Text
{{#Wiki_filter:,.., Omaha Public Power District 1623 HARNEY 8 OMAHA. NEBRASKA 68102 e TELEPHONE S36-4000 AREA CODE 402 March 10, 1983 LIC-83-065 -+ E Mr. W. C. Seidle, Chief ] t{' Reactor Project Branch 2 n U. S. Nuclear Regulatory Commission g g} % I) Region IV [ 611 Ryan Plaza Drive, Suite 1000 1[ [h -{flEs h bJ .m n s Arlington, Texas 76011 i
Reference:
Dockit No. 50-285
Dear Mr. Seidle:
IE Inspection Report 83-01 The subject Inspection Report, dated February 11, 1983, identified one violation regarding the apparent failure to follow written procedures by not recording a jumper in the jumper log at Fort Calhoun Station. The Omaha Public Power District's response to the subject violation is attached. Sincerely, W. C' Jones Division Manager Prodpction Operations WCJ/TLP:jmm Attachment cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W. Washington, D.C. 20036 Mr. L. A. Yandell, NRC Senior Resident Inspector 1 8304080315 830401 PDR ADOCK 05000285 C PDR w
o ' I. ;i s. OMAllA PUBLIC POWER DISTRICT'S RESPONSE TO IE INSPECTION REPORT 8 3-01 Violation Failure to Follow Procedures Technical Specification 5.8.1 requires that " written pro-cedures . be established, implemented, and maintained that meet or exceed the mininum requirements of Sectionn 5.1 and 5.3 of ANSI N18.7-1972, and Appendix A of USNRC Regulatory Guide 1.33. f Standing Order G-7 establishes the Operating Manual and states in Section 1.3 that " adherence to (the) Operating Manual is mandatory." Contrary to the above, the licensee failed to enter tempo-rary jumpers (wire llCV-1749 and V6 to VIAS) into-the jumper log as required by Step P.l.a(18) of Surveillance Procedure ST-CONT-7, " Type 'A' Test (Containment)."
Response
1. Corrective steps which have been taken and the results achieved. Verification that the jumpers were, in. fact,-removed from the circuit in question was made on January 5, 1983, when the incident was discovered. All personnel involved in this incident have been reinstructed on the use of jumpers at.the Fort Calhoun Station. The reinstruction of theseJpersonnel should reduce the probability for recurrence of this in-cident. 2. Corrective steps which will be taken to avoid'further violations. t In addition to retraining indiviivals involved with jumpers i installation, the District is . citing Standing Order O-25' which governs the - use of elet r :a1 jumpers and blocks. The s new procedure.will includ 2 e and documentation of jumpers used in the perfo n 4 f' surveillance _testn. With-the revision of Standing ecder a-25, the increased require-e ments will preclude further violations. The completion ~of e-this item.is scheduled for June,;1983 due to the necessity to train all personnel that' work at the Port Calhoun 'L Station. ' t' 13. Date when full compliance will be achieved. ~ The District'is1 presently-in' full compliance with respect to: . control of temporary. jumpers referenced ' in ST-CONT-7,JStep ' s P.l.a(18)'. y, .t.. ,j}}