Rev 1 to Procedure 2104.17, Spent Fuel Resin Transfer
ML20072H004
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/08/1982
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20072G971 List:
References
2104.17, NUDOCS 8303290236
Download: ML20072H004 (14)


Text

-

f.. )

ARKANSAS POWER & LIGHT COMPANY

- Arkansas Nuclear One i '

N . RECORD OF CHANGES AND REVISIONS FOW NO.

1000.06A  !

AUXILIARY SYSTE N PERATING REV. # 8 PC #

  • V SPENT RESIN TRANSFER ,

2104.17 REV. 1 ,

. 9 hGEkREV PC#

llN-Contro!!adow PAGE REV PC# PAGE REV PC#

  1. 4R PAGE REV PC# PAGE REV PC#

4 1 1 2 1 -

3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 .

11 1 12 1 i 13 1 1 APPROVED BY: APPROVAL DATE 1fC!T?-

448/

  • I '

' U^ *

, & o,. a:

,j . ,i ,-(Gendra1 Manager)

D KO Ohbk8 ~ ~~ ~ %l P PDR J

1 PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 1 of 13

/ ARKANSAS NUCLEAR ONE aEvisiON i DATE io/22/8i CHANGE DATE 1.0 PURPOSE 1.1 To provide for transfer of Spent Resin to Spent Resin Tank 2T-13 from the following:

1.1.1 Waste Concentration Ion Exchanger 1.1.2 CVCS Ion Exchanger .

1.1.3 Fuel Pool Ion Exchanger 1.1.4 Preconcentrator Ion Exchanger 1.1.5 Boric Acid Condensate Ion Exchanger

2.0 DESCRIPTION

2.1 The Spent Resin Tank is designed to provide a one-year hold up capacity for spent resin to allow decay of short-lived activity.

2.2 Spent Resin is sluiced into the Spent Resin Tank from the various

. icn exchangers in the NSS Auxiliary System. Excess water which is accumulated in the Spent Resin Tank during the transfer of spent resin is drained to the Waste Tanks.

2.3 The Spent Resin Tank is equipped with a level indicator and high level alarm.

i

3.0 REFERENCES

OP 2104.20 Clean Waste Receiving System 2104.18 Waste Concentrator System 2104.19 Clean Resin Transfer 2104.02 CVCS 0.P.

2104.06 Fuel Pool System 4.0 LIMITS AND PRECAUTIONS 4.1 Valve operation and system checks may require personnel to be i exposed to potentially high radiation levels. All proper radio-l logical precautions should be observed to minimize the amount of personnel exposure, j 4.2 If a high level alarm is received in the Spent Resin Tank during the spent resin transfer, secure the spent resin transfer opera-tion and allow 2T-13 to drain.

4.3 Ensure adequate storage space in the Spent Resin Tank 2T-13 for j spent resin being transferred. Allow 12% (25% Resin / Water mixture)

, Resin Level Increase in 2T-13 for each Ion Exchanger covered by

)

l this procedure.

l 5.0 SETPOINTS l None l

l

, . e- ,

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: 1 MO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 2 of 13

< ARKANSAS NUCLEAR ONE REVISION 1 CHANGE DATE DATE LO/22/81 6.0 PROCEDURE Date Initials 6.1 To transfer resin from Waste Concentrator Ion Exchanger 2T-76 A&B to Spent Resin Tank 2T-13.

6.1.1 Ensure adequate space in 2T-13 for resin transfer. The resin level is determined by opening vent to gas collection header 2SZ-42 and 2SZ-20 and draining to drain collection header via 2SZ-10 until level in 2T-13 no longer drops as indicated on 2C-114A.

NOTE 12% change in resin level in 2T-13 corresponds to 32 cu. ft. of resin (a full Waste Concentrator Ion Exchanger).

