Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN:
Mr. W. L. Stewart Senior Vice President - Power 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:
April 2, 1990 SUBJECT:
NRC INSPECTION REPORT NOS. 50-280/90-08 AND 50-281/90-08 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by C. * Smith on February 26 - March 2, 19'9 The inspectiqn included a review of activities authorized for your Surry facilit At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed Inspection Repor Areas examined during the inspection are identified in the repor Within these areas, the inspection consisted of selective examinations of procedures and representative records; interviews With personnel, and observation of ~ctivities in progres Within the scope of the inspection, violations or deviations were not identifie In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u Enclosure NRC Inspecti6n Report cc w/encl:
E. W. Harrell Vice President - Nuclear Operations Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 (cc w/encl cont 1d - See page 2)
9004190004 900402 PDR ADOCK 05000280 Q
Sincerely, (ORIGINAL SIGNED BY A. F. GIBSON)
Albert F. Gibson, Director Division of Reactor Safety
~-
Virginia Electric and Power Company
bee w/encls cont'd NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 166
-
Surry, VA 23883 FOR PREVIOUS CONCURRENCE - SEE ATTACHED COPY RI!: DRS
- CSrnith 03/ /90 RI!: DRS
- RMoore 03/ /90 RI!: DRS
- FJape 03/ /90 RI!: DRP
- Report Nos. :
UNITED STATES
. NUCLEAR REGULATORY COMMISSION REGION 11 101 MARIETTA STREET, ATLANTA, GEORGIA 30323 50-280/90-08. and 50-281/90-08
.,.Licensee:
Vi rgi ni a Electric and Power Company Glen Allen, VA 23060 Docket Nos.:
50-280 and 50-281 License Nos.: DPR-32 and DPR-37 Facility Name:
Surry 1 and 2 Inspection Conducted:
February 26 - March 2, 1990 Iospectors:~ 1*)l.12...,, m*
.~ £/J]&;g <
~Moore
.
Approved by:~ /J2tf2//.,t__.- ~
F.ape~ection Chief
.
~.
Quality Performance Section Operations Branch Division of Reactor Safety SUMMARY Scope:
~ /so/96 Datt! Si ghe'd.
3/3a/r;:D Date S1gned Dale S'igned This routine, special announced inspection was conducted in the areas of follow-up on licensee's activities delineated in the Surry Integrated Inspection Pla Results:
In the areas inspected, violations or deviations were not identifie The licensee has met Level II Nuclear Project Report schedule milestones for the following functional areas:
(1) Procurement; (2) Set Point Control Program; (3) System Engineering Program and (4) Root Cause Analysis and Trending Progra The recently developed programs have established administrative controls to correct previously identified deficiencie An assessment of the effectiveness of the new programs was not accomplished due to the limited implementation period.