Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086G002 + (07:12:59, 14 December 2024)
- ML20086G006 + (07:12:59, 14 December 2024)
- ML20086F999 + (07:13:00, 14 December 2024)
- ML20086F997 + (07:13:01, 14 December 2024)
- ML20086F995 + (07:13:01, 14 December 2024)
- ML20086F993 + (07:13:02, 14 December 2024)
- ML20086F990 + (07:13:02, 14 December 2024)
- ML20086F989 + (07:13:03, 14 December 2024)
- 3F1191-11, Forwards Comments on AEOD Special Rept, Experience W/Pump Seals Installed in Reactor Coolant Pumps Mfg by Byron Jackson. Disagrees W/Nrc Definition of Seal Failure + (07:13:04, 14 December 2024)
- ML20086F986 + (07:13:04, 14 December 2024)
- ML20086F981 + (07:13:05, 14 December 2024)
- ML20086F979 + (07:13:05, 14 December 2024)
- ML20086F976 + (07:13:06, 14 December 2024)
- ML20086F974 + (07:13:07, 14 December 2024)
- ST-HL-AE-5122, Forwards ISI Summary Rept for South Tx Project Unit 1 Fifth Refueling Outage Re Welds,Sg Tubing & Component Supports + (07:13:07, 14 December 2024)
- ML20086F970 + (07:13:08, 14 December 2024)
- ML20086F966 + (07:13:08, 14 December 2024)
- ML20086F958 + (07:13:09, 14 December 2024)
- ML20086F952 + (07:13:09, 14 December 2024)
- 05000325/LER-1991-027, :on 911105,hydraulic Control Unit 34-19 Declared Inoperable When CRD Accumulator Low Pressure/High Level Alarm Received.Caused by Decrease in Reactor Temp. Accumulators Recharged & TS Change Underway + (07:13:11, 14 December 2024)
- ML20086F949 + (07:13:12, 14 December 2024)
- ML20086F944 + (07:13:13, 14 December 2024)
- ML20086F938 + (07:13:17, 14 December 2024)
- 05000321/LER-1991-025, :on 911024,determined Tech Spec Surveillance Program Did Not Include Testing of Automatic Safety Function of Mcrecs Isolation Damper 1Z41-FO18B.Caused by Inadequate procedures.W/911122 1tr + (07:13:18, 14 December 2024)
- ML20086F933 + (07:13:19, 14 December 2024)
- ML20086F929 + (07:13:20, 14 December 2024)
- ML20086F923 + (07:13:21, 14 December 2024)
- ML20086F918 + (07:13:21, 14 December 2024)
- ML20086F906 + (07:13:22, 14 December 2024)
- ML20086F911 + (07:13:22, 14 December 2024)
- ML20086F902 + (07:13:23, 14 December 2024)
- ML20086F893 + (07:13:24, 14 December 2024)
- ML20086F896 + (07:13:24, 14 December 2024)
- ML20086F885 + (07:13:25, 14 December 2024)
- ML20086F890 + (07:13:25, 14 December 2024)
- 05000369/LER-1991-016-01, :on 911024,discovered That 11 Fuel Assemblies Stored in Spent Fuel Pool from 900323 to 911023.Caused by Defective Procedure.Fuel Assemblies Immediately Moved to Positions to Establish Required Vacant Row + (07:13:27, 14 December 2024)
- NRC-91-0153, Submits Summary Progress Rept Re Third Individual Plant Exam Milestone.Activity Required for Third Milestone Re Containment Evaluation Completed.Final Quantification Awaits Completion of Final Model Enhancements + (07:13:28, 14 December 2024)
- ML20086F880 + (07:13:29, 14 December 2024)
- 05000266/LER-1991-012, :on 910924,turbine Runback Experienced from 100% to 80% Power During Maint on Inverter Dyod,Resulting in Voltage Spike on Dc Supply Bus to Inverter.Caused by Blown Fuse.Maint Work Request Issued + (07:13:30, 14 December 2024)
- 0CAN119108, Confirms Assumptions in NRC Transmitting Supplemental Safety Evaluation Re Util Revised Response to Station Blackout Rule.Alternate Ac Power Source Will Be Capable of Supplying Loss of Offsite Power Loads to Buses + (07:13:34, 14 December 2024)
- 05000289/LER-1991-005-02, :on 911101,in Process of Bypassing Train a, Operator Depressed Incorrect Pushbutton,Causing ESAS Actuation of Channel A.Caused by Personnel Error.Operator Counseled & Plant Incident Rept Written + (07:13:36, 14 December 2024)
- ML20086F874 + (07:13:37, 14 December 2024)
- ML20086F871 + (07:13:38, 14 December 2024)
- 0CAN119107, Forwards Comments on AEOD Special Rept, Experience W/Pump Seals Installed in Reactor Coolant Pumps Mfg by Byron Jackson & Responses to Questions Re Proposed Resolution of GSI 23.W/o Comments on Resolution of GSI 23 + (07:13:39, 14 December 2024)
- ST-HL-AE-3937, Special Rept:On 911030,fuel Oil Leak Occurred at Cylinder 5R on High Pressure Fuel Oil Supply Line Connection to Fuel Oil Injector.Evaluation Underway to Determine Cause. Injector & Fuel Oil Line Replaced + (07:13:39, 14 December 2024)
- ML20086F861 + (07:13:40, 14 December 2024)
- ML20086F855 + (07:13:40, 14 December 2024)
- ML20086F843 + (07:13:41, 14 December 2024)
- ML20086F849 + (07:13:41, 14 December 2024)
- 05000277/LER-1976-011, Telecopy LER 76-011/01P:on 760219,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible + (07:13:42, 14 December 2024)
- 05000277/LER-1976-015, Telecopy LER 76-015/01P:allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible + (07:13:43, 14 December 2024)