6.1.2 Line up valves on 2T-13 per Attachment "B."

6.1.3 Ensure reactor makeup water pump is running; open CVC-81.

6.1.4 Line up Waste Concentrator Ion Exchanger to be transferred as follows:

2LRW-7A (B) Inlet Closed (Circle One) 2LRW-9A (B) Outlet Closed 2LRW-29A (B) Inlet Cross Conn. Open 2LRW-26A (B) Tank Vent to GCH Open 2DCH-138 Common Drain to DCH Closed

! 2GCH-33 Common Vent To GCH Open 2SZ-29A (B) Drain to 2T-13 Closed 2CVC-74 Spent Resin Flush from RMWP Closed 2LRW-28A (B) Tank Outlet Cross Conn. Open 6.1.5 Open 2RT-1 Resin Sluice Header to Waste Concen-trator Ion Exchangers and open 2SA-86 service air to Resin Sluice Header. Fluff tank for 15 minutes then shut 2SA-86 and 2GCH-33.

PLANT M ANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 3 of 13 I ARKANSAS NUCLEAR ONE aevision i CHANGE o^rE DATE 10/22/81 Date Initials 6.1.6 Open 2SZ-29A (B) (circle one) 2T-76A (B) Outlet

. to 2T-13 and Open 2CVC-98 to provide 50 gpm flow to Resin Sluice Header. Transfer Resin for 15 minutes.

NOTE If at the end of 15 minutes Resin has not been transferred as indicated by radiation level on transfer line decreasing, shut 2CVC-98 and 2SZ-29A (B) and Repeat Steps 6.1.5 and 6.1.6.

6.1.7 If Resin has been transferred secure the system as follows:

Close 2CVC-98 Close 2RT-1 Close 2SZ-29A (B) (circle one) 6.1.8 Flush Resin Transfer Line by opening 2CVC-74 from 2P-109 Reactor Makeup Water Pump until radiation levels on transfer lines indicate flushing is adequate then shut 2CVC-74.

6.1.9 Return Reactor Makeup Water System to normal line up per OP 2104.11.

6.1.10 Close 2SZ-4, 2T-13 Inlet from Resin Transfer l

[

Close 2SZ-10, 2T-13 Outlet to D.C.H.

6.1.11 Return Waste Condensate Ion Exchanger to normal line up per OP 2104.18 or fill with resin per OP 2104.19.

1 1

I l

l 1

i PLANT MANUAL SECTION: PROCEDURElWORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPFRATTNC SPENT RESTN TRANSFER 2104.17 PAGE 4 of 13 ARKANSAS NUCLEAR ONE aevisiON 1 CHANGE DATE DATE 10/22/81 Date Initials 6.2 To transfer resin from CVCS Ion Exchanger 2T-36 A&B and 2T-70 to Spent Resin lank 2T-13.

6.2.1 Ensure adequate space in 2T-13 for resin transfer.

The resin level is determined by opening vent to gas collection header 2SZ-42 and 2SZ-20 and draining to drain collection header via 2SZ-10 until level in 2T-13 no longer drops as indicated on 2C-ll4A.

NOTE 13.5% change in resin level in 2T-13 corres-ponds to 36 cu. ft. of resin (a full CVCS Ion Exchanger).

6.2.2 Line up valves on 2T-13 per Attachment "B" of 2104.17.

6.2.3 Ensure a reactor makeup water pump is running; open 2CVC-81.

6.2.4 Line up CVCS Ion Exchanger to be transferred as follows:

2CVC-8A (B,C) Inlet Shut (circle one) 2CVC-12A (B,C) Outlet Shut "

2CVC-119 2T36A-2T36B Series X-connect valve 2SZ-28A (B,C) Drain to 2T-13 Shut "

2CVC-1016 (Boronometer drain line) Shut 2CVC-1072 (1074, 1076) Outlet Line Vent Shut "

2CVC-1018 (1020, 1022) Outlet Line Drain Shut "

2GCH-llA (B,C) Tank Vent to GCH & DCH Open "

2GCH-14 Sluice Line Vent to GCH Shut 2GCH-12 Common Vent to GCH & DCH Open

! 2DCH-12 Common Vent to DCH Shut 2DCH-137 2T14 (Inlet Sample Line Drain) Shut 2GCH-13 Common Vent to GCH Open 2GCH-9A (B, C) Inlet Line Vent to GCH Shut (circle one) 6.2.5 Open 2DCH-ll, resin sluice header drain and drain for approximately 5 minutes.

