Interim Rept on Significant Const Deficiency 64 Re Safety Injection Tank Discharge Flow Rates.Ebasco Engineering Reviewing Plant Safety Analyses Performed by C-E.Final Rept Will Be Delayed Until 830427
ML20072T746
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/28/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0103, W3I83-103, NUDOCS 8304080316
Download: ML20072T746 (1)


Text

. _ _ _ _ _ _ _ _ _ _ _ _

LOUISIANA 142 OELARONDE STREET P O W E R & L s G H T[ P O. BOX 6008

  • NEW ORLEANS. LOUIStANA. (504) 366-234570174

$uS$sysYE March 28, 198 Voce Presklent Nucle r Ope a W3I83-0103 Q-3-A35.07.64 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 64

" Safety Injection Tanks, Discharge Flow Rates"

REFERENCE:

LP&L letter W3P82-3312 dated October 29, 1982, L. V. Maurin to John T. Collins

Dear Mr. Collins:

At the present time, Ebasco Engineering is reviewing the plant safety analyses performed by Combustion Engineering. A final report will, therefore, be delayed until April 27, 1983.

Very truly yours, v 'L7 nun L. V. Maurin LVM/ MAL:keh cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington,D. C. 20555

2) Director- 4) Mr. W. M. Stevenson.

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington,D. C. 20555 i

i d'GO4080316 830329 PDR ADOCK 05000382 S PDR

._.