| Site: | Waterford |
| Issue date: | 03/28/1983 |
| From: | Maurin L LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, W3I83-0101, W3I83-101, NUDOCS 8304080267 | |
| Download: ML20072T672 (1) | |
Text
__
/ 142 DRARONDE STRW P O W E F1 & L I 3 H T/ P o oox 0003. NEW ORLEANS. LOUISIANA 70174. (504) 366 2345
' $$h5N{}
L. V MAunIN March 28, 1983 Vee Presxlent Nuckar Operations W3I83-0101 Q-3-A35.07.55 Mr. Johr. T. Cdllins, Regional Administrator, Region IV U. S. Nuclear h"egulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 55
" Hold Up and Boric Acid Hake Up Tanks Incorrect Structural Calculations" Fifth Interim Report
REFERENCE:
f.P6L Ictter W3183-0057 from L. V. Maurin to J. T. Collins dated February 17, 1983
Dear Mr. Collins:
At the present time, corrective action to the boric acid system cannot be completed due to inaccessibility of the system because of hot functional testing. A final report will, therefore, be delayed until May 23, 1983.
Very truly yburs,'
Y U n n.;,
L. V. Mauria LVM/ MAL:keh cc:
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nucicar Regulatory Commission Washington, D. C.
20555 8304080267 830328 PDR ADOCK 05000382 O