6.2.6 Shut 2DCH-11, resin sluice header drain.

Open 2RT-8, resin sluice header to CVCS ion Exch.

Open 2RT-9, resin sluice header to CVCS ion Exch.

w PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 5 of 13 ARKANSAS NUCLEAR ONE aEvisiON t CHANGE oATE DATE 10/22/81 Date Initials Open 2SA-86, service air to resin sluice header,

~

Fluff tank for 15 minutes then shut 2SA-86 and 2GCH-13.

6.2.7 Open 2SZ-28A (B,C) (circle one) 2T-36A (B, 2T-70)

(circle one) Outlet to 2T-13 and open 2CVC-98 to provide 50 gpm flow to Resin Sluice Header. Trans-fer Resin for 15 minutes.

NOTE If at the end of 15 minutes resin has not been transferred as indicated by radiation level on transfer line decreasing, shut 2CVC-98 and 2SZ-28A (B,C) and Repeat Steps 6.2.5 and 6.2.6.

6.2.8 If Resin has been transferred, secure the system as follows:

( Shut 2CVC-98 Shut 2RT-8 Shut 2SZ-28A (B,C) (circle one) l l

6.2.9 Flush Resia Transfer Line by opening 2CVC-75 from 2P-109 Reactor Makeup Water Pump until radiation levels on transfer lines indicate flushing is ade-  !

quate, then shut 2CVC-75.

6.2.10 Return Reactor Makeup Water System to normal line up per OP 2104.11.

6.2.11 Shut 2SZ-4, 2T-13 Inlet from Resin Transfer Shut 2SZ-10, 2T-13 Outlet to D.C.H.  !

6.2.12 Return CVCS Ion Exchanger to normal line up per OP 2104.18 or fill with Resin per OP 2104.19.

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 6 of 13 ARKANSAS NUCLEAR ONE aEvisi= 1 CHANGE DuE DATE 10/22/81 Date Initials 6.3 To transfer Resin from Fuel Pool Ion Exchanger 2T-5 to Spent

, Resin Tank 2T-13.

6.3.1 Ensure adequate space in 2T-13 for resin transfer.

The resin level is determined by opening vent to gas collection header via 2SZ-10 until level in 2T-13 no longer drops as indicated on 2C-114A.

NOTE 13.5% change in Resin Level in 2T-13 corres-ponds to 36 cu. ft. of Resin (a full Fuel Pool Ion Exchanger).

6.3.2 Line up valves on 2T-13 per Attachment "B" of 2104.17.

6.3.3 Ensure reactor makeup water pump is running; open 2CVC-81.

6.3.4 Line up Fuel Pool Ion Exchanger to be transferred as follows:

2FP-13 Inlet Shut 2FP-1012 Inlet Line Vent Shut 2FP-15 Outlet Open 2FP-1018 Resin Sluice Line Drain Shut 2SZ-27 Outlet to Spent Resin Tank Shut 2SZ-74 Resin Line Flush from P-109 Shut l

1 2DCH-47 2T-5 to DCH Shut 2GCH-36 2T-5 Vent to GCH Open 2RT-13 Resin Sluice Header to 2T-3 Shut 2DCH-49 Ion Ex. Drain Open 6.2.5 Drain Ion Exchanger for approx. 5 minutes l 6.3.6 Shut 2DCH-49 Ion Exchanger Drain 6.3.7 Shut 2FP-15 outlet 6.3.8 Open 2RT-13 Resin Sluice Water Inlet l

6.3.9 Open 2RT-12 Resin Sluice Header to Fuel Pool Ion l

Exchangers and open 2SA-86 Service Air to Resin Sluice Header Fluff tank for 15 minutes then shut 2SA-86 and 2GCH-36.

