ML20214V848

From kanterella
Jump to navigation Jump to search
Revised Staff Requirements Memo Re 861120 Periodic Meeting W/Numarc in Washington,Dc Concerning Committee Activities Including,Access Authorization,Training Accreditation, Fitness for Duty & Operator Requalification
ML20214V848
Person / Time
Issue date: 12/05/1986
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
REF-10CFR9.7 M861120B, NUDOCS 8612090876
Download: ML20214V848 (2)


Text

._

IN RESPONSE, PLEASE j9 D

UNITED STATES

[

k NUCLEAR REGULATORY COMMISSION M

e-E WASHIN GTON, D.C. 20555 z

%*****J December 5, 1996 OFFICE OF THE SECRETARY MEMORANDUM FOR THE RECORD FROM:

muel J. Chilk, Secretary

SUBJECT:

STAFF REQUIREMENTS - PERIODIC MEETING WITH NUMARC, 2:00 P.M.,

THURSDAY, NOVEMBER 20, 1986, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

The Commission met with the Nuclear Utility Management and Human Resources Committee (NUMARC) for a status briefing on the following committee activities:

access authorization, training accreditation, fitness for duty, maintenance, operator requali-fication, station blackout, containment integrity, safety goals, decay heat removal, check valve reliability, 10 CFR 50.59, plant life extension, and the upcoming restructuring of the nuclear power industry associations.

Presentations by NUMARC were made by the following representatives:

- James H. Miller, Jr., Chairman NUMARC Steering Committee President, Georgia Power Company

- Warren H.

Owen, Vice Chairman NUMARC Steering Committee Executive Vice President Engineering, Construction and Production Group Duke Power

- Bruce Kenyon, Chairman NUMARC Security Working Group Senior Vice President of Nuclear Pennsylvania Power and Light Company

- John H. Ferguson, Chairman NUMARC Technical Subcommittee President and CEO Virginia Power 8612090876 861205 PDR 10CFR PT9.7 CF l

_2_

Commissioner Asselstine urged NUMARC to place high priority on maintenance efforts and suggested an early meeting for NUMARC to present its plans.

There were no staff requirements set at this meeting.

cc:

Chairman Zech Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Carr Commission Staff Offices EDO PDR - Advance DCS - 016 Phillips l

-