Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/97-07 Issued on 970904.Reply Found Responsive to Concerns Raised in Nov. Corrective Actions Will Be Examined During Future Insp
ML20198L436
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/20/1997
From: Collins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
50-298-97-07, 50-298-97-7, NUDOCS 9710270041
Download: ML20198L436 (5)


See also: IR 05000298/1997007

Text

- _ .

. - _ _

._._m

_ . _ _ _ _

- _ . . .. __.

_

.

,

.

te ps4

UNITED 8TATf s

m

.\\

NUCLEAR REGULATORY COMMISSION

,..j

$

MaoioN iv

' ,*****,

$11 RYAN PLAZA DRIVE, SulTE 400

g

4

ARLINoToN, TEXAS 740114064

OCT 201997

G. R. Horn, Senior Vice President

of Energy Supply

Nebraska Public Power District

141415th Street

Columbus, Nebraska 68601

SUBJECT: NRC INSPECTION REPORT 50 298/97 07

Dear Mr. Horn:

. - -

- . - _ .

- - - - - . -

-.-. - - - -- - - - --.

Thank you for your letter of October 9,1997,in responso 's our letter and Notice

of Violation dated September 4,1997, involving inadequate procedures for routine testing

of the torus to-drywell vacuum breakers and valve RHR-MOV M0348. We have reviewed

your reply and find it responsive to the concerns raised in our Notice of Violation. We will

review the implementation of your corrective actions during a future inspection to

determine that full compliance has been achieved and will be maintained.

Sincerely,

O

Elmo E. Collins, Chief

Project Oranch C

Division of Reactor Projects

Docket No.: 50 298

License No.: DPR 46

cc:

John R. McPhail, General Counsel

Nebraska Public Power District

P.O. Dox 499

Columbus, Nebraska 68602 0499

P. D. Grahami Vice President of

Nuclear Energy

- Nebraska Public Power District

- P.O. Box 98

{g

g g

fj(llfl

Brownville, Nebraska 68321

9710270041 971020

!

PDR

ADOCK 05000298

6

PDN

. , .

.

..-eg.

.

- .

. , . - . -

. - .

-

-. - - .- -.- .,-

_

-

-

,n..,.

-

, . - - -

- . , -

e-,

.,,. , ,

--y

-,

- - - -,

--

g

-

- - -.

..

...

. - -

.

._- -- .

. , - - . - - . . - . -

.- . . - .

. . - - - .

+

0=

a

o

<

Nebraska Public Power DisV'ct

2-

,

B. L. Houston, Nuclear Licensing l

and Safety Manager

Nebraska Public Power District 1

- P.O. Box 98 -

Brownville, Nebraskaf 68321

Dr. William D. Leech '

MidAmerican Energy

,

' 907 Walnut Street

,

t-

u.R.O., Box 65L

__

_ _ _ _

_

___

. _ _ _ _ _ _ _

_

.

,

-

Des Moines, Iowa B0303 0657

Mr. Ron Stoddard

Lincoln Electric System

11th and O Streets

Lincoln, Nebraska 68508

Randolph Wood, Director

Nebraska Department of Environmental-

~ Quality-

P.O. Box 98922

Lincoln, Nebraska 68509 8922

. Chairman

Nemaha County Board of Commissioners

Nemaha County Courthouse

1824 N Street

. Auburn, Nebraska 68305.

Cheryl Rogers, LLRW Program Manager

Environmental Protection Section

Nebraska Department of Health

301 Cerrer.nlal Mall, South

'

P.O. Box 95007

. Lincoln, Nebraske 68509 5007

David P. Schor, MD, MPH, FAAP

Low Level Radioactive Weste Program

HHS Regulation and Licensure

,

P.O. Box 95007

Lincoln,' Nebraska 68509 5007_

r.

> ~ - + ~

_-nnn_-,n____

_ _ _ . _.. . _ ,

,

,

,

L,

_ _ ___

, - _. . - _ .

. . -

-

. . . -

- ...

.

.

. . .

- . ~ . -

,

.

. .

- . . , , . .

. - _ . ~. -

..- -

- ,

.

- . . .

.

- - , . . - - . . . - - . _ ~ - - . .

.-

. . .

J

a

,

-i

I

-

_

- 1 Nebraska Public Power District '

- -3 -

.

