Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344B181 + (16:35:37, 24 December 2024)
- ML19344B180 + (16:35:38, 24 December 2024)
- ML19344B179 + (16:35:39, 24 December 2024)
- ML19344B178 + (16:35:39, 24 December 2024)
- ML19344B176 + (16:35:40, 24 December 2024)
- ML19344B175 + (16:35:41, 24 December 2024)
- ML19344B171 + (16:35:42, 24 December 2024)
- ML19344B173 + (16:35:42, 24 December 2024)
- ML19344B170 + (16:35:43, 24 December 2024)
- ML19344B168 + (16:35:44, 24 December 2024)
- ML19344B167 + (16:35:45, 24 December 2024)
- ML19344B165 + (16:35:46, 24 December 2024)
- ML19344B164 + (16:35:47, 24 December 2024)
- ML19344B163 + (16:35:48, 24 December 2024)
- ML19344B161 + (16:35:48, 24 December 2024)
- ML19344B160 + (16:35:49, 24 December 2024)
- ML19344B159 + (16:35:50, 24 December 2024)
- AECM-80-192, Fourth Interim Deficiency Rept Re Defective Inverters Mfg by Topaz Electronics.Mod to Inverters Is Being Evaluated. Corrective Actions Are Contingent on Evaluation.Final Rept Will Be Provided by 801201 + (16:35:51, 24 December 2024)
- 05000368/LER-1980-052-03, /03L-0:on 800719,during Mode 1 Operation, Containment Bldg Pressure Indicator 2PI-5603-3 Failed High. Caused by Erratic Current Repeater 2PY-5603-3B.Repeater Replaced & Pressure Indication Returned to Normal + (16:35:53, 24 December 2024)
- ML19344B155 + (16:35:54, 24 December 2024)
- 05000368/LER-1980-051-03, /03L-0:on 800717,during Mode 1 Operation,Core a Protection Calculator Failure Alarm Was Received.Cause Not Determined.Calculator Reinitiated & All Failure Indications Returned to Normal.Bypasses Removed + (16:35:56, 24 December 2024)
- ML19344B153 + (16:35:56, 24 December 2024)
- ML19344B151 + (16:35:57, 24 December 2024)
- ML19344B147 + (16:36:00, 24 December 2024)
- ML19344B146 + (16:36:01, 24 December 2024)
- 05000327/LER-1980-124-03, /03L-0:on 800719,during Low Power Testing in Mode 2,hydrogen Analyzer H2AN-43-200 Was Declared Inoperable Due to Low Sample Flow.Caused by Tripping of Sample Pump Motor Thermal Overload Due to Ambient Temp in Annulus + (16:36:02, 24 December 2024)
- ML19344B144 + (16:36:03, 24 December 2024)
- 05000327/LER-1980-124, Forwards LER 80-124/03L-0 + (16:36:05, 24 December 2024)
- A01151, Advises of Minor Adjustments to Evaluation Program Re Resolution of Cycle 3 Startup Commitments.Adjustments Are to Optimize Timetable for Critical Path Refueling Activities + (16:36:06, 24 December 2024)
- ML19344B137 + (16:36:12, 24 December 2024)
- ML19344B132 + (16:36:12, 24 December 2024)
- ML19344B129 + (16:36:13, 24 December 2024)
- ML19344B126 + (16:36:15, 24 December 2024)
- 05000327/LER-1980-130-03, /03L-0:on 800709,during Mode 3 & Recovery from Scheduled Reactor Trip from Startup Testing,Differential Pressure Between Primary Containment & Annulus Exceeded Tech Spec Limit.Cause Not Apparent.Operators Instructed + (16:36:17, 24 December 2024)
- 05000327/LER-1980-130, Forwards LER 80-130/03L-0 + (16:36:18, 24 December 2024)
- ML19344B116 + (16:36:20, 24 December 2024)
- 05000321/LER-1980-091-03, /03L-0:on 800724,while Performing Surveillance Procedure HNP-1-3974,control Room Air Intake Chlorine Monitor Calibr & Operability,Fan Motor on Monitor 1Z41-N022B Was Inoperative.Caused by Open Winding on Motor + (16:36:21, 24 December 2024)
- ML19344B111 + (16:36:22, 24 December 2024)
- 05000321/LER-1980-091, Forwards LER 80-091/03L-0 + (16:36:23, 24 December 2024)
- 05000368/LER-1980-055-03, /03L-0:on 800721,PPS Channel D Received Spurious Dnbr/Lpd Trips During Mode 1 Operation.Caused by Fluctuating CPC Dnbr/Lpd Temp Input Calculations.Temp Transmitter 2TT- 4711-4 Electrical Leads Checked & Tightened + (16:36:27, 24 December 2024)
- 05000368/LER-1980-054-03, /03L-0:on 800721,control Room Emergency Chiller 2VE-1B Found Inoperable During Mode 1 Operation.Caused by Unit Tripping on High Pressure Due to Improperly Operating Control Valve 2CV-1506-2.Control Valve Repaired + (16:36:29, 24 December 2024)
- 05000368/LER-1980-053-03, /03L-0:on 800721,CEAC 1 Failed During Mode 1 Operation.Cause Not Determined.Ceac Sys Software Reloaded, Periodic Tests Performed & Failure Indications Returned to Normal.Ceac Returned to Operable Status on All Channels + (16:36:31, 24 December 2024)
- ML19344B084 + (16:36:32, 24 December 2024)
- ML19344B079 + (16:36:33, 24 December 2024)
- 05000327/LER-1980-079-03, /03L-0:on 800716,during Performance of Special Test 2,ice Bed Temp Exceeded Tech Spec Limit.Caused by Load Shedding Requirements of Special Maint Instruction 13.Glycol Cooling Sys Placed in Svc + (16:36:34, 24 December 2024)
- 05000320/LER-1980-032-03, /03L-0:on 800719,during re-dewatering of EPICOR-I Liner,Leak of Radioactive Liquid Discovered.Caused by Worn Mating Surfaces of Quick Release Coupling.Requirements for Insp of Couplings Before & After Engagement Adopted + (16:36:36, 24 December 2024)
- 05000327/LER-1980-079, Forwards LER 80-079/03L-0 + (16:36:38, 24 December 2024)
- ML19344B069 + (16:36:39, 24 December 2024)
- ML19344B067 + (16:36:40, 24 December 2024)
- ML19344B066 + (16:36:41, 24 December 2024)
- ML19344B065 + (16:36:41, 24 December 2024)