PLANT M ANUAL SECTION: PROCEDURF/ WORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 7 of 13 ARKANSAS NUCLEAR ONE aevisioN i CHANGE aATE DATE 1o/22/81 Date Initials 6.3.10 Open 2SZ-27, 2T-5 Outlet to 2T-13 and open ,

2CVC-98 to provide 50 gpm flow to Resin Sluice Header. Transfer Resin for 15 minutes.

NOTE If at the end of 15 minutes Resin has not been transferred as indicated by radiation level on transfer line decreasing, shut 2CVC-98 and 2SZ-27 and repeat Steps 6.3.5 and 6.3.6.

6.3.11 If Resin has been transferred, secure the system as follows:

Shut 2CVC-98 Shut 2RT-12 Shut 2SZ-27 6.3.12 Flush Resin Transfer Line by opening 2CVC-74 from

( 2P-109 Reactor Makeup tiater Pump until radiation levels on transfer lines indicate flushing is adequate then Shut 2CVC-74.

6.3.13 Return Reactor Makeup Water System to normal line up per OP 2104.11.

6.3.14 Shut 2SZ-4, 2T-13 Inlet from Resin Transfer Shut 2SZ-10, 2T-13 Outlet to DCH 6.3.15 Return Fuel Pool Ion Exchanger to normal lineup per OP 2104.06 or fill with resin per OP 2104.19.

PLANT M ANUAt SECTION: PROCEDUREMORK PLAN TITLE: NO:

AUXILIARY SYSTEM OPERATING SPENT RESIN TRANSFER 2104.17 PAGE 8 of 13

< ARKANSAS NUCLEAR ONE aevisiON i CHANGE DATE DATE 10/22/dl Date Initials 6.4 To transfer Resin from Preconcentrator Ion Exchangers T-15 A&B to Spent Resin Tank 2T-13. l

~

6.4.1 Ensure adequate space in 2T-13 for resin transfer.

The resin level is determined by opening vent to gas collection header 2SZ-42 and 2SZ-20 and draining to drain collectica header via 25Z-10 until level in 2T-13 no longer drops as indicated on 2C-114A.

NOTE 12% change in resin level in 2T-13 corresponds to 32 cu. ft. of resin (a full Preconcentrator Ion Exchanger).

6.4.2 Line up valves on 2T-13 per Attachment "B" of OP 2104.17.

6.4.3 Lin'e up valves for sluice water per Attachment "A" of 2104.17 and start 2P-48 Holdup Tank Recire. Pump, or ensure RMW pump is running and open 2CVC-81.

6.4.4 Line up Preconcentrator Ion Exchanger to be trans-( ferred as follows:

2BM-21A (B) Inlet (circle one) Shut 2BM-23A (B) Outlet Shut 2BM-57A (B) Outlet Cross Conn. " Shut 2BM-54A (B) Outlet to DCH & GCH " Open 2DCH-137 Common Outlet to DCH Shut l 2GCH-30 Common Outlet to GCH Open 2GCH-39 GCH Drain to DCH Shut 2SE-30A (B) Outlet to Resin Transfer Shut Outlet to Resin Header (circle one) 2BM-55A (B) Inlet from Resin Sluice Header (circle one) Open 2CVC-74 P-109 Flushing to Resin Trans. Shut 6.4.5 Open 2DCH-71 for approx. 5 minutes then shut 2DCH-71. .

( 6.4.6 Open 2RT-5 Resin Sluice Header to Preconcentrator Ion Exchangers.

Open 2SA-86 Service Air to Resin Sluice Header.

Fluff tank for 15 minutes then shut 2SA-86 and 2BM-54A (B) (circle one)

PLANT MANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO AUXILIARY SYSTEM OpFRATTNG SPENT RESIN TRANSFE1 2104.17 PAGE 9 of 13 ARKANSAS NUCLEAR ONE aEvisioN 1 CHANGE oATE DATE 10/22/81 Date Initials 6.4.7 Open 2SZ-30A (B), (circle one) 2T-15A (B) (circle one)  ;

Outlet to 2T-13 and open 2BM-99 Holdup Tank Recire.

