Monthly Operating Repts for Mar 1991 for McGuire Nuclear Station Units 1 & 2
ML20072T735
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1991
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20072T627 List:
References
NUDOCS 9104180238
Download: ML20072T735 (10)


Text

...

4 OPERAi!NG DATA REFDR1 DOCKET NO

$0-369 DATE kril 15, 1991 OPERATING STATUS COMPLETED BV R.A. Williass TELEPHONE 704 373-5907

1. Unit Naael McGuire 1
2. Feporting Periodt March 1,1991-March 31,1991
3. Li:ensed Tneraal Power (MWth 3411
4. Naseplate Rating (Bross MWeh 13056 Notes *Naseplate Rating
5. Design Electrical Rating (Net MWe):

1100 (6 toss Mie) calculated as

6. Maxieue Dependable Capacity (Bross MWeli 1171 1450.000MVA

.90 power

7. Maxieus Dependable Capacity (Net MWeh 1129 f actor per Fage lii,
8. If Changes Occur in Capacity Ratings (ltens Nusber 3 Through 7) Since Last N9RE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net MWeh
10. Reason For Restrictions, if any:

This Month Yr. to-Date Cuaulative

-11. Hours in Reporting Period 744,0 2160.0 81792.0

12. Nusber Of Hours Reactor Was Critical 744,0 2083.6 57749.6
13. Reactor Reserve Shutdown Hours

--0-- -

- 14. Hours Benerator On-line 744.0 2077.3 57097.3

15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Bross Thersal Energy 6enerated (MWH) 2521731 6860370 173095932
17. Gross Electrical Energy Benerated PWH) 681656 2394533 59616968 18.NetElectricalEnergyBeneratedIMWH) 051763 2304819 56993007 19.UnitServicefactor 100.0 96.2 69.8
20. Unit Availability Factor 100.0 96.2 69.8
21. Unit Capatity Factor (Using MDC Net) 101.4 94.5 60.2
22. Unit Capacity Factor (Using DER Netl 97.0 90.4 59.0
23. Unit Forced Outage Rate 0.0 3.8 12.6
24. Shutdown Scheduled Over Next 6 Morths (Type, Date, and Duration of Eachh Nnnn
25. If Shut Down At End Of Report Period. Esticated Late of Startup:
26. Units in Test Status (Prior to Coseercial Operationh Forecast Achieved INiilALCRITICAL!ly IN!!!ALELECTRICliY COMMERCIAL OPERA 110N 9104180238 910415 PDR ADOCK 05000369 R

PDR

l OFERATINB sAlf, REPORT DOCKE1 NO _ 50-369 LH!l McGuire 1 DATE April 15,1991 COMPLETED BY F. A, b'illlan TELEPHONE 704-373-59B7 MONTH March 1991 M1 AVERAGE CA!LY POWER LEVEL

[M AVERASE DAILY F0WER LEVEL (MWe-Net)

(Mwe-Net) 1 1147

[7 1147 2

1147 IB 1146 3

1146 19 1144 4

1144 20 1146 5

1145 21 1146 6

1149 22 1147 7

1167 23

!!46 8

1164 24 1147 9

ll44 25.

1143 10 1145 26 1143 11 1147 27

!)47 12 1140 28 1147 13 1146 29 1136 14 1145 30 1136 15 1145 31

!!36 16 1144

a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No.

50-369 UNIT NAME Mwu1HE 1 DATE v4/1d/91 REPORT MONTH March 1991 COMPLETED BY s.

w. muser TELEPHONE

( / v41 -> / J-> / t>z (4)

(5)

(1) 2)

E HOD T

A OF LICENSE CAUSE AND CORRECTIVE N

Y S

SHUT EVENT SYS-O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (3)

(4)

(1)

(2)

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data F Forced Reason-2-Manual Scram EntW Sheets For Licensee B-Maintenance or test 3-Automatic Scram (ING-Ol61) )

Event Report (LER C-Refueling 4-Other (Explain)

File D-Regulatoq Restriction E-Operator Training & License Examination (5)

F-Administrative Exhibit I - Same Source (Explain) (Explain)

G-Operator Error H-Other I

1

DOCKET NO:

50 369 UNIT:

McGuire 1 DATE:

4/15/91 NARRATIVE

SUMMARY

MONTH: March 1991 McGuire Unit 1 began the month of March operating at 100% full power.

The unit operated at 100% full power for the entire month, and ended the month operating at 100% full power.

Prepared by:

S. W. Moser Telephone:

704-373-5762

]

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown:

September 1991 3.

Scheduled restart following refueling: November 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

k 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and cota configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6, important licensing considerations (new or different design or supplier.

unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies-(a) in the core:

193 (b) in the spent fuel pool:

443 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:

April 15, 1991 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

0 9

DFERAllN6DATAREPORT DDCL[i ND,,,,, _50-370 DATE ptil 15. 1991 DPEEf*TINGSTATUS COMPLETEDBY R.A. Willi u s f(LIPHDNt. 7M 37F t,907

1. Unit N ue: McGuire 2
2. Reporting Feriods March 1, 1991 Natch 31, 1991
3. Littnud Thern) Poetr (MWtil 3411
6. Nueplate Rating (Oross MWell 1305i Notes skueplate Feling 5.DesignElectricalRating(NetMWe):

1100 (6tess MWe) calculated as 6.ManteusDependableCapacity(GrossMWelt lit!

