Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214V851 + (05:02:27, 4 December 2024)
- ML20214V848 + (05:02:28, 4 December 2024)
- ML20214V845 + (05:02:29, 4 December 2024)
- ML20214V843 + (05:02:31, 4 December 2024)
- ML20214V840 + (05:02:32, 4 December 2024)
- ML20214V837 + (05:02:32, 4 December 2024)
- ML20214V835 + (05:02:33, 4 December 2024)
- ML20214V832 + (05:02:34, 4 December 2024)
- ML20214V830 + (05:02:35, 4 December 2024)
- ML20214V829 + (05:02:35, 4 December 2024)
- ML20214V826 + (05:02:36, 4 December 2024)
- B12204, Forwards Reviews of Isap Topic 1.14.1, Curbs Ramps Water Control Structures,Seals & Shields & Isap Topic 1.49, Steam Generator Tube Integrity + (05:02:37, 4 December 2024)
- ML20214V823 + (05:02:37, 4 December 2024)
- L-86-474, Submits Results of Spike Sample Analysis of Confirmatory Measurements Program Samples,Per NRC 860829 Request + (05:02:38, 4 December 2024)
- AECM-86-0373, Special Rept 86-005/1 Re Inoperability of Seismic Monitoring Sys.Sys Removed from Svc to Support Installation of Addl Reactor Piping Support Strong Motion Accelerometer (Sma).New SMA Installed on Piping Support in HPCS Line + (05:02:39, 4 December 2024)
- PNO-II-87-031, on 870519,low Level Radioactively Contaminated Water Leaked Into Turbine Bldg.Caused by Pressurization of Crud Tank.Some Contaminated Water Diluted & Discharged Into Savannah River.Decontamination Efforts Continuing + (05:02:39, 4 December 2024)
- ML20214V815 + (05:02:41, 4 December 2024)
- ML20214V816 + (05:02:41, 4 December 2024)
- ML20214V814 + (05:02:42, 4 December 2024)
- ML20214V813 + (05:02:44, 4 December 2024)
- ML20214V812 + (05:02:45, 4 December 2024)
- ML20214V808 + (05:02:46, 4 December 2024)
- B12197, Forwards Reviews of Isap Topic 2.01, Secondary Side Chemistry Monitoring, Isap Topic 2.04, Modernize Reactor Protection & Control Sys & Isap Topic 2.05, Process Computer Replacement + (05:02:47, 4 December 2024)
- ML20214V807 + (05:02:47, 4 December 2024)
- ML20214V804 + (05:02:48, 4 December 2024)
- ML20214V802 + (05:02:49, 4 December 2024)
- IR 05000362/1986024 + (05:02:50, 4 December 2024)
- ML20214V800 + (05:02:50, 4 December 2024)
- ML20214V797 + (05:02:51, 4 December 2024)
- ML20214V796 + (05:02:51, 4 December 2024)
- ML20214V793 + (05:02:53, 4 December 2024)
- ML20214V789 + (05:02:54, 4 December 2024)
- ML20214V792 + (05:02:54, 4 December 2024)
- ML20214V787 + (05:02:55, 4 December 2024)
- ML20214V786 + (05:02:56, 4 December 2024)
- ML20214V784 + (05:02:57, 4 December 2024)
- TXX-6514, Forwards Rev 1 to Comanche Peak Response Team Results Repts Issue Specific Action Plans VII.a.1, Matl Traceability, VII.a.2, Nonconformance & Corrective Action Sys & VII.b.4, Hilti Anchor Bolt Installation + (05:02:58, 4 December 2024)
- ML20214V781 + (05:02:59, 4 December 2024)
- ML20214V776 + (05:03:00, 4 December 2024)
- IR 05000282/1987007 + (05:03:01, 4 December 2024)
- ML20214V774 + (05:03:01, 4 December 2024)
- ML20214V770 + (05:03:02, 4 December 2024)
- ML20214V768 + (05:03:03, 4 December 2024)
- ML20214V767 + (05:03:04, 4 December 2024)
- PNO-II-87-033, on 870522,plant Taken Out of Svc to Repair Two Leaks in Resistance Temp Detector Loop on RCS Cold Leg. Shutdown of Greater than 48 H Estimated for Cleanup of Boric Acid & Repair.Unit Will Remain in Hot Standby + (05:03:08, 4 December 2024)
- ML20214V764 + (05:03:09, 4 December 2024)
- 05000458/LER-1986-064, :on 861031,grounded Metal Isolation Can Inadvertently Brought Into Contact w/24-volt Dc Power Iodine Cooling Fins of Power Supply B21K613B,resulting in Stated Trips.Caused by Personnel Error + (05:03:11, 4 December 2024)
- ML20214V749 + (05:03:12, 4 December 2024)
- ML20214V751 + (05:03:12, 4 December 2024)
- ML20214V746 + (05:03:13, 4 December 2024)
- ML20214V744 + (05:03:14, 4 December 2024)
- ML20214V742 + (05:03:14, 4 December 2024)