Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072T828 + (09:16:27, 15 December 2024)
- ML20072T819 + (09:16:28, 15 December 2024)
- ML20072T820 + (09:16:28, 15 December 2024)
- 0CAN038336, Forwards Revised Pages 6.4 & 6.16 of 830322 Response to NRC 830321 Request for Addl Info Re Spent Fuel Storage Expansion + (09:16:29, 15 December 2024)
- ML20072T794 + (09:16:29, 15 December 2024)
- ML20072T793 + (09:16:31, 15 December 2024)
- ML20072T792 + (09:16:31, 15 December 2024)
- ST-HL-AE-3729, Forwards Response to NRC Questions Re Implementation of 10CFR50.63 on Loss of All Ac Power,Per 910212 Meeting W/Nrc. Facilities Currently Qualify as 8 H Coping Duration Plant + (09:16:32, 15 December 2024)
- ML20072T790 + (09:16:32, 15 December 2024)
- L-83-212, Amend to Final Deficiency Rept 82-017 Re Undersize Fillet Welds.Approx 5% of Welds Not Reinspected as Indicated in + (09:16:33, 15 December 2024)
- ML20072T773 + (09:16:33, 15 December 2024)
- ML20072T767 + (09:16:34, 15 December 2024)
- RBG-34-790, Forwards Revised TS 4.0.5,3.4.3.1 & 3.4.3.2 Re Unidentified Drywell Leakage Sump Flow Monitoring,Per Generic Ltr 88-01 & Discussions W/Nrc.Util Accepts Original Generic Ltr Guidance + (09:16:35, 15 December 2024)
- 05000366/LER-1991-006-02, :on 910317,main Control Room Environ Control Sys Automatically Transferred from Normal to Pressurizer Mode of Operation,Causing ESF Actuation.Caused by Personnel Error.Directive Will Be Issued + (09:16:36, 15 December 2024)
- W3P83-1015, Second Interim Rept on Significant Const Deficiency 68 Re Spurious ESF Actuation Sys.Corrective Action Delayed Due to Preoperational Testing of Plant Protection Sys.Status of Corrective Action Will Be Reported by 830531 + (09:16:37, 15 December 2024)
- ML20072T753 + (09:16:38, 15 December 2024)
- ML20072T754 + (09:16:38, 15 December 2024)
- ML20072T746 + (09:16:39, 15 December 2024)
- ML20072T742 + (09:16:40, 15 December 2024)
- ML20072T744 + (09:16:40, 15 December 2024)
- ML20072T740 + (09:16:41, 15 December 2024)
- RBG-14-705, Final Deficiency Rept DR-84 Re Linear Indication Found in Root Area of Fillet Weld for Lug on One Safety Relief Valve Quencher.Initially Reported on 821206.Indication Does Not Affect Weld.Condition Not Reportable Per 10CFR50.55e + (09:16:41, 15 December 2024)
- ML20072T735 + (09:16:42, 15 December 2024)
- 05000335/LER-1983-019-99, /99T-0:on 830322,during Inservice Insp,Rejectable Indication Noted in Results of Ultrasonic Tests of Steam Generator A.Cause Unknown.Nozzle safe-ends Being Replaced. Decision Re Future Repairs to Be Made at Later Date + (09:16:43, 15 December 2024)
- ML20072T726 + (09:16:45, 15 December 2024)
- ML20072T730 + (09:16:45, 15 December 2024)
- 05000335/LER-1983-019, Forwards LER 83-019/99T-0 + (09:16:46, 15 December 2024)
- ML20072T724 + (09:16:46, 15 December 2024)
- 0CAN048302, Forwards Addl Clarification Re Spent Fuel Pool Cooling Sys. Revised Pages 6 & 7 of Attachment to Util Encl + (09:16:47, 15 December 2024)
- ML20072T713 + (09:16:51, 15 December 2024)
- ML20072T719 + (09:16:51, 15 December 2024)
- ML20072T703 + (09:16:52, 15 December 2024)
- BECO-94-094, Provides Semiannual long-term Program Udate in Accordance W/ Section V.A of Plan for Long Term Program - Pilgrim Nuclear Power Plant, Reflecting Completion of GL 88-20,Suppl Item & Scheduled Revs for Physical Security Improvements + (09:16:53, 15 December 2024)
- ML20072T701 + (09:16:53, 15 December 2024)
- ML20072T697 + (09:16:54, 15 December 2024)
- ML20072T692 + (09:16:55, 15 December 2024)
- ML20072T695 + (09:16:55, 15 December 2024)
- ML20072T691 + (09:16:56, 15 December 2024)
- ML20072T683 + (09:16:57, 15 December 2024)
- ML20072T679 + (09:16:58, 15 December 2024)
- ML20072T674 + (09:16:59, 15 December 2024)
- ML20072T673 + (09:16:59, 15 December 2024)
- ML20072T668 + (09:17:00, 15 December 2024)
- ML20072T672 + (09:17:00, 15 December 2024)
- 05000335/LER-1983-013-03, /03L-0:on 830302,during Refueling Outage,Charging Sys Common Header Isolation Valve V2429 Tagged Closed to Facilitate Work on Seal Water Injection Sys to Reactor Coolant Pumps Resulting in Loss of Boration Flow Path + (09:17:02, 15 December 2024)
- ML20072T665 + (09:17:03, 15 December 2024)
- ML20072T662 + (09:17:03, 15 December 2024)
- ML20072T657 + (09:17:04, 15 December 2024)
- ML20072T649 + (09:17:05, 15 December 2024)
- RBG-34-747, Forwards Rev 1 to Sasr 91-16, Bounding Evaluation for River Bend 1 Heatup Rate Event. Describing 901130 Reactor Vessel Heatup of 119 F in 1 H Period + (09:17:05, 15 December 2024)
- 05000335/LER-1983-013, Forwards LER 83-013/03L-0 + (09:17:06, 15 December 2024)
- ML20072T644 + (09:17:06, 15 December 2024)