ML20214V815
| ML20214V815 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 06/09/1987 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8706120306 | |
| Download: ML20214V815 (2) | |
Text
!
49
'o UNITED STATES 8
NUCLEAR REGL'LATORY COMMISSION
~
n
{
Y WASHINGTON. D. C. 20655 g
June 9, 1987 Docket Nos. 50-498 and 50-499 MEMORANDUM FOR:
Eric Johnson, Director Division of Reactor Safety and Projects Region IV FROM:
Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects, NRR
SUBJECT:
CURRENT LIST OF ITEMS REQUIRING REGION IV INSPECTION EFFORT ON SOUTH TEXAS TO SUPPORT THE NRR SAFETY EVALUATION The following is a list of items on which Region IV inspection is requested to support the completion of the Safety Evaluation on the South Texas Project.
The applicant has characterized these items as having been or to be completed by fuel load.
Item Reference (1) Procedures on Emergency Communication System SER Confirmatory Item No. 19 and applicant letter ST-HL-AE-2121 dated April 28, 1987 (2) Fire Protection audit items SSER-3, Section 9.5.1 (3) Raychem Splices SSER-3, Section 8.1 (4) Implementation of RG 1.75 to Anaconda SSER-3, Section 8.3.3.3.3 sealtight flex conduit (5) Oxygen Monitoring of the GWPS Applicant letter ST-HL-AE-2228 dated June 4, 1987 g (6) Operability of the Prompt Notification System SSER-3, Section 13.3.2 Ho gga-(7) Post-Implementation appraisal of the ERF to SSER-3, Section 13.3.2 Og NUREG-0737 (Supp. 1)
So ex (8) EP appraisal open items SSER-3, Section 13.3.2 00 oo In general, these items require completed action before fuel load.
Some items, U
such as Nos. 6, 7 and 8 may be amenable to postponement until the full power license.
It is our understanding that the above items have been or will be g&
covered by the on going inspection effort.
CONTACT:
N. Prasad Kadambi, NRR/PD-IV 49-29407
, Please inform NRR when the inspections are completed, giving reference to the inspection reports.
Also, please add these items.to the updated version of the Inspection' Procedure 94300 letter.
IS/
Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects, NRR DISTRIBUTION
_ Doctestf'ile.
NRC PDR Locek POR w PD4 Reading j
DCrutchfield j
FSchroeder JCalvo PKadambi I
RPerch PNoonan PD4 Plant File 4
A PD /P PD4/D /JX PNoonan PKadambi:sr JCalvo FSchroeder, D utchfield 6/h/87 6/k/87 6/f/87 6/p87 6/ /87
.