Georgia Fbwer Company 333 Piedmont Avenue Atlanta Georgia 30308 Teltphone 404 526-6S26 Mading Address:
Ibst Office Dc4 4545 Atlanta. Georgia 30302 Georgia Power L.T.Oucwa (le mutton curric system Manager Nuclear Safety and Licensing SL-2581 0317m X7GJ17-V750 June 5, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 CHANGES IN INITIAL STARTUP TEST PROGRAM 4
Gentlemen:
The following information is provided in accordance with Operating License Condition 2.C.(3) whereby Georgia Power Company is to report any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59.
The Power Coefficient Determination Test, described in FSAR Section l
14.2.8.2.26, has been revised to reflect the conduct of this test at the 100 sercent power plateau, rather than the 90 percent power plateau as i
prev'iously depicted.
This revision 'is in conformance with the
)
recommendations of Regulatory Guide 1.68, " Initial Test Programs for Hater-Cooled Nuclear Power Plants."
Enclosed is an abstract of the revised test.
The revisions to the test abstract will be incorporated in a future 4
FSAR amendment.
Please contact this office if you have any questions.
Sincerely,
&*r &_=
L. T. Gucwa i
l EMB/Im
Enclosure:
4 1
1.
Test Abstract Revision f
c:
(see next page) t 8706120300 870605 DR ADOCK0500g4
.~.
- ~ -
'GeorgiaPower A U. S. Nuclear Regulatory Commission June 5, 1987 Page Two' c: Georaia Power Comoany Mr. R. E. Conway Mr. J. P. O'Reilly Mr. G. Bockhold, Jr.
Mr. J. F. D'Amico Mr. C. H. Hayes j
GO-NORMS i
Southern Comoany Services Mr. R. A. Thomas Mr. J. A. Bailey 4
l Shaw. Pittman. Potts & Trowbridae Mr. B. H. Churchill, Attorney-at-Law i
1 Troutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law i
U1_S. Nuclear Regulatory Commission l
Dr. J. N. Grace, Regional Administrator
)
Ms. M. A. Miller, Licensing Project Manager, NRR (2 copies)
Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle Georaians Aaainst Nuclear Enerav i
l Mr. D. Feig l
Ms. C. Stangler i
)
a I
i
.t 0317m l
=tts n
'd Georgia Power d ENCLOSURE PLANT V0GTLE - UNIT ~1 NRC DOCKET 50-424 1
OPERATING LICENSE NPF-68 CHANGES IN INITIAL STARTUP TEST PROGRAM 14.2.8.2.26 Power Coefficient Determination Test A.
Objective To verify nuclear design predictions of the doppler-only power coefficient.
B.
Prerequisites 1.
Reactor power level is at the.specified testing plateau (30, 50, 75, and 100 percent power).
Reactor. coolant l
temperature and pressure, and_ rod cluster control (RCC) bank configurations are at normal operating conditions and are stable.
2.
All subsystems which affect overall plant transient response, except the rod control system, should, whenever possible, be in automatic control.
C.
Test Method 1.
Plant conditions are stabilized at selected power levels (30, 50, 75, and 100 percent).
The plant load is varied, l
using the turbine-generator controller, in a
manner approximating step changes of about 2-to 4-percent power.
2.
The doppler-only power coefficient verification factor is determined from correlative measurements of reactor coolant system temperature and core thermal power output.
D.
Acceptance Criterion The doppler-only power coefficient verification factor agrees with the value given in the nuclear fuel design report.
i 4
}
0317m E-1 06/05/87 SL-2581 l
7007TS