Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20030C058 + (20:43:15, 20 December 2024)
- 05000338/LER-1981-036-03, /03L-0:on 810722,chemistry Personnel Failed to Verify C Safety Injection Accumulator within Specs After Solution Vol Increase of 5%.Caused by Miscommunications Between Personnel.Tank Sampled & Found to Be within Specs + (20:43:17, 20 December 2024)
- ML20030C054 + (20:43:19, 20 December 2024)
- ML20030C052 + (20:43:20, 20 December 2024)
- IR 05000333/1981016 + (20:43:23, 20 December 2024)
- 05000338/LER-1981-036, Forwards LER 81-036/03L-0 + (20:43:25, 20 December 2024)
- ML20030C048 + (20:43:27, 20 December 2024)
- ML20030C046 + (20:43:28, 20 December 2024)
- ML20030C045 + (20:43:29, 20 December 2024)
- ML20030C042 + (20:43:31, 20 December 2024)
- RBG-10740, Responds to NRC 800811 & 1003 Ltrs Re Violations Noted in IE Insp Rept 50-458/80-07.Corrective Actions:Clarifies Previous Responses Re Correlation Testing for Category I Concrete Placements.Summary of Analysis Encl + (20:43:33, 20 December 2024)
- ML20030C040 + (20:43:35, 20 December 2024)
- 05000312/LER-1981-035-03, /03L-1:on 810625 Diesel Generator a Synchronization Test Revealed Unstable Operation of Diesel Generator G886A.Caused by Slow Oil Leak in Governor.Oil Added.Generator to Be Replaced + (20:43:37, 20 December 2024)
- ML20030C036 + (20:43:40, 20 December 2024)
- ML20030C035 + (20:43:40, 20 December 2024)
- 05000312/LER-1981-035, Forwards LER 81-035/03L-1.Detailed Event Analysis Submitted + (20:43:42, 20 December 2024)
- ML20030C032 + (20:43:44, 20 December 2024)
- A01919, Documents Concurrence W/Nrc Proposal to Hold 801204 Hearing Request in Abeyance Until NRC Has Completed Action on Industry Petition to Extend 820630 Deadline for Environ Qualification of safety-related Equipment + (20:43:47, 20 December 2024)
- ML20030C027 + (20:43:53, 20 December 2024)
- ML20030C026 + (20:43:55, 20 December 2024)
- ML20030C025 + (20:43:55, 20 December 2024)
- ML20030C024 + (20:43:56, 20 December 2024)
- ML20030C023 + (20:43:57, 20 December 2024)
- ML20030C020 + (20:44:01, 20 December 2024)
- ML20030C019 + (20:44:02, 20 December 2024)
- 05000270/LER-1981-010-03, /03L-0:on 810423,turbine Driven Emergency Feedwater Pump Trip Mechanism Discovered in Tripped Position W/Valve 2MS-94 Shut.Cause Unknown.Trip Place Tightened & Spring re-engaged + (20:44:03, 20 December 2024)
- ML20030C007 + (20:44:11, 20 December 2024)
- ML20030C005 + (20:44:13, 20 December 2024)
- 05000270/LER-1981-010, Forwards LER 81-010/03L-0.Detailed Event Analysis Encl + (20:44:14, 20 December 2024)
- ML20030C000 + (20:44:18, 20 December 2024)
- ML20030B999 + (20:44:19, 20 December 2024)
- ML20030B998 + (20:44:20, 20 December 2024)
- ML20030B996 + (20:44:21, 20 December 2024)
- 05000346/LER-1981-039-03, /03L-0:on 810718,during Checklist Review, Containment Personnel Air Lock Surveillance Test Found Not Performed within Required Time Frame.Caused by Personnel Error.Precautionary Note Will Serve as Reminder + (20:44:23, 20 December 2024)
- IR 05000354/1981011 + (20:44:26, 20 December 2024)
- 05000339/LER-1981-057-03, /03L-0:on 810720,during Hot Standby,Discovered 2H Emergency Generator Acceleration Untested & Offsite Power Not Verified within Tech Specs Limits.Caused by Procedural Error.Acceleration & Power Verified on 810720 + (20:44:28, 20 December 2024)
- ML20030B992 + (20:44:30, 20 December 2024)
- 05000346/LER-1981-039, Forwards LER 81-039/03L-0 + (20:44:32, 20 December 2024)
- ML20030B985 + (20:44:35, 20 December 2024)
- ML20030B984 + (20:44:36, 20 December 2024)
- 05000339/LER-1981-057, Forwards LER 81-057/03L-0 + (20:44:38, 20 December 2024)
- ML20030B981 + (20:44:40, 20 December 2024)
- ML20030B980 + (20:44:41, 20 December 2024)
- ML20030B979 + (20:44:42, 20 December 2024)
- ML20030B978 + (20:44:43, 20 December 2024)
- ML20030B976 + (20:44:44, 20 December 2024)
- ML20030B975 + (20:44:45, 20 December 2024)
- ML20030B974 + (20:44:47, 20 December 2024)
- 05000287/LER-1981-004-03, /03L-0:on 810312,valve 3FDW-105 Failed to Close Electrically After Chemical Sampling of Steam Generator B. No Apparent Cause Found.Valve Manually Closed & Circuit Breaker Opened,Disabling Valve + (20:44:48, 20 December 2024)
- ML20030B969 + (20:44:51, 20 December 2024)
- 05000287/LER-1981-004, Forwards LER 81-004/03L-0.Detailed Event Analysis Encl + (20:44:53, 20 December 2024)