ML20072G984

From kanterella
Jump to navigation Jump to search
Provides Status of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to RCS & NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification Requirements at Braidwood & Byron Station
ML20072G984
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 08/18/1994
From: Saccomando D
COMMONWEALTH EDISON CO.
To: Russell W
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
IEB-88-008, IEB-88-011, IEB-88-11, IEB-88-8, NUDOCS 9408250170
Download: ML20072G984 (2)


Text

Commonwealth Edison

~~

O 1400 Opus Place O

Downers Grove, Illinois 60515 August 18,1994 William T. Russell, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

NRC Bulletin 88-08 and NRC Bulletin 88-11 Status at Braidwood and Byron Stations Byron Station Units 1 and 2 (NPF-37/G6; NRC Docket Nos. 50-454/455)

Braidwood Station Units 1 and 2 1

(NPF-72/77; NRC Docket Nos. 50-456/457)

Dear Mr. Russell,

This correspondence provides tl e status of NRC Bulletin 88-08, " Thermal Stresses in Piping Connected to Reactor Coolant System" and NRC Bulletin 88-11,

" Pressurizer Surge Line Thermal Stratification" requirements at Braidwood and Byron Station. The following provides a summary of the status:

NRC Bulletin 88-08 NRC Bulletin 88-11 Braidwood 1 Completed 5/1/94; Completed 11/2/92; closed During A1R04 Outage by letter dated 3/9/93 Braidwood 2 Completed 4/5/93; Completed 4/28/93; During A2R03 Outage During A2R03 Outage Byron 1 Completed 4/15/93; Completed 4/15/93; During BIR05 Outage During B1R05 Outage Byron 2 Completed 10/25/93; Completed 10/21/93; During B2R04 Outage During B2R04 Outage k:nla\\byion\\bul88-08\\1 9408250170 94o9gg

-g /[

{DR ADOCK 05000454

//g>

eda

d; 9

Mr. Russell August 18,1994 If you have any questions concerning this matter please address them to this office.

Sincerely, r,

w'du Denise M.

comando Nuclear Licensing Administrator cc:

R. Assa, Braidwood Projects Manager-NRR G. Dick, Byron Projects Manager-NRR S. Dupont, Senior Resident Inspector-Braidwood II. Peterson, Senior Resident Inspector-Byron J. Martin, Regional Administrator-Region III Office of Nuclear Facility Safety-IDNS

)

k;nla\\tyronibulB6-OR\\2