Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198L699 + (09:21:33, 24 May 2025)
- IR 05000456/1997001 + (09:21:34, 24 May 2025)
- ML20198L524 + (09:23:05, 24 May 2025)
- IR 05000277/1998008 + (09:23:27, 24 May 2025)
- ML20198L436 + (09:23:29, 24 May 2025)
- ML20198L398 + (09:23:50, 24 May 2025)
- ML20198L332 + (09:24:19, 24 May 2025)
- ML20198L323 + (09:24:22, 24 May 2025)
- ML20198L246 + (09:24:49, 24 May 2025)
- 05000354/LER-1997-024, :on 971001,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Occurred.Caused by Corrosion Bonding of Pilot Disc to Pilot Seat Due to Radiolytic Oxygen.Srvs Inspected + (09:24:55, 24 May 2025)
- ML20198L190 + (09:25:02, 24 May 2025)
- CLI-98-25, Erratum.* Advises That Citation to CLI-98-12 on Page 7 of CLI-98-25 (Issued on 981223),immediately Following First Indented Quotation,Should Read 48 NRC 18, Not 48 NRC 1 + (09:25:15, 24 May 2025)
- ML20198L106 + (09:25:28, 24 May 2025)
- DD-97-20, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 971007 + (09:25:29, 24 May 2025)
- ML20198L091 + (09:25:36, 24 May 2025)
- ML20198L047 + (09:25:45, 24 May 2025)
- ML20198K886 + (09:26:23, 24 May 2025)
- IR 05000334/1985099 + (09:26:58, 24 May 2025)
- ML20198K659 + (09:27:24, 24 May 2025)
- ML20198K619 + (09:27:33, 24 May 2025)
- 05000336/LER-1996-024-02, Forwards LER 96-024-02,documenting Event Which Occurred on 960507 Re Inadequate ESAS & RPS Response Time Surveillance Testing.Commitments Made within Ltr Are Included in Attachment 1 + (09:27:38, 24 May 2025)
- IR 05000456/1996016 + (09:28:46, 24 May 2025)
- IR 05000440/1985084 + (09:29:12, 24 May 2025)
- ML20198K219 + (09:29:28, 24 May 2025)
- ML20198K199 + (09:29:37, 24 May 2025)
- ML20198K171 + (09:29:45, 24 May 2025)
- 05000266/LER-1998-030, :on 981124,determined That Safety Related Battery Charges Should Be Reclassified as Hot Shutdown Equipment.Caused by Incorrect Assumption.Mod Will Be Installed to Provide Manual Switches + (09:29:58, 24 May 2025)
- 05000461/LER-1998-026, :on 860929,inoperable EP Assembly Circuit Cards Which Monitor Power to RPS Scarm & MSIV Sv Were Noted.Caused by Improper Design of EP Assembly Circuit Cards by Supplier. Procured & Installed Correctly Designed Circuit Cards + (09:30:08, 24 May 2025)
- IR 05000413/1986005 + (09:30:17, 24 May 2025)
- ML20198K061 + (09:30:29, 24 May 2025)
- DD-86-04, Advises That Time for Commission to Review Directors Decision DD-86-04 Expired.Commission Declined Review. Decision Became Final Agency Action on 860530.Served on 860602 + (09:30:46, 24 May 2025)
- 05000293/LER-1998-004-01, Forwards LER 98-004-01 Re EDG Room Air Temp Being Below Design Basis.Resolution of Issues Contained in LER 98-018-00 Has Been Separated & Actions for Low Temp Resolution Are Discussed in Encl.No New Commitments Made + (09:30:49, 24 May 2025)
- ML20198J957 + (09:30:58, 24 May 2025)
- ML20198J872 + (09:31:23, 24 May 2025)
- 05000259/LER-1997-003-01, Forwards LER 97-003-01,providing Assessment of Safety Consequences Which Was Inadvertently Omitted from Initial Rept + (09:31:27, 24 May 2025)
- 05000336/LER-1997-029-01, Forwards LER 97-029-01,documenting Condition That Was Discovered at Mnps,Unit 2,on 970826.LER Suppl Provides Update on Analysis of Condition,Including Identification of Addl Deficiency Discovered During Investigation + (09:31:30, 24 May 2025)
- 05000354/LER-1997-032, :on 971205,inoperability of HPCI & RCIC Noted. Caused by Unsuitability of Replacement Governor Valve Stem, over-compression of Valve Stem Spring & Misalignment of Remote servo-governor Lever.Procedures Revised + (09:31:41, 24 May 2025)
- 05000445/LER-1997-006-01, Forwards LER 97-006-01 Re Discovery of Control Room HVAC Emergency Pressurization Unit to Be Outside TS Limits.Ler Issued to Document Addl Info Noted During Review of Event + (09:32:41, 24 May 2025)
- ML20198J578 + (09:32:47, 24 May 2025)
- 05000302/LER-1997-025-03, Forwards LER 97-025-03,to Update Info on UHS Effects on SW Temp Reported in Previous LER Supplement.Ler 98-011-00,was Issued to Address Control Complex Chiller Issue & Discussion of Concern Has Been Removed from LER + (09:32:53, 24 May 2025)
- ML20198J429 + (09:33:25, 24 May 2025)
- IR 05000275/1986014 + (09:36:45, 24 May 2025)
- IR 05000369/1985044 + (09:36:50, 24 May 2025)
- TXX-9825, Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps + (09:36:53, 24 May 2025)
- IR 05000482/1998012 + (09:37:06, 24 May 2025)
- IR 05000930/2010004 + (09:37:10, 24 May 2025)
- A05390, Forwards Addl Info Re Use of RCS Loop Isolation Valve, Degraded Core Cooling Guidelines & Rev to Emergency Operating Procedures,Per 851206 Request Re Procedures Generation Package & Sser 4 (NUREG-1031) + (09:37:17, 24 May 2025)
- ML20198J041 + (09:37:20, 24 May 2025)
- ML20198J030 + (09:37:23, 24 May 2025)
- IR 05000382/1997010 + (09:37:32, 24 May 2025)
- IR 05000482/1985041 + (09:37:36, 24 May 2025)