Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000423/LER-1995-019-02, :on 951201,leaks Found in 3/4 Inch Socket Welds on C RCS Loop Flow Instrumentation Line & RCP Seal Injection Drain Line.Caused by Vibration Induced Fatigue at Stress Riser in Weld.Welds & Weld Bosses Removed + (11:15:22, 13 December 2024)
- 05000361/LER-1995-016, :on 951127,omission in High Energy Line Break Analysis Occurred.Caused by Original UFSAR Section 3.6A Hypothesized High Energy Line Break Analysis Completed by Plant.Interim Compensatory Review Initiated + (11:15:24, 13 December 2024)
- ML20099L780 + (11:15:25, 13 December 2024)
- ML20099L783 + (11:15:25, 13 December 2024)
- ML20099L772 + (11:15:26, 13 December 2024)
- ML20099L757 + (11:15:27, 13 December 2024)
- ML20099L765 + (11:15:27, 13 December 2024)
- ML20099L747 + (11:15:28, 13 December 2024)
- ML20099L744 + (11:15:29, 13 December 2024)
- 05000458/LER-1995-010-02, :on 951130,reactor Thermal Power Limit Exceeded Due to Failure to Consider Required Heat Balance Inputs.No Recommended Corrective Actions Since All New Plant Designs Will Be Implemented as Mods + (11:15:31, 13 December 2024)
- ML20099L719 + (11:15:33, 13 December 2024)
- ML20099L721 + (11:15:33, 13 December 2024)
- 05000346/LER-1984-015-01, :on 841025,discovered Velan Valve Disc Could Be Rotated W/Force by Hand to Cause Antirotation Stop on Disc to Ride Onto Hanger Arm Antirotation Stop.Caused by Antirotation Stop Design.Mechanism Modified + (11:15:36, 13 December 2024)
- ML20099L714 + (11:15:37, 13 December 2024)
- ML20099L706 + (11:15:38, 13 December 2024)
- RC-95-0319, Forwards Response to NRC Re Violations Noted in Insp Rept 50-395/95-17.Corrective Actions:Mechanical Adjustments to Dampers within Ventilation Sys Have Been Corrected + (11:15:39, 13 December 2024)
- ML20099L700 + (11:15:47, 13 December 2024)
- 05000483/LER-1984-055, :on 841021,unplanned ESF Actuated Occurred Due to High Level Signal on Steam Generator A.Caused by Inadequate Preplanning.Procedure Rev Developed + (11:15:48, 13 December 2024)
- ML20099L683 + (11:15:50, 13 December 2024)
- 0CAN129504, Submits Info Re Manner in Which Basic Emergency Planning Info Disseminated to Public within ANO Plume Exposure Pathway Emergency Planning Zone During 1995 + (11:15:51, 13 December 2024)
- 2CAN129507, Requests Approval,Per 10CFR50.55a(a)(3) for Use of ASME Code Case N-533, Alternative Requirements for VT-2 Visual Exam of Class 1 Insulated Pressure-Retaining Bolted Connections, Section Xi,Div 1 by 960901 + (11:15:51, 13 December 2024)
- ML20099L667 + (11:15:52, 13 December 2024)
- ML20099L661 + (11:15:53, 13 December 2024)
- ML20099L657 + (11:15:53, 13 December 2024)
- U-602530, Attests That Util Has Completed Baseline Activities Required to Document Design Basis for Operation of Each GL 89-10 MOV at Facility + (11:15:54, 13 December 2024)
- ML20099L643 + (11:15:55, 13 December 2024)
- ML20099L625 + (11:15:56, 13 December 2024)
- ML20099L633 + (11:15:56, 13 December 2024)
- ML20099L608 + (11:16:00, 13 December 2024)
- ML20099L607 + (11:16:01, 13 December 2024)
- ML20099L597 + (11:16:01, 13 December 2024)
- ML20099L593 + (11:16:02, 13 December 2024)
- ML20099L592 + (11:16:03, 13 December 2024)
- ML20099L591 + (11:16:03, 13 December 2024)
- ML20099L589 + (11:16:04, 13 December 2024)
- ML20099L584 + (11:16:05, 13 December 2024)
- ML20099L580 + (11:16:06, 13 December 2024)
- ML20099L583 + (11:16:06, 13 December 2024)
- ML20099L574 + (11:16:07, 13 December 2024)
- ML20099L576 + (11:16:07, 13 December 2024)
- ML20099L572 + (11:16:11, 13 December 2024)
- ML20099L570 + (11:16:12, 13 December 2024)
- ML20099L566 + (11:16:13, 13 December 2024)
- 05000247/LER-1984-019, :on 841022,fire Occurred in Insulation of High Pressure Turbine.Caused by Oil Leak Through Insp Cover.Fire Extinguished & Leak Repaired + (11:16:14, 13 December 2024)
- ML20099L558 + (11:16:18, 13 December 2024)
- RBG-19-490, Provides Addl Info to Finalize SER Confirmatory Item 35, Table 1.3 Re Operator Info of Max Expected Errors for Water Level Measurements in Event of Drywell Heatup Normal Ambient Conditions + (11:16:19, 13 December 2024)
- ML20099L554 + (11:16:19, 13 December 2024)
- ML20099L544 + (11:16:20, 13 December 2024)
- ML20099L543 + (11:16:21, 13 December 2024)
- ML20099L540 + (11:16:22, 13 December 2024)
- ML20099L538 + (11:16:25, 13 December 2024)