ST-HL-AE-4860, Forwards STP Unit 2 Cycle 4 Startup Testing Summary Rept, Per TS 6.9.1.1.During Recent Cycle 3 to Cycle 4 Refueling outage,56 Feed Fuel Assemblies W/Integral Fuel Burnable Absorbers Installed

From kanterella
Jump to navigation Jump to search
Forwards STP Unit 2 Cycle 4 Startup Testing Summary Rept, Per TS 6.9.1.1.During Recent Cycle 3 to Cycle 4 Refueling outage,56 Feed Fuel Assemblies W/Integral Fuel Burnable Absorbers Installed
ML20072G789
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 08/17/1994
From: Cloninger T
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072G793 List:
References
ST-HL-AE-4860, NUDOCS 9408250097
Download: ML20072G789 (2)


Text

-

The Light company iIouston Lighting & Power ut esas rject eckic nerat &Station P. O. Box 289 Wadswonh, Texas 77483 August 17, 1994 ST-HL-AE-4860 File G02.06 10CFR50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Unit 2 Docket No. STN 50-499 Unit 2 Cycle 4 Startuo Testina Summary Report South Texas Project Technical Specification 6.9.1.1 requires a summary report of appropriate plant startup and power escalation testing following the installation of fuel that has a different design. South Texas Project, Unit 2, installed 56 feed fuel assemblies with Integral Fuel Burnable Absorbers (IFBA) during the recent Cycle 3 to Cycle 4 refueling outage. The IFBA burnable absorber is a design change, and a departure from standard discrete burnable absorber assemblies.

The attachment to this letter is a summary report of the test results taken during startup and power ascension. No corrective actions were required to obtain satisfactory operation.

If there are any questions, please contact Mr. D. A. Leaz .

at (512) 972-7795.

O T. H. oni r Vice es' ent Nucl ar ngine ring l

DNB/esh Attachment r+ <m : 1, g ,

9408250097 940817 PDR ADOCK 05000499 P PDR MISC-94\94-220,001 ljt i

Ho. Lighting & Power Company ST-HL-AE-4860 Soutu icras Project Electric Generating Station File No.: G02.06 Page 2 c:

Leonard J. Callan Rufus S. Scott Regional Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 Arlington, TX 76011 Houston, TX 77208 Lawrence E. Kokajko Institute of Nuclear Power Project Manager Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm. Bellport, NY 11713 P. O. Box 910 Bay City, TX 77404-910 Richard A. Ratliff Bureau of Radiation Control J. R. Newman, Esquire Texas Department of Health Newman, Bouknight & Edgar, P.C. 1100 West 49th Street STE 1000, 1615 L Street, N.W. Austin, TX 78756-3189 Washington, DC 20036 U. S. Nuclear Regulatory Comm.

K. J. Fiedler/M. T. Hardt Attn: Document Control Desk City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 San Antonio, TX 78296 J. C. Lar.ier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C.

Electric Utility Department 2300 N Street, N.W.

721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 G. E. Vaughn/C. A. Johnson Central Power and Light Company P. O. Box 2121 Corpus Christi, TX 78403 i

l i

I