Rev 0 to TVA Employee Concerns Task Group,Other Sites:Draft Generic Emergency Preparedness Plan
ML20214V767
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/07/1986
From: Birchell R, Debbage A, Knightly J
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20214T770 List:
References
SWEC-SQN-57, SWEC-SQN-57-R, SWEC-SQN-57-R00, NUDOCS 8612090817
Download: ML20214V767 (4)


Text

r  !

e TENNESSEE VALLEY AUTHORITY WATTS DAR NUCLEAR PLANT EMPLOYEE CONCERNS TASK GROUP OTHER SITES CEG Element

Title:

Draft Gereric Emergency Preparedness Plan SWEC Concerns: L44850801112-001 Source Document: NRC Letter, Dated July 29, 1985, Roger D. Walker to H. G. Parris Report Number: SWEC-SQN-57 Evaluator: JAf /O 3 b

'R. C. Birchell Daile Reviewed By: y /0 J. J. Knightly Date Approved By: /0[7/(f A.G.Debbge' D'a te' 8612090817 861120 PDR ADOCK 05000327 13~46T P PDR

s Report SWEC-SQN-57 Draft Generic Emergency Preparedness Plan I. INTRODUCTION In a letter to TVA (reference 1), dated July 29, 1985, the NRC summarized a June 6, 1985 meeting between TVA and Nuclear Regulatory Commission (NRC) personnel in the NRC Region II office. The purpose of the meeting was to discuss questions concerning the TVA draft generic emergency plan. This issue was discussed in the Stone & Webster Engineering Corporation (SWEC) systematic analysis, as follows:

L4485080lll2-001, Review of draft generic emergency plan.

Information on the background, the corrective actions taken, the verification methodology and analysis, the completion status, and any pertinent references for these items ir included in this report.

II. VERIFICATION OF SWEC ISSUES A. Background The NRC identified that some sections of the emergency plan did not satisfy the cross-reference requirements to NUREG-0654.

B. Corrective Actions Taken Discussions held with Mr. Tommy Youngblood, SQN Radiological Emergency F an Coordinator, indicated that all the questions concerning the draft generic emergency plan were resolved in the June 6, 1985 meeting at the NRC Region II office. The Radiological Emergency Plan (REP) (reference 2) was revised and approved at SQN on September 30, 1985. This revision was submitted to the NRC on October 8, 1985. The NRC then performed an unannounced inspection (reference 3) November 18 - 22, 1985 in the area of emergency preparedness. No violations or deviations were identified by the inspection team.

C. Verification Methodolor,y The SWEC concern identified for Employee Concerns Task Group (ECTG) verification was stated as follows

RIMS # ISSUE RIMS ITEM l

L44 850801 112 Review of draft RIMS-001 generic emergency plan l

Page 1 of 2 l

b ECTG reviewed the Sequoyah Compliance Licensing files for internal and external correspondence related to this issue, the applicable procedure, and interviewed responsible personnel for this issue.

This formed the basis for this verification activity.

D. Verification Analysis The ECTG review indicated that the issue has been adequately resolved. The REP was revised and submitted to NRC and no additional concerns have been identified. In addition, the unannounced inspection performed after the REP was revised identified no violations or deviations.

E. Completion Status Based on SQN corrective actions, no further action on this item is required. This SWEC concern is closed.

III. REFERENCES (1) NRC letter to TVA, dated July 29, 1985, Roger D. Walker to H. G. Parris (2) SQN Radiological Emergency Plan, Revision 20, dated September 30, 1985 (3) NRC Inspection Report Number 50-327-/85-41, 50-328/85-41, dated December 19, 1985, David M. Verre111 to H. G. Parris l

l l

l Page 2 of 2 l L.

TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-SQN-57 SPECIAL PROGRAM REPORT TYPE: Sequoyah Nuclear Plant Element REVISION NUMBER: 0 TITLE: Draft Generic Emergency Prepardeness Plan REASON FOR REVISION: N/A SWEC

SUMMARY

STATEMENT: The item in this report was identified by the Nuclear Regulatory Comnission (NRC) and was included in the Stone & Webster Engineering Corporation (SWEC) systematic analysis. The item evaluated within this report was verified to be adequately addressed. The Employee Concerns Task Group considers the item closed.

PREPARATION PREPARED BY:

M P 3 C , 4 2 , f re 8 :J,M //-//- 2 (o

/ (AiIGNAIURE DATE REVIEWS PEER:

W 8I fI3 -flier SIGNATURE DATE AY a // 36 SIGNATURE DATE CONCURRENCES f

CEG-H: & lll/2ltl SRP0N,t.d,]U fp //-///-7(c SIGNATURE DATE

[ SIGNATU(( DATE APPROVED BY:

h fA l ECSP MAsAG61 l $~ h N/A DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)

  • SRP Secretary's signature denotes SRP concurrences are in files.

2242T