ML20072T691
| ML20072T691 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/01/1994 |
| From: | Mccoy C GEORGIA POWER CO. |
| To: | Hoyle J NRC OFFICE OF THE SECRETARY (SECY) |
| References | |
| FRN-59FR37724, RULE-PR-51 59FR37724-00020, 59FR37724-20, NUDOCS 9409150320 | |
| Download: ML20072T691 (4) | |
Text
1 axo m-cms,,
n m.~ n cen,vn.m PROPOSED RULE rH 5 )
1()
^
% ove a < m DOCP.2T NUMBER nn a rw e %m e we i.- m m m
$9 F R 3 77.2Nfig.P n$
JQQ[h 0 !'OWCf f
C. K. McCoy
,gg, ~~
94 SEP 14 Jg,3 September 1, 1994 0FFh:
l)G U '.
i Docket Nos. 50-321 50-424 HL-4681 50-366 50-425 LCV-0462 John C. Hoyle, Acting Secretary U.S. Nuclear Regulatory Commission Oflice of Nuclear Reactor Regulation j
Washington D.C. 20555 ATTENTION: Docketing and Service Branch Comments on Environmental Review for Renewal of Operating Licenses; (59 Federal Register 37724 of July 25.1994)
Dear Mr. Hoyle:
Georgia Power Company has reviewed the proposed supplement (59 Federal Register 37724) to the proposed rule on environmental review for renewal of operating licenses.
In accordance with the request for comments, Georgia Power Company is in total agreement with the NEI comments that are to be provided to the NRC.
Should you have any questions, please advise.
j Respectfully submitted,
/
C. K. McCoy CKM/JMG 9409150320 940901 C/d PDR PR 2
S1 59FR37724 PDR
Georgia Power d U.S. Nuclear Regulatory Commission Page 2 cc: Georzia Power Company Air. J. T. Beckham, Jr., Vice President, Plant Hatch hir. J. B. Beasley, General hianager - Plant Vogtle hir. H. L. Sumner, Jr., General Afanager - Plant Hatch U. S. Nuclear Regulatory Commission. Washington. DC hir. K. N. Jabbour, Licensing Project hianager - Hatch hir. D. S. Hood, Licensing Project Afanager - Vogtle U. S. Nuclear Regulatory Commission. Region II hir. S. D. Ebneter, Regional Administrator hir. L. D. Wert, Senior Resident Inspector - Hatch hir. B. R. Bonser, Senior Resident Inspector - Vogtle HL-4681 LCV-0462 File G.05.01 l
l i
l
i GEORGIA POWER COMPANY HATCH AND V0GTLE JOINT NRC CORRESPONDENCE ROUTING AND INFORMATION j
NRC Due Date I
nre g im l
HL- $ g /
ELV-OW,2-bf 8. 694 Author Sig6ature'Due Date l
Do ket Nos d 24 h 25 gg,w
[1 66 Document Title / Subject EdditwtowY b5 krYf RW7s h1 Unh4 b <we Additidhal Keywbrds j
Source of Information t
$ S 8912
~
Responds to NRC Letter Dated Verbal Correspondence Dated 2Ci /W I
l Purpose /Comnfents
\\
&n a/asr Special Distribution Requirements (Blind Copies)
I REVIEW / CONCURRENCE As A
A.
Lice ng' r
.Date Project ngineer Date i
h
$b
]
/*
I e
r l @ "" P fas app p e)
Date
_I N s aDDlicable Date W/w
- W}o/W) %bw//Al
- 4%W Date kanager - REES Date
$_jensingServicJe
\\
_ 2 p - (fo f
I HATCH,PM JECT V0GTLE PROJECT I
Manager - Li. censing /Date Manager - NEL/Date l
General Manager /Date Vice President - Project /Date i
f Letter is to be signed by the last VP to review the corresoondece
(
m bii e., b kr &
l<A A w a -
w s u A n r,m k
li %bb i
0 0
GEORGIA PDWER COMPANY EATCH AND V0GTLE JOINT NRC CORRESPONDENCE ROUTING AND INFORMATION NRC Due Date 1
0EC ID 5 l
t l
HL- </(,g /
~ ELV-44,2.,
SM a.694 i
l yrc-Author Signature'Due Date l
Do ket Nos h 24 h 25 gg N1 66 l L Document Title / Subject ji. ggggg.- -
R W 75 fA $dJtfY&f W Y
(
s v
conh4 b ncs Additianal Keywords Source of Infortnation
& S 8W2 Responds to NRC Letter Dated l
Verbal Correspondence Dated 2C, /59 N Purpose / omdents
~
C
&&un afAlfr Special Distribution Requirements (Blind Copies)
REVIEW / CONCURRENCE f)
A?
Lice ng r
V
.Date Project gineer Date A /
W Of0lM b
8 <*'" P fas ap p e) ate L M s aaplic W e Date r
6
/. 0 Wwar [Jhk (WYhh S N'9f v
' Manage; {icensing Servide D te' I anager - REES Date 8 80 $ s
& fr z g ~p f
s g
HATCH PROJECT l
V0)TLE-PROJECT i
l Manager - Li. censing /Date l
(
Manager - NEL/Date l
m General Manager /Date -
l L
Vice President - Project /Date
~
Letter is to be signed by the VP to review the corresoondece
$1AM Abr:M dk8 Ah bY bdcr AAb?$ brn2lb.
r
/
r
-.