j Modification No. 9 Supplemental Agreement to NRC-04-82-006-01 J
.1 l
SUPPLEMENTAL AGREEMENT BETWEEN THE UNIVERSITY OF OKLAHOMA' AND THE U.S. NUCLEAR REGULATORY COMMISSION 4
THIS SUPPLEMENTAL AGREEMENT, effective the 5th day of June,1986 by and.
between the UNITED STATES OF AMERICA (hereinafter referred to as the " Government"),
i as represented by the UNITED STATES NUCLEAR REGULATORY COMMISSION (hereinafter referred to as the " Commission"), and the UNIVERSITY OF OKLAHOMA (hereinafter 1
referred to as the " Contractor"),-
WITNESSETH THAT:
WHEREAS, the parties desire to modify Contract No. NRC-04-82-006-01 'as herein-af ter provided, and this supplemental agreement is authorized by law, including l
the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 1954, as amended.
NOW THEREFORE, said contract is hereby modified as follows:
1.
Appendix A, Article A-II " WAYS AND MEANS OF PERFORMANCE," is deleted in l
its entirety and the revised Appendix A, Article.A-II " WAYS AND MEANS OF 1
PERFORMANCE," attached to this supplemental agreement and made a part hereof, is substituted in licu thereof.
1 2.
In Article II - Period of Performance, the date Tuly 31,1987 " is sub-stituted for the date " June 30, 1987."
i 3.
All other terms and conditions of this contract including the total 1
amount of this contract ( $169,616.00) remain unchanged.
~
j 8707150455 870630
%_okOhOO6 PDR
l l
Modification No. 9 Supplemental Agreement to NRC-04-82-006-01 Page 2 IN WITNESS WH :RE0F, the parties have executed this document.
UNITED STATES OF AMERICA By:
. dd ob I
Elois J. Wiggins [][3 Contracting OfficPr Nuclear Regulatory Commission UNIVERSITY OF OKLAHOMA By:
(A Brad Quinn, Director l
Title:
Offien nf r,ran+e R Contracts Administration l
1 I,
Barbara Tuttle certify that I am the (attester)
Secretar_y of the Contractor named (title) 1 l
under this document that Brad Quinn
' (signatory) who sioned this document on behalf of said Contractor was then Director of the Office of Grants & Contracts Mmn of said Contractor; that this document was signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal powers.
l IN WITNESS WHERE0F, I have hereunto affixed my hand and the seal of said Con trac tor.
I (SEAL)
M l
c Secretary, The Oniversity of Oklahoma
4 Attachment to Supplement Agreement No. NRC-04-82-006-01
)
Modification No. 9 l
ARTICLE A-II WAYS AND MEANS OF PERFORMANCE (a)
Items for which support will be provided as indicated in A-III, below j
(1) Salaries and Wages
$59,817.00 (2) Equipment to be purchased or fabricated by the Contractor
$11,890.00 ITEMS ESTIMATED TO COST MORE THAN $1,000.00 i
Gell Cell Batteries i
Five each Qual-Tron VHF telemetry receivers, model AFS-1 (216-220MHz) with field selectable frequency One Hewlett Packard Model 7475A plotter.
l Two each Qual-Tron Telemetry Transmitters, Model TFS-1(216-220MHz) with field selectable frequencies.
)
ITEMS ESTIMATED TO COST LESS THAN S1,000.00 Batteries, Marine Cables i
l Model 1420, 14MHZ Band K Dvnascan Field Oscilloscope.
j 1
One Healthkit GC-1000 most accurate clock kit j
l i
One Eventide Colcr Graphics Interface for H.P. 9325 computer.
I l
One Radio Shack CM-8 color monitcr.
)
(3) Travel
)
(i)
Domestic
$19,312.00 j
(ii)
Foreico '
(iii) All contractor travel must have the prior approval of the NRC l
Project Officer.
l (4) Other direct costs including fringe benefits j
(5)
Indirect costs based on a predeterm' red rate of 26% applicable to l
Modified Total Direct Costs for the ]eriod July 1,1986 through j
l June 30, 1987. This rate of 26% sha'l be provisional thereafter.
i l
l l
l 1
l Attachment to Supplement Agreement No. NRC-04-82-006-01 Modification No. 9 Page 2 (b)
Items, if any significant to' the performance o' this contract', but f
excluded from computation of Support Cost and from consideration in j
proportioning costs:
NRC CONTRIBUTION: NRC shall: continue to pay the
-l cost of' telemetry over existing telephone' lines separately from this j
f contract, only for those telephone lines in existence under the previous NRC Contract f:u. HRC-04-76-314.
(c) Time or_ effort of Principal Investigator (s) including direct costs and j
fringe benefits contributed by Contractor but excluded from computation.
1 of Support Cost and from consideration in proportioning l costs:
1 Dr..Kenneth Luza - 10% of his' time throughout the contract period.-
?
.i i
I l
l l
t