1450.000 MVA

.90 pont

7. Mattete Dependable Capacity (Net MWe).

1129 factorperFageill, B. If Changes Occur in Capctly Ratings (iten Nuotier 3 through 7) $1nce Last NUR[6-0020.

Report. Give Realous 9.PowerLevelToWhichRestricted,ifAny(Netdelt 10.ReasonforRestrictions,Ifany l

l This Month Yr.*to4ste Cueulative

!!.HoursinReportingPeriod 744.0 2160.0 62080.0 I

12. Husber Of Hours Reactor Was Critical 744.0 2160.0 46900,1 13.ReactorReserveShutdownHours

~0 -

~0~

--0--

i Is. Hours Benerator On-Line 744.0 2160.0 45962.B

!$. Unit Reprn Shutdown Hours

~0~

' ~0--

~ 0--

16.GrossTherulEnergyGenerated(MWH1 2536062 7194935 149799726-

17. Gross Eltctrical Energ" Benerated (MWH) 891995 2531406 52460607

- 10. Net Electrical Energy 6enerated (MilHi 659698 2439995 50304441 l9 Unit Service factor.

100.0 100.0 74.0-

20. Unit Availability Factor-100.0 100.0 74.0
21. Unit Captity Factor (Using MDC Net) 102.4 100.1 70.6
22. Unit Capacity Factor (Using Dr.R Net!

97.9 95.7' 68.7 y'

23.UnitForcedDotateRate_

0.0 0.0 i, 7

24. Shutdeen Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut town At End Of Report Period. Estinated Date of Startup

.i

26. Units in.iest Status (Prior to tenercial Operation):

Forecast Achievec lhlilALCRITICALITY INITIAL.ELECTRICliY

. COMMERCIAL OPERA 110N-

1 0F(RAi!NGDATARfPORT j

DOCIE1NO 50470 VNil McGuire 2 tATEAtrli 15. 1991 COMPLlif0BY - F.A. Willi 49.1 i

TEttPHONC 704-37F5007 D TH,,,, %rch 1991 i

LA1 AVCAAB[ DAILY t0WER L(VEL -

[11 AvfLAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net)

I 1151 17 flg 2

1162 IB 11, 3 116P 19 1159 4 1160 20 1161 5 1159 21 1155 6 1160 22 1153 7 !!60 23 Il52 0 1152-24 1159 9 1128 25 1166 10' !!50 26 1154 1159 27 1158 12' 1160-28 1156 . 13 1160 . 29 1156 14 1159 30 154 15 - 1150 31 1142 '16 1156 4 j =w e-m-- -,ew e,y,-_p-ww

  1. ---+=

D-w,+ &-e.. , mm e - m y-m 1- + --T

  • W

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME MLbu1Kr. 2 DATE v4/13/ 91 REPORT MONTH March 1991 COMPLETED BY s. w. Must,x TELEPHONE t / v41 .s /.5-d / bz (1) 2) (4) (5) E HOD T A OF LICENSE N Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE .NO SHUTDOWNS OR REDUCTION S i 'l r t I t f r l 1 (1) (2) (3) (4) I ' F Forced Reason-Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data 1 B-Maintenance or test 2-Manual. Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re G-Ol61)) rt (LER D-Regulatory R9striction 4-Other (Explain) File (NL E-Operator Training & License Examination F-Administrative (5) G-Operator Error (Explain) Exhibit I - Same Source H-Or.her (Explain) i i 1 I ? l t

) J DOCKET NO: 50 370 UNIT: McGuire 2 DATE: 4/15/91 NARRATIVE

SUMMARY

MONTil: March 1991 McGuire Unit 2 began the month of March operating at approximately 974-a- power for reactor protection system testing, The unit began a power increase at 0415 on 03/01, and reached 1006 full power at 0622 on 03/01. The unit operated at or near 100% full power for the remainder of the month. l-Prepared by: S. V. Moser Telephone: 704 373 5762

9 9 MONTHLY REFUELING INFORMATION REQUEST 1. Facility name: McGuire Unit 2 2. Scheduled next refueling shutdown: January 1992 3. Scheduled restart following refueling: March 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. 4. Will refueling or resumpt;on of operation thereafter require a technical specification change or other license amendment? If yes, what will these be? If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unrevieweo safety questions? 5. Scheduled date(s) for submitting proposed licensing action and supporting information: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes.in design or new operating procedures). 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 589

8.. Present licensed fuel pool capacity:

1463_ Size of requested or planned increase: 9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 L 1 l DUKE POWER COMPANY DATE: April 15, 1991 4 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 ..}}