-!

i

R. Af Kucera, Department Director--

. of intergovernmental Cooperation -

Department of Natural Resources

- P.O. Box 176

>

Jefferson City, Missouri 65102

,

Kansas Radiation Control Program Director --

_ _ _ = _

--

.==

.

>

b

&

s

o

M

N~'.:YQ

""

TY.~ ~ 7?~?Y # * ? *,Y~

"T ~

'~"*'?"T*..~.~?

Y ",'; ' ' '

.~"~~0

" ' * "

Y.~'~

l*

'*

' ^ ^ ^

['

'

.~ M ' J

.

.

'

'

'

-,

.-

Nebraska Public Power District

-4-

OCT 2 01997

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator

Resident inspector

DRP Director

' DRS-PSB

Branch Chief (DRP/C)

MIS System

Branch Chief (DRP/TSS)

RIV File

.

Project Engineer (DRP/C)

DOCUMENT. NAME: R:\\_CNS\\CN707AK,MHM

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy

RIV:PE:DRP/C -

C:DPf/,C,

l

C

CSMarschall;df (Shi

EECoVins

10/gg /97

10Tl497

OFFIC:AL RECORD COPY

..

.7

. _ - . . _ , .

._ _

. ~I

.j

'

.,..4._

i

l,

-

=

l

t

Nebraska Public Power District

-4-

OCT 2 01997

+

55[$$

bec distrib by RIV:

Regional Administrator

Resident inspector

DRP Dhector

DRS PSB

Branch Chief (DRP/C)-

MIS System

Branch Chief (DRPfrSS)

RIV File

Project Engineer (DRP/C)

aw.w.-

_

= . -

-

f

I

l

i

040030

DOCUMENT NAME: R:\\_CNS\\CN707AK.MHM

"

To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" a Copy with enclosures *N" = No copy -

RIV:PE:DRP!C

C:Dy/E

CSMarschall;df ($

EEC'oVins

10/gq /97

10fZE197

OFFIC.AL RECORD COPY

.-,.-.:.--

..

..

,..

..

.

- . - . _ - _

.:

.---.--.-;.

, a#

.

l

,

COOPCR NUCLE AR ST ATON

P.O. 90t es. SnowNVILLE. NEBRASK4 SET 1

Nebraska Public Power District

"Tf,J"' :=""

- mm---ammm-n,

--~~~~~nn-

_m

NLS970178

October 9,1997

-

i y l W ,~ ..-

ll H tML'-

l C

^

jjpI

-:< L l:q . -jf

iij

9

U.S. Nuclear Regulatory Commissioa

iSpy

Attention: Document Control Desk

k~%

>~

Washington, D.C. 20555-0001

. %j~E0m{';'; 4

--

Gentlemen:

Subject:

Reply to a Notice of Violation

NRC Inspection Report No. 50-298/97-07

Cooper Nuclear Station, NRC Docket 50-298, DPR-46

Reference:

1.

Letter to G. R. Ilorn (NPPD) from T. P. Gwynn (USNRC) dated

September 4,1997, "NRC Inspection Report 50-298/97-07, Notice of

Violation"

By letter dated September 4,1997 (Reference 1), the NRC cited Nebraska Public Power District

(District) as being in violation of NRC reo,uirements. This letter, including Attachment 1,

constitutes the District's reply to the referenced Notice of Violation in accordance with

10 CFR 2.201. The District admits to the violation and has completed all of the corrective actions

necessary to return Cooper Nuclear Station (CNS) to full compliance with respect to the cited

violation.

This NOV response was due on October 6,1997, however, as explained in the October 7,1997

telephone call between CNS licensing and NRC personnel, extra time was required to provide a

full and accurate description of the cause of the events leading to the NOV and the appropriate

corrective actions required to prevent re-occurrence.

Should you have any questions concerning this matter, please contact me.

..

Sincerely,

bel<w~

P. D. Graham

Vice President of Nuclear Energy

/dm

Attachment

C1 g.- 6 D9 O

MrGC%

.5

IBMTS7EEsid$p.5I!IdE 3221sG7 M 4!Tn'B E M Ssn FE T Z E G M

-

. . , -

-

- . .

. . - .. - - -

. - -

. . .

..-

.

..

-;

,

.

,

.

,

.

'

NL.S970178

-' October 8,1997

Pt.ge 2

cc:

gional Administrator

- '

USNRC - Region IV

i

Senior Project Manager

USNRC- NRR Project Directorate IV-1

.

