Forwards Tables Responding to FSAR Open Items Based on NRC Questions Documented in Ltrs & Raised at Public Meetings
ML20030C007
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 08/21/1981
From: Bryan J
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
ULNRC-485, NUDOCS 8108250304
Download: ML20030C007 (7)


Text

.

UNION ELECTRIC COMPANY 1909 GRATIOT STREET ST. Louis. MISSOURI O eOx 649

. OHN K. eRYAN eT. Louse. Missouma estee v.ca passioant fim 4

e6gN August 21, 1981

,St Mr. Harold R.

Denton q

"l y-

Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

ULNRC-485 DOCKET NUMBEi's 50-483 AND 50-486 CALLAWAY PLANT, UNITS 1 & 2 FINAL SAFETY ANALYSIS REPORT

Reference:

B.

J.

Youngblood letter to J.

K.

Bryan dated August 12, 1981 The referenced letter transmitted two tables of open items for which the NRC had no record of a response.

The first tobic concerned questions documented in letters, the second table concerned questions documented in public meeting summaries.

Enclosed are two tables which reference the Union Electric response for each item, or provide a schedule for response.

f Very truly yours,

'w

(

L l

John K.

Bryan y

l I

DS/afg I

2 Enclosures 300' s

, /,

8108250304 810821 DR ADOCK 05000483 PDR t

. = _.

i l;

cc:

Glenn L. Koester Vice President l

Operations Kansas Gas & Electric P.O.

Box 208 Wichita, Kansas 67201 John E. Arthur Chief Engineer l

Rochester Gas & Electric Company i

89 East Avenue Rochester, New York 14649

~

A. V.

Dienhart Vice President Plant Engineering and Construction Northern States Power 414 Nicollet Mall Minneapolis, Minnesota 55401 Donald T. McPhee Vice President Kansas City Power and Light Company 1330 Baltimore Avenue Kansas City, Missouri 64141 l

l Gerald Charnoff, Esq.

Shaw, Pittman, Potts & Trowbridge 1800 M.

Street, N.W.

Washington, D.C.

20036 Nicholas A.

Petrick Executive Director SNUPPS 5 Choke Cherry Road i

Rockville, Maryland 20850 W. Hansen Callaway Resident Office U.S. Nuclear Regulatory Commission RR#1 Steedman, Missouri 65077

Page 1 of 2 CALLAWAY PLANT, UNIT 1 Responses to Questions Documented in Letters from NRC Ouestion Letter Letter Responses Branch Number Responding Date Scheduled Materials 123.1C SLNRC 81-69 8/14/81 Engineering 123.2C j

123.3C 123.4C 123.5C 123.6C 123.7C 123.8C 123.9C 123.10C 123. llc 4

Materials 250.1C SLNRC 81-34 5/26/81 I

Engineering Quality 360.52C ULNRC-447 5/22/81 Assurance 260.53C 260.54C 260.55C 260.56C 260.57C 260.58C 260.59C 260.60C l

260.61C 260.62C 260.63C 260.64C 260.65C 260.66C 260.67C 260.68C 260.69C 260.70C Generic 730.1 SLNRC 81-64 8/10/81 Issues Emergency 810.lC ULNRC-479 8/14/81 Preparedness 810.2C

'iLNRC-475 8/10/81 Page 2 of 2 Question Letter Letter Responses Branch Number Responding Date Scheduled Procedures &

640.1 8/31/81 Test Review 640.2 640.3 640.4 640.5 640.6 640.7 640.8 640.9 640.10 l

640.11

)

640.12 l

640.13 e

i 640.14 i

640.15 640.16 l

640.17 l

640.18

)

640.19 640.20 640.21 640.22 l

640.23 640.24 l

640.25 640.26 640.27 640.lc 640.2C 640.3C l

640.4C 1

640.5C 640.6C 640.7C 640.8C i

4 I

a e -w

l Page 1 of 4 CALLAWAY PLANT, UNIT 1 Responses to Questions Documented in Public Meeting Summaries Data of Branch Mtg. Data Mtg. Summary Question Closecut Date Rev.

MEB 6/9,10/81 7/6/81 VI.1 SLNRC 81-60 7/29/81 SP-5 3

4 5

6 8

9 11 12 l

14 15 16 (Scheduled 8/31/81) 17 SLNRC 81-60 7/29/81 SP-5

)

18 19 21 Included in NRC Mtg. Summar; 22 SLNRC 81-60 7/29/81 SP-5 23 24 (Scheduled 8/31/81) 25

(

)

26 SLNRC 81-60 7/29/81 SP-5 27 Closed in the meeting 28 (Scheduled 8/31/81) 29

(

)

30

(

)

33 Closed

  • 34 (Scheduled 8/31/81) 35

(

)

36 SLNRC 81-60 7/29/81 SP-5 37 (Scheduled 8/31/81) l 38

(

)

j 39 SLNRC 81-60 7/29/81 SP-5 i

SEB 5/5/81 5/8/81 2.

