ML20072T649

From kanterella
Jump to navigation Jump to search
Interim Significant Const Deficiency Rept 42 Re Hma Auxiliary Relays.Corrective Action Cannot Be Completed Due to Delay in Shipment of Required Matl.Final Rept Delayed Until 830527
ML20072T649
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/28/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0100, W3I83-100, NUDOCS 8304080258
Download: ML20072T649 (1)


Text

,

l 0UISiANA POWER & LIGHT 342 ouanONOc sin m P O. BOX 6008 NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 s

missac March 28, 1983 vee Presasent NucNr o$a$

W3I83-0100 Q-3-A35.07.42 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 -

Docket No. 50-382 Significant Construction Deficiency No. 42 1b-

"IIMA Auxiliary Relays"

REFERENCE:

LP&L letter W3I83-0049 from L. V. Maurin to John T. Collins, dated February 14, 1983

Dear Mr. Collins:

At the present time, the corrective action cannot be completed due to delay in shipment of the required materials. A final report will, therefore, be delayed until May 27, 1983.

Very truly yours, il&b L. V. Maurin LVM/ MAL:keh cc: 1) Director 3)* Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington,.D. C. 20555 F.304000258 830328 gDRADOCK05000g

,