Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-1990-003-01, :on 900323,heater Drain Sys Pipe Leak Developed Downstream Into Unit 1 Turbine Bldg,Causing Halon Sys for Emergency Switchgear Room to Spuriously Actuate.Caused by Pipe Failure.Halon Sys Recharged + (23:58:22, 5 January 2025)
- IR 05000280/1990010 + (23:58:25, 5 January 2025)
- ML18153C191 + (23:58:26, 5 January 2025)
- ML18153C190 + (23:58:27, 5 January 2025)
- TAC:75465 + (23:58:28, 5 January 2025)
- ML18153C189 + (23:58:29, 5 January 2025)
- 05000280/LER-1990-001-03, :on 900314,emergency Svc Water Pumps Declared Inoperable Due to Emergency Shutdown Device Being in Tripped Condition.Caused by Procedural & Training Deficiencies. Procedures Changed & Training Enhanced + (23:58:31, 5 January 2025)
- ML18153C187 + (23:58:32, 5 January 2025)
- ML18153C186 + (23:58:33, 5 January 2025)
- 05000280/LER-1990-002-02, :on 900315,containment Vacuum Pump Auto Started But Tripped Immediately.Caused by Binding of Pump Internals Due to Moisture Accumulation.New Pump Installed.Pumps Will Be Inspected on Periodic Basis + (23:58:35, 5 January 2025)
- IR 05000280/1990008 + (23:58:37, 5 January 2025)
- ML18153C182 + (23:58:44, 5 January 2025)
- IR 05000280/1990003 + (23:58:46, 5 January 2025)
- ML18153C179 + (23:58:48, 5 January 2025)
- ML18153C178 + (23:58:49, 5 January 2025)
- IR 05000280/1990004 + (23:59:03, 5 January 2025)
- ML18153C173 + (23:59:05, 5 January 2025)
- IR 05000280/1990005 + (23:59:22, 5 January 2025)
- ML18153C170 + (23:59:24, 5 January 2025)
- ML18153C169 + (23:59:25, 5 January 2025)
- ML18153C168 + (23:59:25, 5 January 2025)
- ML18153C167 + (23:59:26, 5 January 2025)
- ML18153C163 + (23:59:27, 5 January 2025)
- ML18153C166 + (23:59:27, 5 January 2025)
- TAC:74736 + (23:59:29, 5 January 2025)
- ML18153C160 + (23:59:29, 5 January 2025)
- ML18153C159 + (23:59:31, 5 January 2025)
- TAC:75763 + (23:59:31, 5 January 2025)
- ML18153C158 + (23:59:33, 5 January 2025)
- ML18153C157 + (23:59:33, 5 January 2025)
- ML18153C155 + (23:59:34, 5 January 2025)
- IR 05000280/1990011 + (23:59:35, 5 January 2025)
- ML18153C152 + (23:59:37, 5 January 2025)
- ML18153C151 + (23:59:38, 5 January 2025)
- ML18153C150 + (23:59:39, 5 January 2025)
- IR 05000280/1989032 + (23:59:40, 5 January 2025)
- ML18153C147 + (23:59:41, 5 January 2025)
- IR 05000280/1990006 + (23:59:42, 5 January 2025)
- ML18153C144 + (23:59:44, 5 January 2025)
- ML18153C143 + (23:59:45, 5 January 2025)
- IR 05000280/1990001 + (23:59:46, 5 January 2025)
- ML18153C141 + (23:59:47, 5 January 2025)
- ML18153C139 + (23:59:48, 5 January 2025)
- ML18153C137 + (23:59:49, 5 January 2025)
- ML18153C135 + (23:59:49, 5 January 2025)
- ML18153C133 + (23:59:50, 5 January 2025)
- 05000281/LER-1990-002-01, :on 900205,two Control Rods of Control Bank D Differed from Rod Group Demand Counter by Greater than 12 Steps.Caused by Inadequate Procedures.Rampdown Stopped & Individual Rod Position Indicators Adjusted + (23:59:51, 5 January 2025)
- ML18153C131 + (23:59:53, 5 January 2025)
- ML18153C129 + (23:59:54, 5 January 2025)
- ML18153C128 + (23:59:54, 5 January 2025)
- IR 05000280/1989034 + (23:59:55, 5 January 2025)
- ML18153C126 + (23:59:56, 5 January 2025)