ML20214V776
| ML20214V776 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 09/25/1986 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20214V779 | List: |
| References | |
| PY-CEI-OIE-0241, PY-CEI-OIE-241, NUDOCS 8610020406 | |
| Download: ML20214V776 (1) | |
Text
THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622 9800 - lLLUMINATING BLDG - 55 PUBLIC SQUARE Serving The Best Location in the Nation September 25, 1986 PY-CEI/0IE-0241 L MURRAY R. EDELMAN SR VCE PREstDENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt' Road Glen Ellyn, Illinois Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Submittal of Emergency Plan Revision 6
Dear Mr. Keppler:
Pursuant to 10CFR50 Appendix E Part V, the Cleveland Electric Illuminating Company hereby submits three (3) controlled copies of Revision 6 of the Perry Nuclear Power Plant (PNPP) Emergency Plan (Volume 15 Part A of the PNPP Operations Manual). This revision incorporates improvements in the emergency preparedness program including items identified in our annual 10CFR50.54(t) audit and recent NRC inspections and other changes. This revision does not reduce the effectiveness of the Emergency Plan, as described in 10CFR50.54(q).
The enclosed pages and binders replace in their entirety the previous revision of the Emergency Plan. Please replace all copies of the previous revision as indicated on the attached document transmittal form and return the signed form to acknowledge receipt.
If there are any questions, please feel free to call.
Very truly yours, Wtu /b
A i
Murray R.
delman Senior Vice President Nuclear Group MRE:njc Enclosure cc: Document Control Desk (USNRC) w/2 attach.
Jay Silberg, Esq.
John Stefano l OAS K. Connaughton 8610020406 860925 N
PDR ADOCK 05000440 I
F p99