ML19344B151

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1980
ML19344B151
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/14/1980
From: Merson S
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19344B152 List:
References
NUDOCS 8008250648
Download: ML19344B151 (1)


Text

l B ALTIMOFM GAS AND I

ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE. MARYLAND 21203

. August I I+, 1480 Director Of fice of Management and Program Control US Nuclear Regulatory Commission 7735 Old Georgetown Road Bethesda, MD 20015 Centlemen:

Enclosed herewith is the July, 1980, Operation Status Report for Calvert Cliffs No. I Unit, (Docket 30-317) and Calvert Clif fs No. 2 Unit, (Docket 50-318).

Sincerely, h.00 /))./ W S. D. Merson, Performance Data Coordinator Production Economy and Results Unic Fossil Power Department SDM/ big Enclosure ec: Directorate of Regulatory Operations Nuclear Safety Analysis Center Region 1 3412 Hillview Avenue US Nuclear Regulatory Comission P. O. Box 10412 Palo Alto, CA 94303 S. M. Long Power Plant Siting - MD L. B. Russell A. M. Maszaros C. K. Wetzel, Jr.

A. E. Lundvall, Jr.

!')!

W. L. LeConte T. Cintulo R. F. Ash R. Architzel 8 008259 ffg

-