Fifth Interim Rept of Significant Const Deficiency 55 Re Incorrect Structural Calculations for Holdup & Boric Acid Makeup Tanks.Corrective Action to Boric Acid Sys Not Completed.Final Rept Delayed Until 830523
ML20072T672
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/28/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0101, W3I83-101, NUDOCS 8304080267
Download: ML20072T672 (1)


Text

__

LOUISIANA

/ 142 DRARONDE STRW P O W E F1 & L I 3 H T/ P o oox 0003. NEW ORLEANS. LOUISIANA 70174. (504) 366 2345

' $$h5N{}

L. V MAunIN March 28, 1983 Vee Presxlent Nuckar Operations W3I83-0101 Q-3-A35.07.55 Mr. Johr. T. Cdllins, Regional Administrator, Region IV U. S. Nuclear h"egulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 55

" Hold Up and Boric Acid Hake Up Tanks Incorrect Structural Calculations" Fifth Interim Report

REFERENCE:

f.P6L Ictter W3183-0057 from L. V. Maurin to J. T. Collins dated February 17, 1983

Dear Mr. Collins:

At the present time, corrective action to the boric acid system cannot be completed due to inaccessibility of the system because of hot functional testing. A final report will, therefore, be delayed until May 23, 1983.

Very truly yburs,'

Y U n n.;,

L. V. Mauria LVM/ MAL:keh cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nucicar Regulatory Commission Washington, D. C.

20555 8304080267 830328 PDR ADOCK 05000382 O

PDR