Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19312E554 + (05:48:23, 2 January 2025)
- ML19312E552 + (05:48:24, 2 January 2025)
- ML19312E553 + (05:48:24, 2 January 2025)
- ML19312E550 + (05:48:27, 2 January 2025)
- ML19312E551 + (05:48:27, 2 January 2025)
- ML19312E549 + (05:48:30, 2 January 2025)
- ML19312E548 + (05:48:33, 2 January 2025)
- ML19312E547 + (05:48:35, 2 January 2025)
- ML19312E546 + (05:48:35, 2 January 2025)
- ML19312E545 + (05:48:36, 2 January 2025)
- ML19312E544 + (05:48:37, 2 January 2025)
- ML19312E543 + (05:48:38, 2 January 2025)
- ML19312E541 + (05:48:39, 2 January 2025)
- ML19312E542 + (05:48:39, 2 January 2025)
- ML19312E540 + (05:48:40, 2 January 2025)
- ML19312E539 + (05:48:40, 2 January 2025)
- ML19312E537 + (05:48:41, 2 January 2025)
- ML19312E536 + (05:48:42, 2 January 2025)
- ML19312E535 + (05:48:44, 2 January 2025)
- ML19312E534 + (05:48:45, 2 January 2025)
- ML19312E533 + (05:48:46, 2 January 2025)
- IR 05000293/1980012 + (05:48:52, 2 January 2025)
- PNO-II-80-090, on 800520,while in Process of Pouring Unit A-1 Vent Wall,Crane Brake Failed & Dropped Four Cubic Yard Concrete Bucket.Three Employees Were Severely Injured. Licensee Plans to Issue Press Release + (05:48:54, 2 January 2025)
- PNO-II-80-091, on 800520,small Crack Developed in Pipe Carrying Hydrogen Sulfide in Heavy Water Extraction Process Area.Crack Increased & Chemical Emergency Declared on 800521.Leak Temporarily self-sealed.Repairs in Process + (05:48:56, 2 January 2025)
- IR 05000445/1980009 + (05:49:01, 2 January 2025)
- ML19312E528 + (05:49:02, 2 January 2025)
- ML19312E527 + (05:49:03, 2 January 2025)
- TXX-3132, Responds to NRC Re Violation Noted in IE Insp Repts 50-445/80-09 & 50-446/80-09.Corrective Actions: Conducted Review of Flow Measuring Instrumentation,Water Demand & Recording Procedure + (05:49:04, 2 January 2025)
- ML19312E524 + (05:49:06, 2 January 2025)
- ML19312E523 + (05:49:08, 2 January 2025)
- ML19312E522 + (05:49:09, 2 January 2025)
- ML19312E521 + (05:49:10, 2 January 2025)
- ML19312E520 + (05:49:11, 2 January 2025)
- ML19312E518 + (05:49:12, 2 January 2025)
- ML19312E516 + (05:49:17, 2 January 2025)
- ML19312E512 + (05:49:18, 2 January 2025)
- ML19312E513 + (05:49:18, 2 January 2025)
- 05000318/LER-1980-028-03, /03L-0:on 800512,during Steady State Operation, Discovered Plant Computer Had Failed.Caused by I/O Power Failure Due to Generation of Noise Spike + (05:49:20, 2 January 2025)
- ML19312E510 + (05:49:21, 2 January 2025)
- 05000348/LER-1980-030-03, /03L-0:on 800501,radiation Monitor R25A (Fuel Storage Pool Area) Declared Inoperable Due to Power Loss. Caused by Blown Fuse.Connecting & Disconnecting Test Equipment Cause for Blown Fuse.Fuse Replaced + (05:49:22, 2 January 2025)
- ML19312E507 + (05:49:23, 2 January 2025)
- 05000318/LER-1980-028, Forwards LER 80-028/03L-0 + (05:49:24, 2 January 2025)
- 05000348/LER-1980-029-03, /03L-0:on 800430,intermediate Range Nis Channel N-35 Declared Inoperable Due to Loss of Power.Caused by Loose Terminal Screw on 120-volt Vital Ac Panel 1A Molded Case Breaker.Wire Reconnected + (05:49:26, 2 January 2025)
- 05000317/LER-1980-024-03, /03L:on 800430,while Making Containment Insp, Discovered Cracked Weld on 11B Reactor Coolant Pump Control Bleedoff Line.Caused by Metal Fatigue Induced by Vibration. Pipe Replaced & Weld Repair Performed + (05:49:27, 2 January 2025)
- ML19312E502 + (05:49:29, 2 January 2025)
- ML19312E500 + (05:49:30, 2 January 2025)
- ML19312E499 + (05:49:30, 2 January 2025)
- ML19312E498 + (05:49:31, 2 January 2025)
- 05000317/LER-1980-024, Forwards LER 80-024/03L-0 + (05:49:33, 2 January 2025)
- ML19312E494 + (05:49:34, 2 January 2025)
- 05000325/LER-1980-038-03, /03L-0:on 800501,during Normal operation,1A Reactor Recirculation Pump Tripped on Motor Generator Set Low Oil Pressure.Caused by PCV-1739 Controlling Erratically During Radom Periods & Possible Setpoint Drift + (05:49:36, 2 January 2025)