Pump discharge to Resin Sluice Header; Reactor makeup water may be used for transfer by opening 2CV-98 to provide 50 gpm flow to the resin sluice header.

Transfer Resin for 15 minutes.

NOTE If at the end of 15 minutes resin has not been transferred as indicated radiation level on transfer line decreasing, Shut 2BM-99 (2CVC-98, if opened) and 2SZ-30A (B) and repeat Steps 6.4.5 and 6.4.6.

6.4.8 If Resin has been transferred, secure the system as follows:

Shut 2BM-99 (2CVC-98 if used)

Shut 2RT-5 i Shut 2SZ-30A (B) (circle one) 6.4.9 Flush Resin Transfer Line by opening 2CVC-74 from 2P-109 Reactor Makeup Water Pump until radiation levels on transfer lines indicate flushing is adequate, then Shut 2CVC-74.

6.4.10 Return Boron Management System (2T-12 and 2P-48) to normal line up per OP 2104.20 and RMW system to normal alighment per OP 2104.11.

l 6.4.11 Shut 2SZ-4, 2T-13 Inlet from Resin Transfer 1

Shut 2SZ-10, 2T-13 Outlet to DCH l

6.4.12 Return Boron Management System 2T-15 A&B to normal line up per OP 2104.20 or fill with resin per OP 2104.19.

i I

l

PLANT M ANUAt SECTION: PROCEDURE / WORK PLAN TITLE: l NO.

AUXILIARY SYSTEM nPFRATTMC RPENT RERTM TRANSFER l 2104.17 PAGE 10 of 13

/ ARKANSAS NUCLEAR ONE TEvisioN 1 CHANGE oATE DATE 10/22/81 Date Initials 6.5 To transfer Resin from Boric Acid Condensate Ion Exchangers

. 2T-72 A&B to Spent Resin Tank 2T-13.

6.5.1 Ensure adequate space in 2T-13 for resin transfer.

The resin level is determined by opening vent to gas collection header 2SZ-42 and 2SZ-20 and draining to drain collection header via 2SZ-10 until level in 2T-13 no longer drops as indicated on 2C-114A.

NOTE 12% change in Resin Level in 2T-13 corresponds to 32 cu. f t. of Resin (a full Boric Acid Con-densate Ion Exchanger).

6.5.2 Line up valves on 2T-13 per Attachment "B" of OP 2104.17.

6.5.3 Ensure a reactor makeup water pump is running; open 2CVC-81.

6.5.4 Line up Boric Acid Condensate Ion Exchanger to be transferred as follows:

2BM-28A (B) Inlet (circle one) Shut 2BM-30A (B) Outlet Shut 2GCH-32 Common Line to GCH Open 2BM-77A (B) Inlet Cross Conn.(circle one) Shut 2BM-78A (B) Resin Sluice Header Open Inlet (circle one) 2DCH-73 Resin Sluice Header Shut Drain to DCH 2DCH-72A (B) Tank Vent to GCH (circle one) Open 2SZ-37A (B) Resin Outlet to 2T-13 Shut (circle one) 6.5.5 Open 2DCH-73 for approx. 5 minutes to allow 2T-72A (B) to drain then shut 2DCH-73.

6.5.6 Open 2RT-3 Resin Sluice Header to Boric Acid Condensate Ion Exchangers.

PLANT MANUAL SECT 80N: PROCEDURE / WORK PLAN TITLE. NO:

AUXILIARY SYSTEM nDFDATTMC RDFMT DFRTM TRAMRFF1 9104.17

' PAGE 11 of 13 ARKANSAS NUCLEAR ONE aEvisioN i CHANGE DATE DATE io/22/81 Date Initials Open 2SA-86 Service Air to Resin Sluice Header. 1 Fluff tank for 15 minutes then shut 2SA-86 and 2DCH-72A (B) (circle one) 6.5.7 Open 2SZ-37A (B), (circle one) 2T-72A (B) (circle one) Outlet to 2T-13 and open 2CVC-98 to provide 50 gpm flow to Resin Sluice Header. Transfer Resia for 15 minutes.

