05000267/LER-1981-071, Forwards LER 81-071/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-071/03L-0.Detailed Event Analysis Encl
ML20062L898
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/08/1981
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20062L903 List:
References
P-81309, NUDOCS 8112160160
Download: ML20062L898 (4)


LER-1981-071, Forwards LER 81-071/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
2671981071R00 - NRC Website

text

__

,7 public servlee company oe conotmde VA 16805 Road 19 1/2, Platteville, Colorado '80651-9298 December 8, 1981

' ~

i W[,., r ew, Fort St. Vrain 9

Unit No. 1 1

P-81309

- 4,%//

g

- s

s G IS a

e Jg Mr. John T. Collins, Regional Administrator e '9,,;

Region IV-

/j-

. [E/

Nuclear Regulatory Commission

'lu j 1;t _

611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011

Reference:

Facility Operating License No. DPR '

Docket No. 50-267.

Dear Mr. Collins:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/81-071, Final, submitted per the requirements'of Technical Specification AC 7.5.2(b)2.

Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/81-071.

1 Ve truly yours,-

f f

Don Warembourg

["

Manager, Nuclear Produ, on-DW/cis g]((,,[1 Enclosure T

cc: Director, MIPC

'O~

\\

DEC)11981

\\\\'j)

V L

i r

$#EUoligg Sg(,

i.

A

P REPORT DATE:

December 8.1981 REPORTABLE OCCURRENCE 81-071 ISSUE.0 OCCURRENCE DATE:

November 8, 1981 Page l'of 3 FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLCRADO 16805 WELD COUNTY ROAD.19 1/2~

PLATTEVILLE, COLORADO 80651-9298 REPORT NO. 50-267/81-071/03-L-0 Final IDENTIFICATION OF, OCCURRENCE:

On November 8, 1981,*d'uring steady state power operation, the volume of liquid nitrogen in~'the liquid nitrogen storage tank was lower than,.

the limit of 650 gallons specified by LCO 4.2.12.

This is operation "

in a degraded mod'e' df'LC0 4.2.12 and is reportable per Fort St. Vrain' Technical Specificat'fon AC 7.5.2(b)2.

EVENT

~ -

~

DESCRIPTION

At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on November: 8; 1981, with the' plant operating at 100*'

power and 328 MWe, the volume-of liquid nitrogen in the l_iquid nitrogen storage. tank Was noted as being below the 659 gallen level limit of LCO 4.2.12.

p delJvery,f of iiqu'id nitrogen arrived on site at A

scheduled 0610 hours0.00706 days <br />0.169 hours <br />0.00101 weeks <br />2.32105e-4 months <br />, November 8, 1981.. By 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> on November 8, 1981, an acceptable level in exc'ess of 'the 650 ga'llon limit had been restor'ed' <

as a result of off-loadin'y the liquid nitrogen into the liquid,,

nitrogen storage tank, within/the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed by LCO,4.2.12.

3 a;

liquid njtrogen in tiie st_o. rage tanE..;

The lowest measured slevel' of during the period f rom '0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> to 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> on h% nmber 8, 1981, " '

was 450 gallons.

,' /

)1 s,.,

The dewpoint moisture monitors and low t'emperature adsorber remained operable during this occurrence.

W

/.,

L,

CAUSE

- },:

DESCRIPTION

21 The simultaneous high use of liquid nitrogen atTfull power' operation, together with the late arrival of ~ a prescheduled liquid nitrogen delivery resulted in the lowering of the liq'uid nitrogen level beicw the 650 gallon limit of LCO 4.2.12.

as C

~

\\-

_,, :- r

^(_

REPORTABLE OCCURRENCE 81-071 ISSUE O

.Page 2 of:3 4

CORRECTIVE-ACTION:

'A ; scheduled. load of liquid. nitrogen was received..Th'e delivery of-the. liquid nitrogen to the system brought the-tank to.an acceptable 4'

' ~ ~, '-

.l e ve l '.

?

.No.further corrective action'is anticipated.or required.

l l'

1.

k e

3 A

.e 1.

i g

E

.j.

~

y

+"

my.

W 4

-

  • 3.

9 3

REPORTABLE OCCURRENCE 81-071

- 4

~-

~O 7l/

h ISSUE 0.

Q

?,.

Page 3 of 3 s

hk d

1 97 " 'g " h -i -

+

y 1

17 g

, 4 s 3 5

.\\

1 jfb

.l PrepgedBy:

///(-( Lf-h Pa'ul A. Trar6p Technical Services Technician

  • ,, s'.-

- ' Revie',ed By:

__C arles Fuller 4

Technical Services Engin Ping Supervisor m.

1

/

t s

/

Reviewed By:

[/ //

Statibn Mana)gerEdw1njQ/H1'l '~V s

w

+

n, s t - (

Approved By: