Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062M100 + (03:29:14, 17 December 2024)
- ML20062M099 + (03:29:14, 17 December 2024)
- JPN-93-087, Informs That Util Rescheduling Several Commitments Associated W/Upgraded Emergency Plant Info Computer (EPIC) as Submitted in Revised Response to GL 83-28.Revised Schedule for EPIC Related Mods Encl + (03:29:15, 17 December 2024)
- ML20062M097 + (03:29:16, 17 December 2024)
- ML20062M095 + (03:29:17, 17 December 2024)
- ML20062M077 + (03:29:17, 17 December 2024)
- 05000219/LER-1993-004, :on 930602,discovered That Incorrect UFSAR Could Result in Potential Design Concerns.Caused by Inadequate Documentation.Ufsar Will Be Revised to Include Results of Recent Evaluation + (03:29:19, 17 December 2024)
- 05000219/LER-1993-008-01, :on 931203,inadvertent Actuation of Core Spray Sys 1 Occurred During Surveillance Testing.Caused by Inattention to Duty.Corrective Actions Will Be Incorporated Into I&C Personnel Training Program + (03:29:22, 17 December 2024)
- ML20062M069 + (03:29:23, 17 December 2024)
- ML20062M067 + (03:29:24, 17 December 2024)
- ML20062M068 + (03:29:24, 17 December 2024)
- ML20062M051 + (03:29:25, 17 December 2024)
- ML20062M047 + (03:29:26, 17 December 2024)
- ML20062M044 + (03:29:27, 17 December 2024)
- ML20062M040 + (03:29:28, 17 December 2024)
- ML20062M025 + (03:29:29, 17 December 2024)
- ML20062M031 + (03:29:29, 17 December 2024)
- ML20062L998 + (03:29:30, 17 December 2024)
- ML20062M011 + (03:29:30, 17 December 2024)
- ML20062L983 + (03:29:31, 17 December 2024)
- ML20062L982 + (03:29:31, 17 December 2024)
- ML20062L977 + (03:29:32, 17 December 2024)
- ML20062L968 + (03:29:32, 17 December 2024)
- ML20062L966 + (03:29:33, 17 December 2024)
- ML20062L963 + (03:29:34, 17 December 2024)
- ML20062L964 + (03:29:34, 17 December 2024)
- ML20062L961 + (03:29:35, 17 December 2024)
- ML20062L958 + (03:29:35, 17 December 2024)
- ML20062L949 + (03:29:36, 17 December 2024)
- ML20062L932 + (03:29:37, 17 December 2024)
- ML20062L929 + (03:29:38, 17 December 2024)
- ML20062L922 + (03:29:39, 17 December 2024)
- ML20062L928 + (03:29:39, 17 December 2024)
- ML20062L921 + (03:29:40, 17 December 2024)
- ML20062L919 + (03:29:41, 17 December 2024)
- ML20062L920 + (03:29:41, 17 December 2024)
- ML20062L916 + (03:29:42, 17 December 2024)
- 05000267/LER-1981-071-03, /03L-0:on 811108,w/reactor at Full Power Level,In Liquid Nitrogen Storage Tank Decreased Below Tech Spec Limit.Caused by High Sys Consumption W/Late Delivery of Liquid Nitrogen + (03:29:44, 17 December 2024)
- 05000267/LER-1981-071, Forwards LER 81-071/03L-0.Detailed Event Analysis Encl + (03:29:45, 17 December 2024)
- LD-93-178, Responds to Comments on ABB-CE Design Descriptions & Associated Insps,Tests,Analyses & Acceptance Criteria & on Changes to CESSAR-DC.Rept Entitled, Certified Design Matl Encl + (03:29:46, 17 December 2024)
- ML20062L863 + (03:29:46, 17 December 2024)
- AECM-82-348, Monthly Operating Rept for Jul 1982 + (03:29:47, 17 December 2024)
- ML20062L850 + (03:29:47, 17 December 2024)
- ML20062L845 + (03:29:48, 17 December 2024)
- ML20062L831 + (03:29:49, 17 December 2024)
- ML20062L840 + (03:29:49, 17 December 2024)
- ML20062L827 + (03:29:50, 17 December 2024)
- ML20062L830 + (03:29:50, 17 December 2024)
- ML20062L815 + (03:29:51, 17 December 2024)
- 05000324/LER-1981-012-03, /03L-0:on 810320,wiring Deficiency Associated W/ Actuation Switch Discovered That Prevented Switch Operation. Caused by Improper Writing of Field Revision to Plant Mods Requiring Installation of Switches + (03:29:52, 17 December 2024)
- ML20062L793 + (03:29:53, 17 December 2024)
- ML20062L782 + (03:29:54, 17 December 2024)