Text
_
e
.
,
- Ho ,,fo
u
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
7
g
- '*.
REGloN IV
o
7
i) ^
o
611 RY AN PLAZA DRIVE, SUITE 1000
7. jg [
. .j
ARLINGTON, TEXAS 76012
g
o
g
\\; +' .w. '. . /
0 7 APR 1980
In Reply Refer To:
RIV
Docket Nos. 50-445/Rpt.
80-09
50-446/Rpt.
80-09
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. Lorenzo Wilborn during the
period March 12-14, 1980, of activities authorized by NF.C Construction Permit
Nos. CPPR-126 and 127 for the Comanche Peak Project Units No. 1 and 2, and to
the discussion of our findings with Mr. J. T. Merritt and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements as set forth in the
Notice of Violation, enclosed herewith as Enclosure 1.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within thirty (30) days
of your receipt of this notice, a written statement or explanation in reply
including (1) corrective actions which have been taken by you and the results
achieved; (2) corrective actions which will be taken to avoid further items of
noncompliance; and (3) the date when full compliance will be achieved.
One new unresolved item is identified in paragraph 5.a. of the enclosed report.
-. * * * *?5 9 g\\G
.
.
_
'
.
Tuan Utilities Gensrating Comp ny
2
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application muse. include a full statement of the reasons
why it is claimed that the information c proprietary.
The application should
be prepared so that any proprietary it ' - mation identified is contained in an
enclosure to the application, since tim application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
J-
?&E
G. D. Brown, Chief
Fuel Facility and Material
Safety Branch