ML20030C032

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-06.Corrective Actions:Maint Supervisor to Perform Periodic Random Review of Received Repts & Stores Requisitions
ML20030C032
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/09/1981
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20030C029 List:
References
LQA8100062, NUDOCS 8108250332
Download: ML20030C032 (2)


Text

_-

j//- p-dW

//-c'd COOPER NUCLE AR ST ATION Nebraska Public Power District

" 9'A"E, *"RA'; U,T."Y" "'"

s o

- - - _ _ - =

LQA8100062 June 9, 1981 Mr. W. C. Seidle, Chief Engineering Inspection Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan -laza Drive Suite 10.<

Arlington, Texas 76011

Subject:

NPPD Response to IE Inspection Report No. 50-298/81-06

Dear Mr. Seidle:

This letter is written in response to your letter dated May 14, 1981, and the subsequent inspection report number 50-298/81-06.

Statement of Violation Failure to Follow Procedures 10 CFR Part 50, Appendix B, Criterion V states that activities affecting quality shall be prescribed by documented instructions ani procedures and shall be accomplished in accordance with these instructions and procedures.

Cooper Nuclear Station Administrative Procedure 1.11, " Requisitioning, Receiving, Storage of Essent;ai Parts and Components," Revision 16, approved January 7, 1981, requires the following:

1.

Sections 1.11.4.3.8 and 1.11.4.4 require verification of compliance of the material, part, or component and required documentation with purchase order requirements and documentation of this inspection on the receiving report.

2.

Sections 1.11.6.1.1 and 1.11.6.1.2 require for "CNS Stores Requi-stions" the following:

a.

Completion by the requisitioner of the work document description.

b.

Completion by the storekeeper of the material status.

I e

R108250332 810716 PDR ADOCK 05000298 O

PDR