Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072H055 + (10:13:10, 15 December 2024)
- DCL-94-167, Forwards Public Version of Revised Corporate ERPIPs.W/940824 Release Memo + (10:13:11, 15 December 2024)
- ML20072H053 + (10:13:11, 15 December 2024)
- ML20072H051 + (10:13:12, 15 December 2024)
- HL-4648, Application for Amend to License DPR-57,proposing one-time Change to TS 3.9.C to Allow Shutdown Operations W/Only One of Two Required EDGs Aligned to Corresponding Core or Containment Cooling Sys + (10:13:13, 15 December 2024)
- ML20072H035 + (10:13:13, 15 December 2024)
- ML20072H021 + (10:13:14, 15 December 2024)
- ML20072H029 + (10:13:14, 15 December 2024)
- ML20072H019 + (10:13:15, 15 December 2024)
- ML20072H017 + (10:13:16, 15 December 2024)
- ML20072H016 + (10:13:16, 15 December 2024)
- ML20072H004 + (10:13:17, 15 December 2024)
- ML20072H013 + (10:13:17, 15 December 2024)
- ML20072G999 + (10:13:18, 15 December 2024)
- ML20072H001 + (10:13:18, 15 December 2024)
- ML20072G997 + (10:13:19, 15 December 2024)
- ML20072G995 + (10:13:26, 15 December 2024)
- ML20072G987 + (10:13:27, 15 December 2024)
- ML20072G989 + (10:13:27, 15 December 2024)
- ML20072G986 + (10:13:28, 15 December 2024)
- ML20072G984 + (10:13:28, 15 December 2024)
- 05000362/LER-1983-020, Forwards LER 83-020/01T-0 + (10:13:29, 15 December 2024)
- ML20072G979 + (10:13:29, 15 December 2024)
- 2CAN028313, Forwards Procedures Re Resins Involved in High Integrity Container Exothermic Reaction,Per 830204 Telecopy Request + (10:13:36, 15 December 2024)
- ML20072G957 + (10:13:43, 15 December 2024)
- 05000362/LER-1983-022, Forwards LER 83-022/01T-0 + (10:13:51, 15 December 2024)
- AECM-83-0308, Responds to IE Bulletin 83-03 Re Check Valve Failures in Raw Water Cooling Sys of Diesel Generators.Three Check Valves in Standby Svc Water Sys Meet Applicable Criteria.Addl Response Will Be Submitted When Valve Verification Completed + (10:14:04, 15 December 2024)
- ML20072G904 + (10:14:04, 15 December 2024)
- ML20072G893 + (10:14:05, 15 December 2024)
- ML20072G876 + (10:14:06, 15 December 2024)
- ML20072G884 + (10:14:06, 15 December 2024)
- ML20072G818 + (10:14:33, 15 December 2024)
- ML20072G806 + (10:14:40, 15 December 2024)
- ML20072G803 + (10:14:41, 15 December 2024)
- ML20072G794 + (10:14:42, 15 December 2024)
- ST-HL-AE-4860, Forwards STP Unit 2 Cycle 4 Startup Testing Summary Rept, Per TS 6.9.1.1.During Recent Cycle 3 to Cycle 4 Refueling outage,56 Feed Fuel Assemblies W/Integral Fuel Burnable Absorbers Installed + (10:14:48, 15 December 2024)
- ML20072G785 + (10:14:49, 15 December 2024)
- B14930, Proposed Tech Specs Increasing Time That RHR Pump May Be out-of-svc Before Plant Shutdown Is Required to Be Initiated + (10:14:50, 15 December 2024)
- ML20072G767 + (10:14:50, 15 December 2024)
- ML20072G749 + (10:14:59, 15 December 2024)
- ML20072G748 + (10:14:59, 15 December 2024)
- B14899, Provides Addl Info Re Proposed Rev to TS of Millstone Unit 2.Proposed Changes Would Allow Millstone Unit 2 to Take Advantage of re-evaluation of Design of 125 Volt Dc Sys + (10:15:00, 15 December 2024)
- RC-94-0215, Requests Meeting W/Nrc on 940929 to Discuss Implementation of Instrumentation Calibr Monitoring Program for Plant + (10:15:01, 15 December 2024)
- ML20072G718 + (10:15:08, 15 December 2024)
- ML20072G713 + (10:15:09, 15 December 2024)
- ML20072G710 + (10:15:10, 15 December 2024)
- ML20072G712 + (10:15:10, 15 December 2024)
- ML20072G708 + (10:15:11, 15 December 2024)
- ML20072G697 + (10:15:13, 15 December 2024)
- ML20072G694 + (10:15:14, 15 December 2024)
- ML20072G686 + (10:15:15, 15 December 2024)
- ML20072G689 + (10:15:15, 15 December 2024)