Responds to IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators. No Check Valves Installed in Branch Connection Piping from Main Svc Water Headers to Diesel Generator Components
ML20072G999
Person / Time
Site: Robinson 
Issue date: 06/08/1983
From: Furr B
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-83-03, LAP-83-211, NUDOCS 8306290247
Download: ML20072G999 (1)


Text

-- __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _

USNRC REGION 3 h

ATL AN TA. GEORGIA Carolina Power & Light Company JUN 081983 83 Jl)N 13 Pll l l l

.y -

i Mr. James P. O'Reilly, Regional Administrator United States Nuclear Regulatory Commission Suite 2900 t

p,

'f' 101 Marietta Street, NW Atlanta, GA 30303 H. B. ROBINSON STEAM ELECTRIC PUNT, UNIT NO. 2 DOCTET NO. 50-261 - LICENSE NO. DPP-23 PEEPONSE TO IE'SULLETIN NO. 83-03 i

Dear Mr. O'Heilly:

Carolf na Powcr & Light Co::ipany has completed a re riew of the H. B.

Robinson Steam Electric Plant Unit No. 2 (HBR2) cooling water system in accordance with required action f of IE lulletin No. 83-03. Check Valve Failures in Raw Water Cooling Systems of Diesel Generators. The HBR2 servicej water system provides raw cooling water to the lube o12 cooler; ' Jacket water heat excharger, air cocler, ar.d the air start system air dryer rne each cf thi 1

diesel generators. The ] cooling water is provided via tranch ccnnectinne fros-the main service water henders which rsre operating during rornal plant

,- 4 conditions. There are no check valves installed in,tlie branch.: connectiori piping from the main eervlee water headers to the ' diesel generstop components-mentioned above, or from these components to tho' service water return header. Therefore, 'requiied actions '2 threugh 5 of IE Bulletin No.' 83-03 are not applicable based on the' die,sel generator cooling water system' design.

Carolina Power & ' Light Company has spent approximately ten man-hours reviewing the system and preparisg n-response'to this IE Bulletin. j.

['

[

^

If you have any, questions on this subject, please contact my staff.

l Your very truly, e

}

';^ '

.)

p/

B. J. Furr C

Vico President t

Nuclear Operations

+

ONH/pgp (69810NH)

/

j

/-

i -

cc:

Mr. J. P. O'Reilly (NRC-RII) g Mr. G. Requa (NRC) jp Mr. Steve Weise (NRC-HBR) l B. J. Furr, having been first duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.