[

Senior Resident inspector

'

USNRC

NPO Distribution

i

4

'

,w*

,,

...,.r

,,_, ,

. , , .

y

-

r

< * + =

- '

' " "

-

- -

-

. . -

- .

_ -

-.-

- . . .

.

..

. --

e

a.

-

3

i

..

Attachment 1

t

to NLS970178 '

Page 1 of 2

_

.

REPLY TO SEPTEMBER 4,1997, NOTICE OF VIOLATION'

COOPER NUCLEAR STATION

NRC DOCKET NO. 50-298, LICENSE DPR-46 -

'

During NRC inspection activities conducted May 18 through June 28,1997, a violation of NRC ,

requirements was identified, The particular violation and the District's reply are set forth below:

Violation

TechnicalSpecipcation 6.3.3.A requires, inpart, that routine testprocedures be provided to

' satisfy operating license requirements, such as routine testing ofequipment required by the

TechnicalSpecifications.

Contrary to the abow:

1. On July 31, the trupector idennfied that Procedun 6.PC.308, "DrywellPressure

. Suppression Chamber Vacuum Breaker Calibration andFunctional Test, " a routine test

procedure, did not satisfy operating license requirements in that plant conditions caused a

differentialpressure across the torus-to drywell mcuum breakers during hftforce testing

which was not addressedin the acceptance criteria or evaluation offorces on the mlve.

' 2. On May 4,1997, Valw RilR-MOV-MO34B was tested with a routine test procedure which

was not qppropriate in that a modification of the valve was not reflected in the test stroke

time limit.

,

Thisis a Sewrity Lew!IVviolation. (Supplement 1) (298/97007-05) .

Adminion or Denial to Violation

.,

.

. . , -

The District admits the violation.

Reason for Violation

The apparent cause for this violation is a weakness in the post-maintenance and post-modification

testing processes ~which allowed specification of testing without verification that such testing is

' appropriate for the plant conditionsc

..

,.-

,.

. .

..

. . . , .

-

- . - - - -.

.

.-

. _ -

_.

-.

- - _ _

_

'

s .

..

.

.

.

Attachment 1

'

to NLS970178

Page 2 of 2

Corrective Steos Taken and the Ramdts Achieved

The following immediate actions have been taken:

,

1) Procedure 6.PC.308 was revised on August 1,1997, to require that the drywell and torus

ventilation are secured and drywell to torus vacuum breakers are opened to equalize the

pressure between the drywell and the torus prior to the performance of the test.

2) The torus-to-drywell surveillance test was performed following the above revision of

proccoure 6.PC.308 with satisfactory results.

3) Procedure 6.2RHR.201 was revised to include, in the IST Retest and Operability Limits, the

effects of the modification on the RHR-MOV-MO34B valve.

Corrective Stens That Will Be Taken to Avoid Further Violations

An assessment of the post maintenance / post-modification testing processes will be perfonned to

determine the effectiveness of these processes to specify the appropriate initial test conditions.

Date When Full Comoliance Will Be Achieved

The District is in full compliance with respect to the cited violation.

.

-

. ..

.

.

,.

-

- .

__

.

4

-

.

l

ATTACHMENT 3

LIST OF NRC COMMITMENTS

l

.

Correspondence No: NLS9701?B

The following table identifies those actions committed to by the District in this

document. Any other actions discussed in the submittal represent intended or

planned actions by the District. They are described to the NRC for the NRC's

information and are not regulatory cormitments.

Please notify the Licensing Manager

at Cooper Nuclear Station of any questions regarding this document or any associated

regulatory comrdcments.

COMMITTED DATE

COMMITMENT

OR OUTAGE

Revise procedure 6.PC.308 to require that the drywell and

torus ventilation are secured and drywell to torus vacuum

complete

breakers are opened to equalize the pressure between the

drywell and the torus prior to the performance of the

test

Revise procedure 6.2RHR.201 to include in the IST Retest

Complete

and Operability Limits the ef fects of the modification on

the RHR-MOV-MO34B valve

An assessment of the post-maintenance / post-modification

testing processes will be performed to determine the

January 20,1998

effectiveness of these processes to specify the

_ appropriate initial test conditions

.-c,

l

PROCEDURE NUMBER 0.42

l

REVISION NUMBER 5

l

PAGE 8 OF 9

l