Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253B390 + (13:36:18, 4 January 2025)
- 05000309/LER-1979-020-03, /03L-0:on 790910,routine Review for Discharges Made 790910-16 Indicated Waste Liquid Radiation Monitor Did Not Respond as Expected for Releases.Caused by Waste Liquid Radiation Monitor Being Out of Calibr + (13:36:20, 4 January 2025)
- 05000278/LER-1979-027-03, /03L-0:on 790909,during Surveillance Test Performance,High Pressure Svc Water Pump 3D Tripped.Caused by Insecure Motor Leads of High Pressure Svc Water Pump Motor.Procedures Will Be Modified + (13:36:22, 4 January 2025)
- ML19253B386 + (13:36:23, 4 January 2025)
- 05000309/LER-1979-020, Forwards LER 79-020/03L-0 + (13:36:24, 4 January 2025)
- 05000259/LER-1979-022-03, /03L-0:on 790910,during Normal Operation, Annunciator Became Inoperable.Caused by Power Supply Overload,Resulting in Damaged Resistor.Two Connectors Found to Have Been Crossed During Repairs + (13:36:26, 4 January 2025)
- ML19253B381 + (13:36:27, 4 January 2025)
- ML19253B378 + (13:36:30, 4 January 2025)
- ML19253B376 + (13:36:31, 4 January 2025)
- ML19253B375 + (13:36:32, 4 January 2025)
- 05000259/LER-1979-022, Forwards LER 79-022/03L-0 + (13:36:33, 4 January 2025)
- ML19253B371 + (13:36:34, 4 January 2025)
- 05000259/LER-1979-025-01, /01T-0:on 790926,during Normal Operation,Main Steam Lines Not Isolated within 8-h Following Main Steam Line High Temp Logic Actuation.Caused by Misinterpretation of Tech Specs.Revision of Specs Proposed + (13:36:35, 4 January 2025)
- ML19253B368 + (13:36:39, 4 January 2025)
- 05000259/LER-1979-025, Forwards LER 79-025/01T-0 + (13:36:44, 4 January 2025)
- ML19253B365 + (13:36:46, 4 January 2025)
- ML19253B363 + (13:36:47, 4 January 2025)
- ML19253B364 + (13:36:47, 4 January 2025)
- 05000333/LER-1979-057-01, /01T-0:on 790927,as Result of Pipe Stress Reanalysis,Plant Was Notified That Five Pipe Supports Were Considered Inoperable.Caused by Piping Overstress.All Mods & Analyses Performed within Tech Spec Framework + (13:36:49, 4 January 2025)
- ML19253B359 + (13:36:51, 4 January 2025)
- ML19253B358 + (13:36:53, 4 January 2025)
- ML19253B355 + (13:36:54, 4 January 2025)
- ML19253B356 + (13:36:54, 4 January 2025)
- ML19253B354 + (13:36:55, 4 January 2025)
- ML19253B353 + (13:36:56, 4 January 2025)
- ML19253B352 + (13:36:57, 4 January 2025)
- ML19253B351 + (13:36:58, 4 January 2025)
- ML19253B350 + (13:36:59, 4 January 2025)
- ML19253B348 + (13:37:01, 4 January 2025)
- ML19253B347 + (13:37:02, 4 January 2025)
- ML19253B346 + (13:37:02, 4 January 2025)
- ML19253B345 + (13:37:04, 4 January 2025)
- ML19253B344 + (13:37:04, 4 January 2025)
- ML19253B343 + (13:37:06, 4 January 2025)
- ML19253B342 + (13:37:06, 4 January 2025)
- ML19253B341 + (13:37:08, 4 January 2025)
- ML19253B340 + (13:37:09, 4 January 2025)
- ML19253B339 + (13:37:10, 4 January 2025)
- ML19253B338 + (13:37:11, 4 January 2025)
- ML19253B336 + (13:37:12, 4 January 2025)
- ML19253B334 + (13:37:14, 4 January 2025)
- ML19253B331 + (13:37:16, 4 January 2025)
- ML19253B329 + (13:37:20, 4 January 2025)
- ML19253B328 + (13:37:22, 4 January 2025)
- ML19253B326 + (13:37:23, 4 January 2025)
- ML19253B325 + (13:37:24, 4 January 2025)
- ML19253B323 + (13:37:25, 4 January 2025)
- ML19253B322 + (13:37:29, 4 January 2025)
- ML19253B320 + (13:37:36, 4 January 2025)
- ML19253B319 + (13:37:43, 4 January 2025)
- ML19253B318 + (13:37:44, 4 January 2025)