operational Error (explain)

H - Other (explain)

EQR-28B (06-86)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.

50-301 Unit Name Point Beach Unit 2 Date September 4, 1986 Completed By C. W. Krause Telephone 414/277-2001 Unit 2 operated at 492 MWe net throughout the period with one scheduled load reduction.

On August 23, 1986, load was reduced for approximately 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> to allow cleaning biological fouling from inside the condenser tubes.

Safety-related maintenance performed during the period includes repair of minor oil leaks on two snubbers on the high pressure safety injection piping.

i I

o I

O

n

% Sin Electnc eom couem 231 W. MICHIG AN. P.O. BOX 2046. MILWAUKEE.Wl 53201 (414)277-2345

.h VPNPD-86-407 NRC-86-90 September 9, 1986 Director of Nuclear Regulatory Operations U.

S'.

NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Gentlemen:

P MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT DOCKETS 50-266 AND 50-301 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of August 1986.

Very truly yours,

.h

((d y C. W.

Fay Vice President Nuclear Power Attachments Copies to R.

S. Cullen, PSCW J.

G.

Keppler, NRC Region III NRC Resident Inspector rE2-4

. J/ /.