ML20062L977
| ML20062L977 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 08/16/1982 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20062L980 | List: |
| References | |
| NUDOCS 8208190312 | |
| Download: ML20062L977 (2) | |
Text
'
@p&L Carolina Power & Light Company AUG IS 1982 Office of Nuclear Reactor Regulation ATTN:
Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 United Stctes Nuclear Regulatory Commission Washington, D.C.
20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 TECHNICAL SPECIFICATION REVISION REQUEST - RPS MG Sets
Dear Mr. Vassallo:
SUMMARY
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP&L) hereby requests revisions to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP) Unit Nos. 1 and 2.
The enclosed changes supersede those submitted to NRC by our letter dated May 24, 1982.
DISCUSSION At CP&L's request, NRC deferred review on the May 24, 1982 submittal until CP&L could provide actual data on over-voltage, under-voltage and under-frequency protective instrumentation voltages with the concomitant setpoints. The enclosed TS pages provide the actual test voltages and the respective setpoints.
In a February 25, 1982 telephone conversation with your staff, CP&L committed to provide the time delay settings for the RPS MG Set and the Alternate Source during over-voltage, under-voltage and under-frequency voltage conditions. The time delay has been verified to be within the tolerance of 0.1 seconds -- 0.133 seconds, which is in accordance with design specifications.
lpo\\
9209190312 920916 DR ADOCK 05000324 p
PDR 411 Fayetteville Street e P. O. Box 1551
- Raleigh, N. C. 27602
- crrs%rmsm: sca=m:ngz_
es,"=--and M wa
ADMINISTRATIVE INFORMATION Please find enclosed two pages each for the proposed BSEP Unit Nos. 1 and 2 TS with the changes indicated by vertical lines in the right-hand margins. Our January 29, 1982 revision request (Serial No. NO-82-084) included a check for $4,400 for a Class III and Class I Amandment for BSEP Unit Nos. 1 and 2; therefore, no additional fees are necessary.
Should you have any questions regarding this matter, please contact our staff.
Yours very truly, E. E. Utley Executive Vice President Power Supply and Engineering & Construction i
MSG / mag (422C6T5) l Enclosures cc: Messrs. D. O. Myers (NRC-BSEP)
J. P. O'Reilly (NRC-RII)
J. A. Van Vliet (NRC) i E. E. Utley, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.
$1112AmaA>..
Notary (Seal)
'g "
My commission expires:
10/4/86
.'"a*..
5 lsOTARy\\
5 hk# U B L )C f
,5
?
=
,C
's trilititlIU I
_.