e May 30, 1980 FILE: NG-3514(B)

' SERIAL NO.:

NO-80-798 Darrell G. Eisenhut, Director Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.

20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 & 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 IMPLEMENTATION OF SHORT-TERM LESSONS LEARNED ITEM 2.2.1.c - SHIFT AND RELIEF TURNOVER PROCEDURES

Dear Mr. Eisenhut:

On December 31, 1979, Carolina Power & Light Company (CP&L) submitted to you a letter which detailed its implementation of the Short-Term Lessons Learned items at the Brunswick Plant. Please find attached an amended response to the implementation of Item 2.2.1.c - Shift and Relief Turnover Procedures.

Although the implementation of Item 2.2.1.c at Brunswick has been altered slightly, it still conforms with the NRC position stated in H. R. Denton's letter of October 30, 1979.

If you have any questions on this subject, please contact our staff.

Yours very truly, C

m E. E. Utley Executive Vice President Power Supply and Engineering & Construction EEU/JJS/t1 cc:

J. N. Hannon oYo s

/!/

8006050 6 /

O CP&L Implementation of Item 2.2.1.c CP&L Response to NRC Position No. 1 At the Brunswick Plant, a checklist has been provided which the oncoming Shift Operating Supervisor (Shift Supervisor) must complete and sign during his shift.

Part of this checklist includes a review with the offgoing Shift Operating Supervisor of the operational status of plant equipment, as well as major work items in progress. The following items have been included in the checklist.

a.

Assurance that critical plant parameters, as identified in the plant Technical Specifications, are within allowable limits (parameters and allowable limits are listed on the checklist),

b.

Assurance of the availability and proper alignment of all systems essential to the prevention and mitigation of operational transients and accidents by a check of the control console (what to check and acceptance criteria is included on the checklist).

c.

Identification of systems and components that are in a degraded mode of operation permitted by the Technical Specifications. For such systems and components, the length of time in the degraded mode is compared with the Technical Specifications action statement by the completion of a separate form at the beginning of each shift.

CP&L Response to NRC Position No. 2 Logs have been provided for completion by the offgoing and oncoming auxiliary operators. Remarks must be included in these logs describing equipment out of service, under maintenance or testing, etc.

These logs include what equipment to check, a check of the various rooms and areas throughout the units, the frequency of the required inspections, and a separate remarks section in which abnormalities are recorded.

CP&L Response to NRC Position No. 3 A system has been established to evaluate the effectiveness of the shift and relief turnover procedure through Quality Assurance surveillance of shift turnovers.

l

-