ML19344B153
| ML19344B153 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/15/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8008250651 | |
| Download: ML19344B153 (2) | |
Text
,
D Alab ma Power Company 600 North 18th street Post Offica Box 2641 Birmingnam, Alacama 35291 Telephone 205 250-1000 F. L CLAYToN, JR.
Senior Vice President Alabama Power tre southem erectrc system August 15, 1980 Mr. Harold R. Denton United States Nuclear Regulatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, Maryland 20014
Dear Mr. Denton:
During the meeting held with you at the Farley Plant on Tuesday, August 12th, I quoted a policy statement by Mr. Joseph M. Farley on safe operation.
In accordance with your suggestion, this statement has been included in Alabama Power Company's Policy Statement Manual which is distributed throughout the Company. Attached is a copy of the referenced page from that manual.
Sincerely, 3 J (Q' G^
FLCjr/gw Attachment cc: Mr. James P. O'Reilly, w/attachmert Mr. Joseph M. Farley Mr. R. P. Mcdonald
- 0 esa s y y 8
D COMPANY POLICY STATEMENT No.
mabamapower A 44 BJECT:
SAFETY POLICY FOR JOSEPH M. FARLEY tlUCLEAR PLAtlT PAGE DATE REVISED DATE EFFECTIVE 10F 1 ilEW AUGUST 11, 1980 POLICY:
It is a policy of Alabama Power Company to make the safe operation of the Joseph M. Farley fluclear Plant absolute top priority.
l IMPLEMENTATION:
It is the responsibility of the fluclear Generation Department to insure that the Joseph M. Farley fluclear Plant cperate in a completely safe manner. Alabama Power Company will not operate this plant at anytime t.nless we are completely confident that it is safe to do so. This colicy is more conservative than any limits imposed by the terms of Alabama Power Company's operating license.
i I
NW G
President l
___