Closed by NRC Mtg. Summary 3.

SLNRC 81-62 8/10/81

  • Closed since lengitudinal break exception to MEB 3-1 has not been taken.

See FSAR Std Pi Table 3.6-2 Page 2 of 4 Data of Branch Mtg. Data Mtg. Summary Question Closeout Date Rev.

HGEB 4/27/81 5/18/81 D.1 UNLRC-452 6/5/81 NA 2.a 2.b 2.c 3.

4.

f l QAB 4/24/81 4/28/81 1.

ULNRC-447 5/22/81 2.

4 3.

(Scheduled 8/31/81)

' ASB 2/12/81 2/18/81 2.a SLNRC 81-60 7/29/81 SP-5 2.b 2.c l

2.d 3/19/81 3/23/81 4.a ULNRC-441 5/15/81 SA-3 4.b 4.c 4.d 4.e l

4/29/81 5/1/81 2.a Wolf Creek concern i

2.b SLNRC81-60 7/29/81 SP-5 5/13/81 5/26/81 2.b SLNRC 81-60 7/29/81 SP-5 3. a)

SLNRC 81-48 6/22/81 3.bj, additional info due 9/22/81 l

! ICSB Status of all agenda items refer to SLNRC 81-68 8/14/81 7/27/81 Expected 8/14/81 2.

SLNRC 81-72 8/19/81 SP-6 3.

l 8.

81-60 7/29/81 SP-5 l

9, n

n n

n 10.

12.

81-72 8/19/81 SP-6 13.

81-60 7/29/81 SP-5 14.

81-72 8/19/81 SP-6 16.

19.

20.

81-60 7/29/81 SP-5 21.

24.

25.

81-72 8/19/81 SP-6 34.

36.

81-60 7/29/81 SP-5 39.

81-72 8/19/81 SP-6 40.

81-60 7/29/81 SP-5

Page 3 of 4 Data of Brancl.

Mtg. Data Mtg. Summary Question Closeon Date Rev.

43.

SLNRC 81-72 8/19/81 SP-(

45.

46.

48.

49.

50.

d t

51.

52.

54.

60.

68.

Position 1.

SLNRC 81-67 8/14/81 2,

o n

6.

7.

8.

9.

10.

Post SER item-See SLNRC 81-67 (8/14/81)

PSB 5/14/81 5/27/81 2.(430.22)

SLNRC 81-60 7/29/81 SP-5 3.(430.3,22) 4.(430.5) 5.(430.6) 6.(430.9) 7.(430.11) 8.(430.14) 9.(430.15) 10.(430.30,32) 11.(430.34,35) 12.(430.38) 13.(430.41) 14.(430.42) l 15.(430.43) l 16.(430.51) 17.(430.54) 18.

SLNRC 81-50 6/29/81 SP-4 7/16/81 Expected 8/14/81 3.

    • SLNRC 81-72 8/19/81 SP-6

[8/13/81]

4.

6.c 6.d 6.e 6.f l

    • Site Related response schedule 8/25/81.

Page 4 of 4 Data of Branch Mtg. Data Mtg. Summary Question Closecut Date Rev.

6.g SLNRC 81-72 8/19/81 SP-6 6.h 9.

10.

SLNRC 81-73 8/20/81 SP-6 l

11.a SLNRC 81-73 8/20/81 11.b SLNRC 81-72 8/19/81 SP-6 11.c ll.d 14.

15.

18.

19.

(Scheduled 8/31/81)

RSB 7/21/81 Expected 8/12/81 2.

[8/12/81]

3.

SLNRC 81-72 8/19/81 SP-6 1

5.

(Scheduled 8/31/81) 9.

SLNRC 81-72 8/19/81 SP-6 14.

(Scheduled 8/31/81) 16.

SLNRC 81-72 8/19/81 SP-6 440.101 (Scheduled 8/31/81) 440.104

(

)

440.105

(

)

440.106

(

)

440.205

(

)

440.207 SLNRC 81-72 8/19/81 SP-6 CSB 6/23/81 7/23/81 6.2.1.1 A-2 SLNRC 81-72 8/19/81 SP-6 A-3 i

A-4 (Scheduled 8/31/81)

A-6 SLNRC 81-72 8/19/81 SP-6 6.2.1.4-1 6.2.1.2-1 6.2.1.3-4 6.2.1.4-1

-3 6.2.2-3

-4 l

6.2.4-1 6.2.4-5 i

      • Closed for RSB in NRC Mtg. Summary; to be resolved with ICSB.

1 7

,,-p p_

___g.

._.,-._w