PSILADELPHIA CLECTIC C kANY v' v
Peach Botton Atomic Power Station Delta, Pennsylvania 1731k September 19, 1975 h [e*p c p 4*
Mr. James P.
O'Reilly, Director Office of Inspection and Enforcement Region 1 Afas /[
$,ynsk United States Euclear Regulatory Commission 631 Park Avenue King Of Prus sia, Pennsylvania 19k06
Subject:
Abnormal Occurrence 2k-Hour 'Nofication Confirming W.
T. Ullrich's phone conversation with Mr. Valt Baunack,'
Rgion 1. United States Nuclear Regulatory Commission on September 19,1975.
Reference:
License Number DPR kk Technical Specification:
3;7.D.2 Report No.:
50-277-75-59
, Report Date:
September 19, 1975 Occurrence Date:
September 18, 1973
~
Facility:
Peach Bottos Atomic Power Station - Unit 2 R.D.
1 D e.lt a, Pennsylvania 1731L Identification of Occurrence:
TIP machine isolation valve failed to close.
Conditions Prior to Occurrence:
About 555 power.
Description of Occurrence:
Following routine operation of the No.
- h. T2P aschine, the ball valve failed to close automatically.
Designation of Apparent Cause of Occurrence:
Sticking or binding in the ball valve solenoid mechanism.
l-Analysis of Occurrence /"
The continuity of No. L TIP machine shear valfe was verified, b
and would have been capable of isolating the TIP guide tube if required.
The re=aining TIP machine ball valves were verified to be operational.
This occurrence has minimal safety implications.
Corrective Action:
+
The ball valve is De-Energize to close.
Proper operation of the TIP Logic was verified by removing the power feed to the valve and observing.
+
that the valve re=ained open.
A slight mechanical shock was applied to the valve =echanis=, closing it.
The machine was blocked to prevent operation until the valve operating mechanism can be inspected and adj us te d,
v.
Failure Data Ao 50-277-7k-25 8
Very Truly yours,
{
lW &
^
l W.
T.
Ullrich, Superintendent r
}
Peach Bottom Ato=ic Power Station t.