NOTE If at the end of 15 minutes resin has not been transferred as indicated by radiation level on transfer line decreasing, Shut 2CVC-98 and 2SZ-37A (B) and repeat Steps 6.5.5 and 6.5.6.

6.5.8 If resin has been transferred, secure the system as follows:

g Shut 2CVC-98 Shut 2RT-3 Shut 2SZ-37A (B) (circle one) 6.5.9 Flush Resin Transfer Line by opening 2CVC-74 from 2P-109 Reactor Makeup Water Pump until radiation levels on transfer lines indicate flushing is adequate, then Shut 2CVC-74.

6.5.10 Return Reactor Makeup Water System to normal line up per OP 2104.11.

6.5.11 Shut 2SZ-4, 2T-13 Inlet from Resin Transfer.

Shut 2SZ-10, 2T-13 Outlet to DCH.

6.5.12 Return Boron Management System (2T-72A & B) to normal line up per OP 2104.18 or fill with Resin per OP 2104.19.

PLANT M ANUAL SECTION: PROCEDURE / WORK PLAN TITLE: NO:

AUXILIARY SYSTEM nPFRATTMC SPENT RESTM TRAM 9FFR 2104.17 PAGE 12 of 13

( ARKANSAS NUCLEAR ONE Revision i CHANGE oATE 10/22781 DATE OP 2104.17 Page 1 of 1 ATTACIDfENT A VALVE NUMBER OPEN CLOSED DESCRIPTION 2BM-13C X 2P-48 Suction 2BM-15C X 2P-48 Discharee 2BM-44 X Hold Up Tank Pumps Cross Conn.

2BM-49A X 2P-48 Discharge to Floor Drain 2BM-18 X 2P-48 Discharee to 2F-15A 2BM-19A X 2F-15A Inlet 2BM-48A X 2F-15A Bypass 2BM-20A X 2F-15A Dir. charge I

2BM-51 X 2F-15B Disch. to Recire.

2BM-52A X 2F-15A to Floor Drain 2BM-21A X 2T-15A Inlet 2BM-53A X 2T-15A Inlet 2BM-53A X 2T-15A Inlet 2BM-16 Th rottled 2P-48 Recire. to 2T-12 2BM-17A (B,C,D) X 2T-12A (B, C, D) Recire. Inlet 2BM-39A (B,C,D) X 2T-12A (B, C, D) Vent to GCH 2BM-12A (B,C,D) X 2T-12A (B, C, D) Outlet to 2P-48 2BM-llA (B,C,D) X 2T-12A (B, C, D) Outlet to 2P-49A or B 2 ABS-12A (B,C,D ) X 2T-12A (B, C, D) Outlet to Aux. Bldg. Sump

Pggglgg: PROCEDOREMOPK PLAN TITLE: NO:

OPERATING SPENT RESIN TRANSFER 2104.17 PAGE AJ Oi iJ ARKANSAS NUCLEAR ONE a==oN i DATE io/22iel CHANGE l'U-1 DATE JO/40/04 OP 2104.17 Page 1 of 1 ATTACHMENT B VALVE NUMBER OPEN CLOSED DESCRIPTION 2SZ-9 X Sluice Header Inlet to 2T-13 l 2SZ-1 X 2T-13 Outlet to 2P-ll5A 2SZ-3 X '2T-13 Recirc. Inlet 2SZ-10 X 2T-13 Outlet to Drain Collection Header 2SZ-4 X 2T-13 Inlet from Resin Sluice Header 2SZ-42 X 2T-13 Vent to GCH 2SZ-4213 _

X 2PT-4213 Isolation 2SZ-20 X 2T-13 & L'ner i Vent Common Isolation to GCH 2S5-21 X 2T-13 to Gas Analyzer 2SZ-56 X Resin Flushline Drain Valve 0

O e

1 1

O

  • _.