Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235J260 + (10:15:41, 3 December 2024)
- TXX-6558, Interim Deficiency Rept CP-87-18 Re Errors Identified During Review of Vendor Qualification Documentation for CCW Heat Exchanges.Complete Description of Evaluation Will Be Submitted No Later than 870805 + (10:15:42, 3 December 2024)
- ML20235J259 + (10:15:42, 3 December 2024)
- ML20235J257 + (10:15:43, 3 December 2024)
- ML20235J254 + (10:15:44, 3 December 2024)
- ML20235J251 + (10:15:45, 3 December 2024)
- ML20235J252 + (10:15:45, 3 December 2024)
- ML20235J249 + (10:15:46, 3 December 2024)
- IR 05000382/1987013 + (10:15:47, 3 December 2024)
- SNRC-1552, Forwards Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Engineering Study Verified That Instrument Air Receivers & Accumulators Designed Per ANSI & ASME Codes + (10:15:57, 3 December 2024)
- ML20235J244 + (10:15:57, 3 December 2024)
- ML20235J243 + (10:15:58, 3 December 2024)
- ML20235J240 + (10:15:59, 3 December 2024)
- ML20235J241 + (10:15:59, 3 December 2024)
- ML20235J239 + (10:16:00, 3 December 2024)
- ML20235J236 + (10:16:01, 3 December 2024)
- ML20235J230 + (10:16:02, 3 December 2024)
- ML20235J221 + (10:16:03, 3 December 2024)
- ML20235J219 + (10:16:04, 3 December 2024)
- ML20235J216 + (10:16:05, 3 December 2024)
- RBG-26673, Forwards Rev 2 to Radwaste Processing Control Program, for Review & Approval,Per NUREG-0989 + (10:16:05, 3 December 2024)
- ML20235J212 + (10:16:06, 3 December 2024)
- ML20235J211 + (10:16:06, 3 December 2024)
- ML20235J210 + (10:16:07, 3 December 2024)
- ML20235J209 + (10:16:08, 3 December 2024)
- ML20235J206 + (10:16:08, 3 December 2024)
- AECM-89-0035, Monthly Operating Rept for Jan 1989 for Grand Gulf Nuclear Station Unit 1 + (10:16:09, 3 December 2024)
- ML20235J202 + (10:16:09, 3 December 2024)
- ML20235J201 + (10:16:10, 3 December 2024)
- ML20235J199 + (10:16:11, 3 December 2024)
- ML20235J198 + (10:16:12, 3 December 2024)
- ML20235J197 + (10:16:13, 3 December 2024)
- NLS8700330, Application for Amend to License DPR-46,consisting of Proposed Change 42,incorporating All Amends to OL Through Amend 108 Issued on 870420.Fee Paid + (10:16:14, 3 December 2024)
- ML20235J194 + (10:16:14, 3 December 2024)
- ML20235J192 + (10:16:15, 3 December 2024)
- IR 05000336/1987014 + (10:16:16, 3 December 2024)
- ML20235J191 + (10:16:16, 3 December 2024)
- ML20235J188 + (10:16:17, 3 December 2024)
- ML20235J186 + (10:16:18, 3 December 2024)
- ML20235J187 + (10:16:18, 3 December 2024)
- ML20235J185 + (10:16:19, 3 December 2024)
- ML20235J184 + (10:16:19, 3 December 2024)
- ML20235J182 + (10:16:20, 3 December 2024)
- 05000482/LER-1989-001, :on 890120,discovered That Diesel Generator Not Tested at Least Once Every 7 Days Per Tech Specs.Testing Frequency Reduced to Once Per 31 Days Following 890106 Test. Caused by Personnel Error.Personnel Instructed + (10:16:22, 3 December 2024)
- ML20235J180 + (10:16:22, 3 December 2024)
- ML20235J179 + (10:16:23, 3 December 2024)
- ML20235J178 + (10:16:23, 3 December 2024)
- ML20235J177 + (10:16:24, 3 December 2024)
- ML20235J176 + (10:16:25, 3 December 2024)
- 05000298/LER-1987-020, :on 870827,discovered That Annual Insps Performed in 1984 Not Accomplished within 15 Months.Caused by Misunderstanding of Term Annual. Definition of Testing Intervals & Procedural Changes Made + (10:16:26, 3 December 2024)
- ML20235J174 + (10:16:27, 3 December 2024)
- NLS8700318, Submits Status of Util Response to Insp Rept 50-298/86-03. Original Scope Security Lighting Upgrade Project Completed on 870630.Mercury Vapor Floodlights on turbine-generator Bldg Will Be Replaced W/High Pressure Sodium Lamps + (10:16:28, 3 December 2024)