Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210C376 + (20:17:48, 23 May 2025)
- IR 05000293/1987003 + (20:17:52, 23 May 2025)
- ML20210C351 + (20:17:57, 23 May 2025)
- ML20210C329 + (20:18:02, 23 May 2025)
- ML20210C293 + (20:18:11, 23 May 2025)
- ML20210C259 + (20:18:22, 23 May 2025)
- ML20210B961 + (20:19:42, 23 May 2025)
- IR 05000312/1985029 + (20:19:50, 23 May 2025)
- IR 05000250/1985034 + (20:19:52, 23 May 2025)
- L-99-113, Forwards Final,Typed TS Pages for LARs 262 & 135,previously Submitted with Editorial Changes Identified by + (20:20:05, 23 May 2025)
- TAC:MA3756 + (20:20:29, 23 May 2025)
- ML20210B689 + (20:20:49, 23 May 2025)
- ML20210B658 + (20:20:54, 23 May 2025)
- ML20210B649 + (20:20:57, 23 May 2025)
- ML20210B469 + (20:22:27, 23 May 2025)
- ML20210B206 + (20:23:33, 23 May 2025)
- L-86-266, Special Rept:On 860405,while Performing Refueling Outage, Evidence of Tip Damage on Newer anti-reverse Rotation Device Pins Revealed.Caused by Misalignment of Access Plugs W/Ramp Surface.Pins Replaced W/Pins of Improved Design + (20:23:42, 23 May 2025)
- IR 05000245/1986026 + (20:23:58, 23 May 2025)
- ML20210B124 + (20:23:59, 23 May 2025)
- ML20210B113 + (20:24:04, 23 May 2025)
- ML20210B093 + (20:24:11, 23 May 2025)
- ML20210B079 + (20:24:16, 23 May 2025)
- ML20210B067 + (20:24:23, 23 May 2025)
- ML20210B060 + (20:24:26, 23 May 2025)
- ML20210B058 + (20:24:30, 23 May 2025)
- ML20210B054 + (20:24:32, 23 May 2025)
- ML20210B048 + (20:24:34, 23 May 2025)
- ML20210B041 + (20:24:38, 23 May 2025)
- ML20210B026 + (20:24:42, 23 May 2025)
- ML20210B021 + (20:24:44, 23 May 2025)
- ML20210B014 + (20:24:47, 23 May 2025)
- 05000400/LER-1987-002, :on 870102,discovered That Testing of Reactor Protection Sys Logic,Reactor Trip Breaker & Bypass Breaker Not Staggered Properly Per Tech Spec Table 4.3-1.Caused by Personnel Error.Tests Staggered + (20:24:49, 23 May 2025)
- 05000483/LER-1987-002, :on 870403,plant Shut Down Due to Inoperability of Diesel Generator a on 870401 & Fuel Oil Leak on Injector Pump Housing on 870402.Caused by Faulty Control Card plug-in Connections & Crack in Valve + (20:24:50, 23 May 2025)
- ML20210B008 + (20:24:52, 23 May 2025)
- ML20210B002 + (20:24:55, 23 May 2025)
- IR 05000250/1986039 + (20:24:57, 23 May 2025)
- ML20210A988 + (20:25:04, 23 May 2025)
- ML20210A977 + (20:25:13, 23 May 2025)
- 05000374/LER-1987-005-07, :on 870402,diesel Generator 2B Shutdown W/ Control Switch in Auto.Caused by Personnel Errors.Testing Suspended & All Jumpers & Lifted Leads Required by Surveillance Immediately Removed + (20:25:18, 23 May 2025)
- ML20210A970 + (20:25:20, 23 May 2025)
- ML20210A965 + (20:25:22, 23 May 2025)
- IR 05000293/1986044 + (20:25:24, 23 May 2025)
- ML20210A958 + (20:25:27, 23 May 2025)
- 05000397/LER-1986-027, :on 860903,evaluation Concluded That Engineering Criteria Supplied by Burns & Roe,Inc,In Electrical Spec 2808-218 Nonconservative.Procedures Utilizing Faulty Data Will Be Modified + (20:25:29, 23 May 2025)
- ML20210A933 + (20:25:34, 23 May 2025)
- 05000370/LER-1986-015-02, :on 860809,control Area Ventilation & Chilled Water of Trains a & B Tripped.Caused by Blown Fuse & Nonoperating Chiller Starter.Fuse Replaced & Wiring Changes Planned to Correct Problem + (20:25:37, 23 May 2025)
- ML20210A915 + (20:25:41, 23 May 2025)
- ML20210A898 + (20:25:48, 23 May 2025)
- ML20210A891 + (20:25:55, 23 May 2025)
- ML20210A882 + (20:26:00, 23 May 2025)
- ML20210A872 + (20:26:03, 23 May 2025)