Responds to NRC Re Violations Noted in IE Insp Repts 50-352/81-09 & 50-353/81-07.Corrective Actions: Plywood Cover Retaped on Valve & Storage Maint Program Insp Activity for Recirculation Valves Will Be Perfomed Weekly
ML20030B975
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/03/1981
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20030B972 List:
References
NUDOCS 8108250274
Download: ML20030B975 (3)


Text

.

PHILADELPHIA ELECTRIC COMPANY RM *-

2301 M ARKET STREET P.O. BOX 8699 00 'I90I PHILADELPHI A. PA.19101 (215) 841+ 4 5o 2

.... = :: =...

AUG 0 31981 Mr. Boyce Grier, Director United States Nuclear Regulatory Commission Office of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

USNRC IE Region Letter dated July 15, 1981 RE: Site Inspection of June 2-5, 1981 Inspection Report Nos. 50-352/81-09 & 50-353/81-07 Limerick Generating Station - Units 1 and 2 File:

QUAL 1-2-2 (352/81-09 & 353/81-07)

Dear Mr. Grier:

In response to the subject letter regarding items identified during the subject inspection of construction activities authorized by NRC License Nos. CPPR-106 and -107, we transmit herewith the following:

Attachment I - Response to Appendix A Also enclosed as required by the Notice of Violation, is an affidavit relating to the response.

Should you have any questions concerning these items, we would be pleased to discuss them with you.

Sincerely, f S. K,L l

JPE/gra l

Attachment Copy to:

Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D.C.

20555 J.

P.

Durr, USNRC Resident Inspector 8108250274 810819 PDR ADOCK 05000352 g

PDR

(

ATTACHMENT I Response to Appendix A 9

i Violation i

10CFR50, Appendix B, Criterion V, states, in part, that: " Activities affecting quality shall be... accomplished in accordance with these instructions, procedures, or drawings."

The Limerick PSAR, Appendix D, Paragraph 6.4, states, in part "Bechtel Construction Department...is responsible for construction 4

of the plant to approved engineering specifications....".

General Electric Specification 22A2724, Revision 3, Equipment Storage Requirements, Paragraph 4.1.2.1.2.a, states, in part:

" Internal cleanliness of equipment...shall be maintained by closing openings, where possible, by plugging, capping, and/or sealing with tape.

Butt weld preps on valves...shall have plywood fitted against the prep and tape sealed."

Contrary to the above, on June 3, 1981, reactor coolant pressure boundary valve 2F023A was observed to have no plywood cover fitted against the weld prep and tape sealed.

Response to Violation The plywood cover was retaped on the valve immediately, as indicated in the NRC Inspection Report.

No evidence of excessive dust or dirt accumulation was observed inside this valve at the time the cover was replaced.

To prevent recurrence of this unsatisfactory storage condition, the Storage Maintenance Program inspection activity for all eight of i

the Recirculation Valves, both Unit 1 and Unit 2, will be performed on a weekly basis until our records indicate consistent satisfactory storage conditions.

I The NRC concern in the letter transmitting this Inspection Report, regarding the repetitive nature of recirculation valve storage conditions was evaluated by Philadelphia Electric Company.

The f

unsatisfactory storage conditions have different causes.

The first unsatisfactory storage condition identified in NRC Report 352 and 353/81-04, identified a Unit 1 recirculation valve that was installed in an active work area, as not being covered with a plastic sheet.

In that case, we believe the corrective action taken to prevent recurrence was appropriate and effective.

The storage condition identified in this Inspection Report was a Unit 2 valve in a long term storage condition which was adequately covered with a plastic sheet.

However, the wooden cap over the valve opening fell off as a result of the duct tape's deterioration.

The additional corrective action which we have taken should assure the effectiveness of the corrective action for both conditions.

l

[

I 1/1 50-352/81-09 50-353/81-07 i

l

l l

COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF PHILADELPHIA JOHN S.

KEMPER, being first duly sworn, deposes and says:

That he is Vice President of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for Limerick Generating Station Units 1 and 2: that he has read the foregoing Response to Inspection Report Nos. 50-352/81-09 and 50-353/81-07 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

,U.. SWL,.,

Subscribed and sworn to before me this day hl.

of

$b w

~

ary Publid LIZAB TH H. BOYER N ary Publ, Phila., Phila. Cb.

My C n Expires Jan. 30,1982

(